Buland Vatika is a RERA-registered residential project by Buland Housing Pvt. ltd in Agra (RERA ID UPRERAPRJ9889). RERA status: Completed on 16 Apr 2026.
RERA status as reported: Completed.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ9889 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Completed |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Agra Development Authority |
| Proposed start | 1 Nov 2014 |
| Original start | 1 Nov 2014 |
| Project duration | 56 months |
| Address | Agra, Agra |
| Tehsil | Agra |
| Applicant type | Company |
| Applicant address | 1st Floor, Friends Wasan Plaza, Sanjay Place, Agra-02 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
102/BFT/06/14-15- ADA
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 15 Aug 2017 |
| Original completion | 30 Jun 2019 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 16 Apr 2026 |
| Registration fee | ₹1,17,500 |
| Sanctioning authority | Agra Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Individual Plots demarcatated at Site |
| 2 | Boundary Wall A 6 feet high wall with 3 feet deep foundation, constructed with Brick and Mortar. The exterior of Boundary walls are ( Textured, Painted with All Weather Paints, Tiled ….) |
| 3 | Road Work C.C. Road Work under progress |
| 4 | Footpaths Under Process with inter-locking tiles on both sides of road |
| 5 | Water Supply Including Drinking Water Facilities Overhead tank with borewell completed at site |
| 6 | Sewer System Sewer line has been layed to be connected in STP |
| 7 | Drain Drain construction under progress |
| 8 | Parks leveling of park & boundry wall work under progress |
| 9 | Tree Planting To planted after completion of Road & Park Work |
| 10 | Design For Electric Supply Including Street Lighting Load to be calculated by torent power and street lighting poles will erected after completion of road work. |
| 11 | Community Buildings N.A. |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage treatment plant has been constructed at site |
| 13 | Solid Waste Management And Disposal System As per Municipal Norms, sufficient dustbins will be placed to collect waste |
| 14 | Water Conservation System Rain Water Harvesting System work under progress individual units to be connected to Rain Water Harvesting System |
| 15 | Energy Management System Including Use of Renewable Energy STP Plant and Rain Water Harvesting system has been adopted |
| 16 | Fire Protection And Fire Safety System N.A. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A. |
| 18 | Emergency Evacuation Services N.A. |
| 19 | Other Miscellaneous Work N.A. |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 10 Sept 2019. 1 of them carries a revalidation, valid to 30 Aug 2019.
Sanctioned by Agra Development Authority · 22,417 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 102/BFT/06/14-15- ADA | 11 Sept 2014 | 10 Sept 2019 | 10 Sept 2021 | 30 Jun 2019 | — | |
| 102/BFT/06/14-15- ADA | 11 Sept 2014 | 1 Jan 2019 | 30 Sept 2019 | 30 Jun 2019 | 11 Sept 2014 valid to 30 Aug 2019 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 145 | 22417 | — |
| Khasra No. 145 (Part) | 13331 | Khasra |
| Khasra No. 145 (Part) | 4480 | Khasra |
| Khasra No. 145 (Part) | 4675 | Khasra |
3 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 31 May 2013.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| Book No. 1 Jild No. 5701 Page No. 285-398 S.No. 10 | 13 Sept 2013 | self | — |
| Book No.1 Jild No. 5443 Page no. 67-106 S.No. 6478 | 31 May 2013 | self | — |
| Book No. 1 Jild No. 5702 Page no. 221-272 S.No. 11 | 13 Sept 2013 | self | — |
| Registry document · Book No.1 - Jild No.5443 Page No. 67-106, Sl.No 6478 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Book No.1 - Jild No.5702 Page No. 221-272, Sl.No 11007 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · Book No.1 - Jild No.5701Page No. 295-398, Sl.No 11007 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 20 Jun 2018 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 20 Jun 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 20 Jun 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 20 Jun 2018 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 25 Mar 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 20 Jun 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 20 Jun 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 20 Jun 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 20 Jun 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 20 Jun 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 20 Jun 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 20 Jun 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 12 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 12 Aug 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 12 Aug 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | Borewell Supply to every house |
| Fire safety (as filed with RERA) | N.A. |
| Health service | N.A. |
| Renewable energy | N.A. |
| Other facilities | N.A. |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Buland Housing Pvt. ltd |
| Role | Promoter · current |
| RERA ID | UPRERAPRM19800 |
| PAN | AADCB0149B |
| CIN / TAN | U45200DL2006PTC228181 |
| Name of chairman | Sh. Phundi Lal Sharma |
| Registered address | 1st Floor, Friends Wasan Plaza, Sanjay Place, Agra-02 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Agra
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | BULAND HOUSING PVT. LTDBankBank of IndiaBranchSME BRANCHA/C no.IFSCBKID0007254 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| RERA status | registered → completed changed in Estanzo’s record | 23 Aug 2026 |
| RERA status | changed in Estanzo’s record · 23 Aug 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
Common questions about Buland Vatika
Is Buland Vatika RERA registered?
Yes. Buland Vatika is registered with UPRERA under registration number UPRERAPRJ9889, registered on 15 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has Buland Vatika been completed?
UPRERA lists Buland Vatika as completed, with a completion certificate dated 16 Apr 2026, against a filed deadline of 30 Jun 2019.
Who is the builder of Buland Vatika?
Buland Housing Pvt. ltd is the promoter entity that filed Buland Vatika with UPRERA (promoter RERA ID UPRERAPRM19800). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Buland Vatika have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Buland Vatika located?
Buland Vatika is registered in Agra, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗