CENTRAL PARK APARTMENT

UPRERARegistered

CENTRAL PARK APARTMENT is a RERA-registered residential project by AZAD AHMAD KHAN in Jhansi (RERA ID UPRERAPRJ112333). Registered with a completion deadline of 15 Dec 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
46.38%Q3'25
47.68%Q4'25
49.44%Q1'26
50.53%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ112333
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryJhansi Development Authority
Proposed start31 Oct 2019
Project duration86 months
AddressJhansi, Jhansi
TehsilJhansi
Applicant typeIndividual
Applicant address315 CHAMAN GANJ SIPRI BAZAR JHANSI
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (2)

  2. 3 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Nov 2019
Original completion20 Aug 2024
Revised completion15 Dec 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,19,000
Sanctioning authorityJhansi Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors593 · 4 · 13 (units from plan)
Homes · commercial units592 · 1 (shops and offices filed in the same plan)
  • 3 BHK288 49%
  • 2 BHK204 34%
  • 1 BHK100 17%
  • SHOP1 <1%
ConfigurationUnitsCarpet area
2 BHK20467
3 BHK28893-112
1 BHK10026-37
SHOP1795
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · OTHER, 2 BHK, 3 BHK1324067-112
B · OTHER, 2 BHK, 3 BHK1325267-112
C · OTHER, 1 BHK710026-37
SHOP · SHOP11795
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Priyen Niranjan Gajjar
License COA-CA/2017/87399
NW 52, soamibagh agra
Engineer
Niranjan Gajjar
NW 52, soamibagh agra
Contractor
Ram Kumar Singh
S 70, Sangam vihar near awas vikas near fauji chauraha, jhansi
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
Boundry wall at site will be made of fly ash / clay bricks with column and beam structure. The height of the boundry wall will be 6 feet. Plaster will be done on both side of the boundry wall after that two coat of paints will be coated.
3Road Work
Concrete / apex roads will be made at site. The base of the road will be filled with red moram, after that two layers of aggregate 40mm will be laid to make sure that the base of the road is upto the mark, after this the top layer will be of coloured and black and white apex. Road will be 9mtr. to 12mtr. wide.
4Footpaths
Footpaths will be made by interlocking type b concrete block pavers with a minimum path width of 1.5 mtr and thickness of 80mm.
5Water Supply Including Drinking Water Facilities
For Water Supply we have a provision of boring water as well as govt water supply from jal nigam. Water supply Provision will be provided via system of pumps and pipes. Water will get stored in underground tanks and from there water will get supplied to overhead tanks. Each block contains overhead tanks from where the water will get supllied to the units and common areas. This water is used for drinking and daily use purposes.
6Sewer System
Sewage treatment plant will be constructed at site, all water drains and waste drain will come and connect in this Sewage treatment plant. This sewage treatment plant will filter the water and that will be reused for plantation.
7Drain
Drain will be made below the foothpaths with chambers at 10mtr distance.Drains will be made with brick work and PVC pipes of different dia. the water from flats will come through pvc pipes in this drains and a proper slope will be maintained till STP plant. The water will get collected through drains in STP plant.There will be seperate drain for each tower.
8Parks
Total Number of Parks provided is 3 nos, 1st park is located at the entry gate 2nd park is located in the center of Tower A and .3rd park is located at the center of Tower B. These park can be used as childrens play area, jogging, sitout space etc.
9Tree Planting
we will plant 1000 trees all over the campus and in the garden as well
10Design For Electric Supply Including Street Lighting
Iron poles with street lights will be placed all over the campus and proper electrification with transformers and wires will be done as shown in the layout. Electrification will be done in all flats also with ISI mark wires,modular switches with proper earthing arrangements.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Sewage treatment plant will be constructed at site, all water drains and waste drain will come and connect in this Sewage treatment plant. This sewage treatment plant will filter the water and that will be reused for plantation. .
13Solid Waste Management And Disposal System
NA
14Water Conservation System
water conservation system will be provided on site in this we will make bore in different point in the gardens as well as in the common areas. in this we store rain water below the land and stock that water to flush out from drains at the time of rainy seasons.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
as per fire fighting norms we have provided all fire fighting measures and safety features as such as fire fighting systems, smoke extraction, fire alarms , sprinklers, hosereels, fire extinguishers, heat detection systems,call points , electrical pumps generators, diesel pumps, jockey pumps, overhead tanks with required capacity, underground tanks with required capacity and other amenities as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
providing toddlers park, childrens play station, sitout areas, jogging tracks, lush green gardens commercial complex for daily needs and services, car wash area , power backups etc.
18Emergency Evacuation Services
Emergency Evacuation Services is provided. in this main stair, fire stairs, refuse area, emergency exits is provided at each floor of the building
19Other Miscellaneous Work
8 lifts is provided in the building. Boom Barriers at main entry gate , CCTV cameras all over the campus, seperate car parking space.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 20 Aug 2024. 2 of them carry a revalidation, the latest valid to 16 Aug 2026.

Sanctioned by Jhansi Development Authority · 22,738 sqm of land · an approved plan of 4 blocks and 593 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
MAP2018121414490841321 Aug 201920 Aug 202420 Aug 202420 Aug 2024—
MAP2018121414490841321 Aug 201920 Aug 202416 Aug 202619 Feb 202521 Aug 2019
valid to 16 Aug 2026
MAP2018121414490841321 Aug 201920 Aug 202416 Aug 202619 Feb 202521 Aug 2019
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 15 Dec 2026.

#Granted fromExtended uptoNote
120 Aug 202415 Dec 2026Six months extension in view of force majeure caused by covid-19 pandemic
219 Feb 202515 Dec 2026—
316 Aug 202615 Dec 2026Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2/3/227993.93Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 125
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1425-1430
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New9 Nov 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New19 Sept 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New9 Nov 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New19 Sept 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New9 Nov 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New9 Nov 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New9 Nov 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New9 Nov 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New9 Nov 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New9 Nov 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New9 Nov 2019 ↗

Quarterly progress reports

26 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

26 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q246.38%CA ↗ · Arch ↗ · Eng ↗
2025-Q347.68%CA ↗ · Arch ↗ · Eng ↗
2025-Q449.44%CA ↗ · Arch ↗ · Eng ↗
2026-Q150.53%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAZAD AHMAD KHAN
RolePromoter · current
RERA IDUPRERAPRM97013
PANACXPK7840F
Registered address315 CHAMAN GANJ SIPRI BAZAR JHANSI
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Jhansi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
AZAD AHMAD KHANBankALLAHABAD BANKBranchNANDANPURA SHIVPURI ROAD JHANSIA/C no.IFSCALLA0212246
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

7 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
Revised completion date on file2026-12-16 → 2026-12-15
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 3 — extended upto
2026-12-16 → 2026-12-15
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 2 — extended upto
2026-08-16 → 2026-12-15
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2025-02-19 → 2026-12-15
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-08-16 → 2026-12-16
changed in Estanzo’s record
5 Sept 2026
Completion extension
no. 3
extension 3 to 2026-12-16
newly filed with RERA
5 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CENTRAL PARK APARTMENT

Is CENTRAL PARK APARTMENT RERA registered?

Yes. CENTRAL PARK APARTMENT is registered with UPRERA under registration number UPRERAPRJ112333, registered on 30 Nov 2019. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CENTRAL PARK APARTMENT?

The completion date filed with UPRERA is 15 Dec 2026. No completion certificate is on record yet.

Who is the builder of CENTRAL PARK APARTMENT?

AZAD AHMAD KHAN is the promoter entity that filed CENTRAL PARK APARTMENT with UPRERA (promoter RERA ID UPRERAPRM97013). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted CENTRAL PARK APARTMENT more time to complete?

UPRERA's record carries 3 completion extensions for CENTRAL PARK APARTMENT, the latest running to 15 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does CENTRAL PARK APARTMENT have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CENTRAL PARK APARTMENT located?

CENTRAL PARK APARTMENT is registered in Jhansi, as filed with UPRERA.

What configurations are available in CENTRAL PARK APARTMENT?

The unit plan filed with UPRERA lists OTHER, 2 BHK, 3 BHK, 1 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CENTRAL PARK APARTMENT?

The approved unit plan filed with UPRERA runs from 26 to 795 m² of carpet area (about 280 to 8,557 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CENTRAL PARK APARTMENT?

The approved unit plan describes 4 blocks and 593 units of which 592 are homes and 1 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CENTRAL PARK APARTMENT?

About 106 units per acre: 593 planned units across 5.62 acres (22,738 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗