CENTRAL IKON

UPRERARegistered

CENTRAL IKON is a RERA-registered commercial project by BUSINESS BAY FIN INFRA PRIVATE LIMITED in NOIDA, Gautam Budh Nagar (RERA ID UPRERAPRJ805659). Registered with a completion deadline of 26 May 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
36.8%Q3'25
46.29%Q4'25
58.14%Q1'26
88.4%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ805659
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Aug 2024
Project duration58 months
AddressPLOT NO. SDC-H-01, SECTOR-105, NOIDA, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressC-01, Sector-120, Noida, Noida, Gautam Buddha Nagar- 201301, Uttar Pradesh
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2024/04/03/10448

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered10 Jul 2024
Original completion26 May 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,35,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors487 · 2 · 20 (units from plan)
Homes · commercial units363 · 124 (shops and offices filed in the same plan)
  • OTHER363 75%
  • SHOP124 25%
ConfigurationUnitsCarpet area
SHOP1249-488
OTHER3639-428
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
CENTRAL IKON · SHOP, OTHER204559-488
CENTRAL IKON PODIUM · SHOP13218-319
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 2,179.71 m² for a OTHER, 1,668.78 m² for a OTHER, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
GIAN P. MATHUR
License CA/80/5769
GIAN P. MATHUR AND ASSOCIATES PRIVATE LIMITED, C-28, EAST OF KAILASH, NEW DELHI
Engineer
PRABHAT BANSAL
VINETEC CONSULTANT, C-35, PAMPOSH ENCLAVE, GR. KAILASH, NEW DELHI
Contractor
GAMUT BUILDCON PRIVATE LIMITED
I-69, GAMA -2, Greater Noida, G.B. NAGAR-201308
Sr.Development work declared to RERA
1Demarcation of Plots
THE PROJECT LAND HAS BEEN DEMARKETED WITH BOUNDRY WALL TO THE EXACT SHAPE AND SIZE AS PER THE SITE PLAN SANCTIONED BY NOIDA AUTHORITY LOCATED AT PLOT NO. SDC-H-01, SECTOR-105, NOIDA.
2Boundary Wall
2400 MM HIGH BOUNDRY WALL OF COMBINATION OF RCC COULMN/BEAM WITH BRICK WORK.
3Road Work
MAIN ROAD EAST SIDE 75MTR S WIDE ROAD AND WEST SIDE 24 MTR WIDE ROAD. ROAD WORK PROPOSED WITH BLACK TOP ROAD.
4Footpaths
FOOTPATH IS PROPOSED WITH COMBINATION OF KERV STONE/PAVERS ON COMPACTED SUB GRID WHICH WILL BE LASTING AND VISIBLE AT ALL CONDITIONS.
5Water Supply Including Drinking Water Facilities
FOR CONSTRUCTION, TREATED WATER WILL BE PROVIDED THROUGH PRIVATE WATER TANKERS OR NEAR BY STP. FOR DRINKING PURPOSE, WATER WILL BE SUPPLIED THROUGH FACILITIES PROVIDED IN EXISTING PROJECT.
6Sewer System
345 KLD CAPACITY S.T.P WILL BE CONSTRUCTED AT THE SITE AND WASTE SHALL BE CARRIED DOWN IN SEPARATE INDIPENDENTLY VENTED PIPES, TOW PIPES, DRAINAGE SYSTEM SHALL BE ADOPTED AS PER STANDARD.
7Drain
SEPARATE DRAIN AND INIPENDENT RAIN WATER DRAINAGE SYSTEM SHALL BE PROVIDED FOR COLLECTION RAIN WATER FROM TERRACE / PAVED AREA, LAWN AND ROADS WILL ROUTE TO RECHARGE PITS.
8Parks
AS PER APPOVED MAP LANDSCAPE AREA IS 50 PERCENT OF OPEN AREA, PURPOSED GREEN AREA 2337.562 SQ. MTRS FOR LAND SCAPING GREEN PARKS AND TREES SHOWING IN ATTACHED SACNTIONED MAP.
9Tree Planting
THE TREE PLANTAION IN PROJECT WILL BE DONE AS PER SANCTION PLAN APPROVED BY NOIDA AUTHORITY, 46 TREES REQUIRED AND PROPOSED AS PER ATTACHED SANCTION DRAWINGS.
10Design For Electric Supply Including Street Lighting
33 KVA INCOMING SUPPLY FROM UPPCL SHALL BE OBTAINED AND AFTER CONVERSION IT INTO 440 V SUPPLY SHALL BE FEED TO THE ENTIRE SYSTEM. THE SWITCHES WITH TIMER CONTROL FOR STREET LIGHTS SHALL PROVIDED THE LUX LABEL SHALL MEET AS PER NBC 2016 GUIDE LINES.
11Community Buildings
THE PROVISION OF COMMUNITY BUILDING IS NOT APPLICABLE BY SANCTIONED PLAN AS APPROVED BY NOIDA AUTHORITY.
12Treatment and Disposal System of Sewage and Sullage water
THE PROVISION OF SEWAGE TREATEMENT PLANT FOR TRETATMENT OF SEWAGE AND SULLAGE WET, THE PLANT SHALL COMPRISE OF PRIMERY AND SECONDARY CHEMICAL AND BIOLOGICAL TREATEMENT PLANT.
13Solid Waste Management And Disposal System
THE SOLID WASTE WILL BE SEGREGATED AT SOURCE AND COLLECTED THOUGH TRAINED EMPLOYED PERSONEL . DEDICATED COVERED AND ISOLATED SITE FOR STORAGE OF WASTES . ADEQUET NO. OF COLORED BINS,( GREEN, BLUE AND DARK GREY} SEPARATE FOR BIO DEGRADBLE AND NON BIO DEGRADEBLE ARE PROPOSED TO BE PROVIDED AT STRATEGIC LOCATION WITHIN SITE. STP SLUDGE IS PROPOSED TO BE USED FOR HORTICULTURE PURPOSE AS A MANURE. HORTICULTURE WASTE IS COMPOSTED AND USED FOR GARDENING PURPOSE.
14Water Conservation System
THE PROVISION OF RAIN WATER HARVESTING WILL BE DONE AS PER APPLICABLE NORMS.
15Energy Management System Including Use of Renewable Energy
LESS OR NON MOVEMENT AREA, SENSOR SHALL BE PROVIDED. HIBRID SOLAR SYSTEM SHALL BE PROVIDED AS RENEWABLE ENERGY. IT WILL BE SYNCRONISING WITH MAIN SUPPLY.
16Fire Protection And Fire Safety System
AS PER FIRE NOC NO. UPFC/2024/117738/GBN/GAUTAMBUDDH NAGAR/ 26351/JD ON DOCUMENTS, FIRE PROTECTION AND FIRE SAFETY EQUIPMENTS AND SYSTEM WII BE PROVIDED IN ACCORADANCE WITH THE FIRE SAFETY NORMS AND NBC 2016
17Social Infrastructure And Other Public Amenities Including Public Health Services
SOCIAL INFRASTRUCTURE AND OTHER PUBLIC AMENITIES INCLUDING PUBLIC HEALTH SERVICE WILL BE PROVIDED AS PER NORMS OF CONCERNED AUTHORITY.
18Emergency Evacuation Services
EMERGENCY EVACUATION SERVICE WILL BE PROVED AS PER SAFETY NORM OF NBC 2016
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1WEST WAY REALTY SERVICES PRIVATE LIMITEDUPRERAAGT21913
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 May 2029.

Sanctioned by Noida Authority · 12,499 sqm of land · an approved plan of 2 blocks and 487 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2024/04/03/1044827 May 202426 May 202926 May 203226 May 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

23 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
SDC-H-0112499.50Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 1394
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
General body resolution
The resolution authorising an apartment owners’ association to act as the registering entity.
not reported—
Affidavit on balance development work
The promoter’s sworn statement about the development work still to be finished.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New2 Jul 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New2 Jul 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New2 Jul 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New2 Jul 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 May 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 May 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 May 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 May 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Jul 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New2 Jul 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New29 May 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New29 May 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New10 Jul 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New4 Jul 2024 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2024-Q2 to 2026-Q2.

QuarterConstructionCertificates
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q236.8%CA ↗ · Arch ↗ · Eng ↗
2025-Q346.29%CA ↗ · Arch ↗ · Eng ↗
2025-Q458.14%CA ↗ · Arch ↗ · Eng ↗
2026-Q188.4%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameBUSINESS BAY FIN INFRA PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM290842
PANAAMCB4225B
CIN / TANMRTB07892D
Name of chairmanBALRAJ SINGH
Registered addressC-01, Sector-120, Noida, Noida, Gautam Buddha Nagar- 201301, Uttar Pradesh
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S BUSINESS BAY FIN INFRA PVT LTD COLLECTION ACCOUNT FOR CENTRAL IKONBankAU SMALL FINANCE BANK LIMITEDBranchSECTOR -50 NOIDABranch addressB 1/14, Basement & Ground, Central Market, Sector-50, Noida-201303Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCAUBL0002564Branch emailAMBRISH.KUMAR@AUBANK.IN
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S BUSINESS BAY FIN INFRA PVT LTD SEPARATE BANK ACCOUNT FOR CENTRAL IKONBankAU SMALL FINANCE BANK LIMITEDBranchSECTOR-50, NOIDABranch addressB 1/14, Basement and Ground, Central Market, Sector-50, Noida-201303Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCAUBL0002564
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S BUSINESS BAY FIN INFRA PVT LTD RERA TRANSACTION ACCOUNT FOR CENTRAL IKONBankAU SMALL FINANCE BANK LIMITEDBranchSECTOR-50, NOIDABranch addressB 1/14, Basement and Ground, Central Market, Sector-50, Noida-201303Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCAUBL0002564
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
13 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CENTRAL IKON

Is CENTRAL IKON RERA registered?

Yes. CENTRAL IKON is registered with UPRERA under registration number UPRERAPRJ805659, registered on 10 Jul 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CENTRAL IKON?

The completion date filed with UPRERA is 26 May 2029. No completion certificate is on record yet.

Who is the builder of CENTRAL IKON?

BUSINESS BAY FIN INFRA PRIVATE LIMITED is the promoter entity that filed CENTRAL IKON with UPRERA (promoter RERA ID UPRERAPRM290842). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does CENTRAL IKON have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CENTRAL IKON located?

CENTRAL IKON is registered in NOIDA, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in CENTRAL IKON?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CENTRAL IKON?

The approved unit plan filed with UPRERA runs from 9 to 488 m² of carpet area (about 92 to 5,249 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CENTRAL IKON?

The approved unit plan describes 2 blocks and 487 units of which 363 are homes and 124 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CENTRAL IKON?

About 158 units per acre: 487 planned units across 3.09 acres (12,499 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗