CASA GRANDE-2 is a RERA-registered residential project by EARTHCON CONSTRUCTIONS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ4491). Registered with a completion deadline of 5 Oct 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ4491 |
| Project category | Residential |
| Registration type | Ongoing |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Greater Noida Authority |
| Proposed start | 4 Mar 2013 |
| Original start | 4 Mar 2013 |
| Project duration | 164 months |
| Address | GH-06C, Sector Chi-05, Greater Noida, Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | T-17,D D Flat, Jasola Vihar, New Delhi-110025 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (2)
5 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
- valid to
Permit revalidated
NIYO/2023/972
- valid to
Permit revalidated
NIYO/2025/1854
Completion certificate filed
- to
Extension granted
Completion certificate filed
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 8 Aug 2017 |
| Original completion | 31 Dec 2020 |
| Revised completion | 5 Oct 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 16 Aug 2025 |
| Registration fee | ₹96,000 |
| Sanctioning authority | Greater Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 1 BHK254 44%
- 2 BHK210 36%
- 3 BHK108 19%
- SHOP10 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 108 | 91-104 |
| 2 BHK | 210 | 62-70 |
| 1 BHK | 254 | 19-34 |
| SHOP | 10 | 16-101 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A2 · 3 BHK, OTHER | 20 | 108 | 91-104 |
| B1 · 2 BHK, OTHER | 20 | 105 | 62-70 |
| B2 · 2 BHK, OTHER | 20 | 105 | 62-70 |
| Beetle Suites · 1 BHK, SHOP, OTHER | 19 | 264 | 16-41 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Front Side 24 meter. wide road , Back Side Abadi Expansion, Right side plot no. GH-06B & Left Side Informal |
| 2 | Boundary Wall 2.1meter. Hight boundary wall and 547.45meter. Long |
| 3 | Road Work 6meter. wide Internal Road & 6meter. Wide road around the tower for circulation |
| 4 | Footpaths 927.891 sq. m.( Area of Footpath) |
| 5 | Water Supply Including Drinking Water Facilities Under Ground Water Tank 200 KL Raw Water & 200 KL Treated water Tank external water Supply with Distribution . |
| 6 | Sewer System External Sewerage with STP |
| 7 | Drain External storm water drainage with RWH |
| 8 | Parks Total Landscaping Area including road 7237.667 Sq.Meter |
| 9 | Tree Planting No of proposed Tree-144 and No of proposed evergreen tree-72 |
| 10 | Design For Electric Supply Including Street Lighting Total load of Project 5061 KW the capacity of transformer is 5210 KVA & the transformer of 2 nos of 2000 KVA Load & Transformer of 1250 KV(Total Electric load=3419.67 KV) |
| 11 | Community Buildings Yes, One community centre (G+1) is planned. |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP of 600 KLD with 300 KL of treated effluent Storage tank for flushing Gardening System. |
| 13 | Solid Waste Management And Disposal System Solid Waste Management System is planned as Per inviorment clearance by (EIA). |
| 14 | Water Conservation System Rain Water Harvesting System 4 nos of 4.35 m dia x 4.50 m (Depth) RWH well with 1.50m x 1.50m De-silt and 300mm dia x 25 m boring. |
| 15 | Energy Management System Including Use of Renewable Energy As per guidelines of ministry of renewable energy Govt. of India. |
| 16 | Fire Protection And Fire Safety System Sprinklers And Alarm Sytem are proposed for towers more than 60m ht. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N.A. |
| 18 | Emergency Evacuation Services As per fire norms & fire NOC is received |
| 19 | Other Miscellaneous Work Commmunity building & water body |
Registered agents
1 agent
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
Permits & extensions
5 permits
An approval and the date it runs to - not proof the work matching it was done.
5 sanctioning permits are on record with UPRERA, the latest valid to 4 Mar 2018. 4 of them carry a revalidation, the latest valid to 6 Oct 2025.
Sanctioned by Greater Noida Authority · 17,246.55 sqm of land · an approved plan of 4 blocks and 582 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| PLG/BP-3025/GH/OPA-1488 | 4 Mar 2013 | 4 Mar 2018 | 5 Mar 2023 | 31 Dec 2020 | — | |
| PLG/BP-3025/GH/OPA-1488 | 4 Mar 2013 | 4 Mar 2018 | 6 Oct 2025 | 30 Jun 2021 | 4 Mar 2013 valid to 6 Oct 2025 | |
| PLG/BP-3025/GH/OPA-1488 | 4 Mar 2013 | 4 Mar 2018 | 5 Oct 2030 | 6 Oct 2025 | 4 Mar 2013 valid to 6 Oct 2025 | |
| PLG/BP-3025/GH/OPA-1488 | 4 Mar 2013 | 4 Mar 2018 | 4 Oct 2030 | 6 Oct 2025 | 21 Dec 2021 valid to 6 Oct 2025 as NIYO/2023/972 | |
| PLG/BP-3025/GH/OPA-1488 | 4 Mar 2013 | 4 Mar 2018 | 5 Oct 2030 | 6 Oct 2025 | 7 Nov 2024 valid to 6 Oct 2025 as NIYO/2025/1854 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 3 completion extensions for this project, the latest running to 5 Oct 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2020 | 30 Jun 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
| 2 | 30 Jun 2021 | 6 Oct 2025 | — |
| 3 | 6 Oct 2025 | 5 Oct 2026 | — |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-06C | 18154 | Plot |
| Lease deed · 20081 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 4 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 3 Jul 2018 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 3 Jul 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 3 Jul 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 3 Jul 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 3 Jul 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 3 Jul 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 4 Jul 2018 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Jul 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Jul 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 23 Feb 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 23 Feb 2018 ↗ |
Quarterly progress reports
26 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
26 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | 31.4% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | 31.4% | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | 32.74% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | 33.65% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | 34.9% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | 37.87% | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | 42.16% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | 47.66% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | 50.86% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | 53.96% | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | 56.98% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | 60.03% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | 63.05% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | 66.21% | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | 71.3% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | 75.3% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 81.3% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 85.3% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 88.32% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 90.71% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | EARTHCON CONSTRUCTIONS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM5849 |
| PAN | AABCE5693F |
| CIN / TAN | DELE04226F |
| Name of chairman | MR. SHADAB KHAN |
| Registered address | T-17,D D Flat, Jasola Vihar, New Delhi-110025 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | EARTHCON CONSTRUCTIONS PVT LTD COLLECTION ACCOUNT CASA GRANDE2BankINDUSIND BANK LTDBranchSECTOR-18Branch addressGROUND FLOOR,SHOP NO-18,18A,18B,ANSAL FORTUNE ARCADE,CAPTAIN VIJAYANT THAPAR,,POCKETE,SECTOR-18,NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036Branch emailramesh.rawatindusind.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Earthcon Constructions Pvt Ltd Separate Bank Account Casa Grande2BankIndusind Bank LtdBranchSector-18Branch addressGround Floor, Shop No-18,18A,18B, Ansal Fortune Arcade, Captain Vijayant Thapar Marg, PocketE, Sector-18,Noida,Gautam Budh Nagar,Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036Branch emailramesh.rawatindusind.com |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | EARTHCON CONSTRUCTION PVT LTD TRANSACTION ACCOUNT CASA GRANDE2BankINDUSIND BANK LTDBranchSECTOR-18Branch addressGROUND FLOOR ,SHOP NO-18,18A,18B,ANSAL FORTUNE ARCADE, CAPTAIN VIJAYANT THAPAR MARG, POCKET-E, SECTOR-18, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036Branch emailramesh.rawat indusind.com |
What has changed on this record
10 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 148 (Under Registration - 2 ) → 149 (Under Registration - 3 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 148 (Under Registration - 3 ) → 148 (Under Registration - 2 ) changed in Estanzo’s record | 23 Sept 2026 |
| Quarterly progress report 2026-Q1 | QPR 2026-Q1 newly filed with RERA | 23 Sept 2026 |
| Revised completion date on file | 2025-10-06 → 2026-10-05 changed in Estanzo’s record | 17 Sept 2026 |
| Completion extension no. 3 | extension 3 to 2026-10-05 newly filed with RERA | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 147 (Under Registration - 2 ) → 148 (Under Registration - 3 ) changed in Estanzo’s record | 13 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 146 (Under Registration - 1 ) → 147 (Under Registration - 2 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 146 (Under Registration - 4 ) → 146 (Under Registration - 1 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 145 (Under Registration - 3 ) → 146 (Under Registration - 4 ) changed in Estanzo’s record | 23 Aug 2026 |
| Revised completion date on file | changed in Estanzo’s record · 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 1 Oct 2026 · 6 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about CASA GRANDE-2
Is CASA GRANDE-2 RERA registered?
Yes. CASA GRANDE-2 is registered with UPRERA under registration number UPRERAPRJ4491, registered on 8 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.
Has CASA GRANDE-2 been completed?
UPRERA still lists CASA GRANDE-2 as Registered, so it is not shown as completed here. A completion certificate dated 16 Aug 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of CASA GRANDE-2?
EARTHCON CONSTRUCTIONS PRIVATE LIMITED is the promoter entity that filed CASA GRANDE-2 with UPRERA (promoter RERA ID UPRERAPRM5849). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted CASA GRANDE-2 more time to complete?
UPRERA's record carries 3 completion extensions for CASA GRANDE-2, the latest running to 5 Oct 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does CASA GRANDE-2 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is CASA GRANDE-2 located?
CASA GRANDE-2 is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in CASA GRANDE-2?
The unit plan filed with UPRERA lists 3 BHK, 2 BHK, 1 BHK, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in CASA GRANDE-2?
The approved unit plan filed with UPRERA runs from 16 to 104 m² of carpet area (about 173 to 1,119 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in CASA GRANDE-2?
The approved unit plan describes 4 blocks and 582 units of which 572 are homes and 10 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is CASA GRANDE-2?
About 137 units per acre: 582 planned units across 4.26 acres (17,246.55 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗