CAPABLE THE EMPORIA

UPRERARegistered

CAPABLE THE EMPORIA is a RERA-registered commercial project by Capable Buildwell Private Limited in Ghaziabad (RERA ID UPRERAPRJ769268). Registered with a completion deadline of 13 Sept 2024. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ769268
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start15 Mar 2019
Project duration66 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressB-51/3 Corentham Tower, Sector-62, Noida.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP20180120154840230

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered23 Apr 2019
Original completion14 Mar 2024
Revised completion13 Sept 2024
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,10,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors599 · 2 · 9 (units from plan)
Homes · commercial units182 · 417 (shops and offices filed in the same plan)
  • SHOP417 70%
  • OTHER182 30%
ConfigurationUnitsCarpet area
SHOP4175-34
OTHER18231-67
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block-A · SHOP, OTHER92875-67
Block-B · SHOP, OTHER93125-67
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Anuj Agarwal
License CA/96/19503
A-244, Kaushambi, Ghaziabad-201010
Engineer
Mr. Arvind Gupta
E-296, LGF, East of Kailash, New Delhi-110065
Contractor
Mr. Jagshoran Singh
F-504 and 505 Aditya Corporate hub, A-12, RDC Rajnagar Ghaziabad
Sr.Development work declared to RERA
1Demarcation of Plots
Total Plot Area of 23,200 Sq. Mtrs. Located in Khasra no. 919 situated in Village Noor Nagar, Pargana Loni, District Ghaziabad, U.P.
2Boundary Wall
Rcc / brick wall and m s railing along the total land area of all phases combined.
3Road Work
All internal roads in p.c.c / trimix.
4Footpaths
Interlocking pavers.
5Water Supply Including Drinking Water Facilities
Water supply through underground/ overhead tanks
6Sewer System
Underground sewer line with required slope and adequate manholes.
7Drain
Underground system with adequate catch basins and manholes.
8Parks
Not applicable
9Tree Planting
A varieties of green trees.
10Design For Electric Supply Including Street Lighting
Common high side for all phases combined and it supply to the project. sufficient lighting as per services and landscape norms.
11Community Buildings
Not applicable
12Treatment and Disposal System of Sewage and Sullage water
Common stp for all phases combined. treated water shall be used for flushing, irrigation and pathways cleaning.
13Solid Waste Management And Disposal System
Manual collection and disposal to external municial waste.
14Water Conservation System
Rain water harvesting pits to be provided as per authority norms.
15Energy Management System Including Use of Renewable Energy
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/power supply company.
16Fire Protection And Fire Safety System
Fire sprinklers, fhc with pump to be provided as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not applicable
18Emergency Evacuation Services
Staircases shall be provided in Basement & all floors of the building for fire/emergency exit as per norms.
19Other Miscellaneous Work
Not applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Sachan Estate Pvt LtdUPRERAAGT10143
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 16 Jan 2024.

Sanctioned by Ghaziabad Development Authority · 9,950 sqm of land · an approved plan of 2 blocks and 599 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
MAP2018012015484023017 Jan 201916 Jan 202415 Jan 202714 Mar 2024
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 13 Sept 2024.

#Granted fromExtended uptoNote
114 Mar 202413 Sept 2024Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
91923200Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Bahi No. 1, Zild No. 13094,Pg No. 47 to 68, Serial No.11025
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Bahi No. 1, Zild No.13094, Pg No. 69 to 90, Serial No. 11026
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Bahi No. 1, Zild No. 13063, Pg No. 249 to 276, Serial No. 10735
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New2 Apr 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New26 Mar 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New26 Mar 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New26 Mar 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New26 Mar 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New26 Mar 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New26 Mar 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New26 Mar 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New26 Mar 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New26 Mar 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Mar 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New26 Mar 2019 ↗

Quarterly progress reports

17 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

17 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameCapable Buildwell Private Limited
RolePromoter · current
RERA IDUPRERAPRM75091
PANAAHCC1946K
CIN / TANU70100DL2017PTC323717
Name of chairmanSandeep Gupta
Registered addressB-51/3 Corentham Tower, Sector-62, Noida.
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
CAPABLE BUILDWELL PRIVATE LIMITED COLLECTION ACCOUNT FOR THE EMPORIABankAXIS BANKBranchSECTOR-62, NOIDABranch addressGROUND FLOOR, PLOT NO A-41, THE CORENTHUM, SEC-62 NOIDA Corenthum, Sec-62 nOidaBranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCUTIB0000723
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
CAPABLE BUILDWELL PRIVATE LIMITED THE EMPORIA RERA A/C 405677777777BankRATNAKAR BANK LIMITEDBranchJAGRITI ENCLAVEBranch addressJAGRITI ENCLAVE, ANAND VIHAR, DELHI-110092Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCRATN0000214
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
CAPABLE BUILDWELL PVT LTD-RERA TRANSACTION A/C FOR THE EMPORIABankAXOS BANKBranchSECTOR-62, NOIDABranch addressGROUND FLOOR, PLOT NO. A-41, THE CORENTHUM, SECTOR-62 NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCUTIB0000723
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Filed document
viewprojects · 17
ENGINEERS CERTIFICATE
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 16
ARCHITECT CERTIFICATE
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 15
CA CERTIFICATE
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 14
Affidavit (Form-B)
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 13
Development Work Plan
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 12
Electricity Supply Plan
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 11
Water Supply Plan
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 10
Waste Disposal Plan
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 9
Proforma of Conveyance Deed
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 8
Proforma of Allotment Letter
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 7
Proforma of Application Form
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 6
Other Plan(If Any)
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 5
Commencement Certificate
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 4
Details of Encumbrances
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 3
Proforma of Completion Certificate(Occupancy)
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 2
Other Plan(If Any)
newly filed with RERA
15 Oct 2026
Filed document
viewprojects · 1
Details of Encumbrances
newly filed with RERA
15 Oct 2026
Filed document
summary · 18
Commencement Certificate
no longer on the record
15 Oct 2026
Filed document
summary · 17
Proforma of Application Form
no longer on the record
15 Oct 2026
Filed document
summary · 16
Proforma of Allotment Letter
no longer on the record
15 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CAPABLE THE EMPORIA

Is CAPABLE THE EMPORIA RERA registered?

Yes. CAPABLE THE EMPORIA is registered with UPRERA under registration number UPRERAPRJ769268, registered on 23 Apr 2019. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CAPABLE THE EMPORIA?

The completion date filed with UPRERA is 13 Sept 2024. No completion certificate is on record yet.

Who is the builder of CAPABLE THE EMPORIA?

Capable Buildwell Private Limited is the promoter entity that filed CAPABLE THE EMPORIA with UPRERA (promoter RERA ID UPRERAPRM75091). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does CAPABLE THE EMPORIA show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted CAPABLE THE EMPORIA more time to complete?

UPRERA's record carries 1 completion extension for CAPABLE THE EMPORIA, the latest running to 13 Sept 2024. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does CAPABLE THE EMPORIA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CAPABLE THE EMPORIA located?

CAPABLE THE EMPORIA is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in CAPABLE THE EMPORIA?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CAPABLE THE EMPORIA?

The approved unit plan filed with UPRERA runs from 5 to 67 m² of carpet area (about 52 to 723 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CAPABLE THE EMPORIA?

The approved unit plan describes 2 blocks and 599 units of which 182 are homes and 417 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CAPABLE THE EMPORIA?

About 244 units per acre: 599 planned units across 2.46 acres (9,950 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗