Bliss Homes and Bliss Square

UPRERARegistered

Bliss Homes and Bliss Square is a RERA-registered residential project by MSS infracon Private Limited in Ghaziabad (RERA ID UPRERAPRJ5577). Registered with a completion deadline of 14 Jan 2023.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5577
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 May 2016
Original start1 May 2016
Project duration81 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressPLOT NO.- ML-1, NEAR PRITAM FARMS, KARPURIPURAM, GOVINDPURAM, GHAZIABAD
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 3 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. valid to

    Permit revalidated

    350/Masterplan Zone 3/2020

  7. to

    Extension granted

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. valid to

    Permit revalidated

    Group Housing/10286/GDA/BP/25-26/0426/16042026

  11. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion16 Oct 2020
Revised completion14 Jan 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary2 Mar 2026
Registration fee₹68,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors525 · 4 · 21 (units from plan)
Homes · commercial units282 · 243 (shops and offices filed in the same plan)
  • SHOP243 46%
  • 2 BHK138 26%
  • 3 BHK122 23%
  • 4 BHK20 4%
  • OTHER2 <1%
ConfigurationUnitsCarpet area
OTHER2383-620
SHOP2433-315
3 BHK12273-90
2 BHK13851-63
4 BHK20108
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower A & B · OTHER, SHOP, 3 BHK, 2 BHK214013-620
Tower C · OTHER, 2 BHK146051
Tower C1 · OTHER, 3 BHK154490
Tower C2 · OTHER, 4 BHK1420108
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Anurag Gupta
License CA/85/9138
Vastu Srijan, KB-34, Expreson tower, Sec-14, Kaushambi, Gaziabad
Engineer
Kamal Sabarwal
175, Pocket-E, Mayur Vihar Phase-II, Delhi-110091
Contractor
M/s SS Infratech
31 Omaxe Arcade Gold link-1, Greater NOIDA, UP
Sr.Development work declared to RERA
1Demarcation of Plots
As per approved plan of GDA 12 meter wide road and houses in North, others land in South 45 meter wide road in East and High School in West
2Boundary Wall
A combination of RCC and brick work in 2.1 meter high boundary wall with 60 centimeter high MS barbed wire fencing in residential area and 3 ft high hedge in commercial area.
3Road Work
Road work 100 mm thick trimix over RCC.
4Footpaths
Footpaths with pavers.
5Water Supply Including Drinking Water Facilities
Nagar nigam ghaziabad has agreed to provide drinking water connection vide Dated :- 4th may 2015 required connection charges amounting to rupees one lakh seventeen thousand only have already been paid
6Sewer System
Sewage of different towers shall be collected in a chamber which will we connected to nagar nigam sewerage network.( Permission has been granted by Nagar Nigam and the required amount Rupees Four lakh thirty thousand twenty five only for connection has been paid.)
7Drain
KC type drains have been provided on both side of road.
8Parks
Green lush environment has been proposed in open land with grass carpeting ,flowers beds and water bodies.
9Tree Planting
Low height plants have been provided on both sides of road wherever possible.
10Design For Electric Supply Including Street Lighting
Has been done and accordingly works including external lightning has been proposed.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
Disposal into Nagar Nigam Existing Sewerage line.
13Solid Waste Management And Disposal System
Door to door collection of solid waste has been proposed
14Water Conservation System
Rain water harvesting has been provided.
15Energy Management System Including Use of Renewable Energy
Solar energy system for street lights has been provided.
16Fire Protection And Fire Safety System
Fire protection and fire safety system has been provided in residential and commercial part.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Gym, Club House, Badminton Port, basket Ball, Kids Playground and swimming pool etc. has been provided.
18Emergency Evacuation Services
Separate staircase from Top to upper ground floor has been provided in each tower.
19Other Miscellaneous Work
24 hours security, intercom system in residential , power backup, sufficient parking has been provided.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1SHREE SAI ASSOCIATESUPRERAAGT11846
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 16 Oct 2020. 2 of them carry a revalidation, the latest valid to 16 Oct 2023.

Sanctioned by Ghaziabad Development Authority · 12,620 sqm of land · an approved plan of 4 blocks and 525 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
57 / 746 / Zone-3/ 15-1617 Oct 201516 Oct 2020—14 Jan 2023—
57 / 746 / Zone-3/ 15-1617 Oct 201516 Oct 202016 Oct 202314 Jan 202323 Oct 2020
valid to 16 Oct 2023
as 350/Masterplan Zone 3/2020
57 / 746 / Zone-3/ 15-1617 Oct 201516 Oct 20207 Dec 202814 Jan 202316 Oct 2023
valid to 16 Oct 2023
as Group Housing/10286/GDA/BP/25-26/0426/16042026
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 14 Jan 2023.

#Granted fromExtended uptoNote
116 Oct 202015 Apr 2021Six months extension in view of force majeure caused by covid-19 pandemic
215 Apr 202115 Apr 2022—
315 Apr 202214 Jan 2023—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot NO.ML-1,Karpuripuram12620Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 7691
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old30 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old30 Jul 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old30 Jul 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAs approved by Competent Authority
Fire safety (as filed with RERA)As approved by Competent Authority
Renewable energyAs approved by Competent Authority
Other facilitiesAs approved by Competent Authority

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

17 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

17 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMSS infracon Private Limited
RolePromoter · current
RERA IDUPRERAPRM6000
PANAAJCM6113A
CIN / TANU45400UP2015PTC069112
Name of chairman2. MANOJ AGARWAL
Registered addressPLOT NO.- ML-1, NEAR PRITAM FARMS, KARPURIPURAM, GOVINDPURAM, GHAZIABAD
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
MSS infracon Private LimitedBankHDFC BANKBranchD-44, RDC RAJNAGAR, GHAZIABADA/C no.IFSCHDFC0000153
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

6 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Permit paperwork
3 · Project Specifications
Project Specifications
newly filed with RERA
25 Sept 2026
Permit paperwork
3 · Floor Plan Of All Types
Floor Plan Of All Types
newly filed with RERA
25 Sept 2026
Permit paperwork
3 · Approved Map
Approved Map
newly filed with RERA
25 Sept 2026
Permit paperwork
3 · Sanctioned Letter
Sanctioned Letter
newly filed with RERA
25 Sept 2026
Permit paperwork
3 · Approved Layout
Approved Layout
newly filed with RERA
25 Sept 2026
Sanctioning permit
no. 3
57 / 746 / Zone-3/ 15-16
newly filed with RERA
25 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Bliss Homes and Bliss Square

Is Bliss Homes and Bliss Square RERA registered?

Yes. Bliss Homes and Bliss Square is registered with UPRERA under registration number UPRERAPRJ5577, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Bliss Homes and Bliss Square been completed?

UPRERA still lists Bliss Homes and Bliss Square as Registered, so it is not shown as completed here. A completion certificate dated 2 Mar 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Bliss Homes and Bliss Square?

MSS infracon Private Limited is the promoter entity that filed Bliss Homes and Bliss Square with UPRERA (promoter RERA ID UPRERAPRM6000). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Bliss Homes and Bliss Square more time to complete?

UPRERA's record carries 3 completion extensions for Bliss Homes and Bliss Square, the latest running to 14 Jan 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Bliss Homes and Bliss Square have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Bliss Homes and Bliss Square located?

Bliss Homes and Bliss Square is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Bliss Homes and Bliss Square?

The unit plan filed with UPRERA lists OTHER, SHOP, 3 BHK, 2 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Bliss Homes and Bliss Square?

The approved unit plan filed with UPRERA runs from 3 to 620 m² of carpet area (about 29 to 6,671 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Bliss Homes and Bliss Square?

The approved unit plan describes 4 blocks and 525 units of which 282 are homes and 243 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Bliss Homes and Bliss Square?

About 168 units per acre: 525 planned units across 3.12 acres (12,620 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗