OM SHANTI APARTMENTS

UPRERARegistered

OM SHANTI APARTMENTS is a RERA-registered residential project by OM SHANTI DEVELOPERS RASBAHAR in Jhansi (RERA ID UPRERAPRJ948156). Registered with a completion deadline of 16 Mar 2025. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ948156
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryJhansi Development Authority
Proposed start1 Oct 2019
Project duration66 months
Addressundefined, Jhansi
Tehsilundefined
Applicant typePartnership Firm
Applicant addressOM SHANTI APARTMENTS RASBAHAR COLONY SHIVPURI ROAD JHANSI
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    290200912

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Jun 2020
Original completion30 Sept 2024
Revised completion16 Mar 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹47,000
Sanctioning authorityJhansi Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors364 · 3 · 15 (units from plan)
  • 2 BHK258 71%
  • 1 BHK60 16%
  • 3 BHK46 13%
ConfigurationUnitsCarpet area
2 BHK25864
3 BHK4673-93
1 BHK6031-44
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · OTHER, 2 BHK, 3 BHK1530464-93
EWS · OTHER, 1 BHK73031
LIG · OTHER, 1 BHK73044
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ATUL KUMAR PHATAK
License CA/2008/42515
VIJAY LAXMI OPP CENTRAL SCHOOL GANDHI ROAD GWALIOR M.P.
Engineer
VINOD SHARMA
GANDHI ROAD GWALIOR
Contractor
OM SHANTI BUILDERS INDIA PVT LTD
37/1 CIVIL LINES JHANSI
Sr.Development work declared to RERA
1Demarcation of Plots
N/A
2Boundary Wall
Boundry wall at site will be made of fly ash / clay bricks with column and beam structure. The height of the boundry wall will be 6 feet. Plaster will be done on both side of the boundry wall after that two coat of paints will be coated.
3Road Work
Concrete / apex roads will be made at site. The base of the road will be filled with red moram, after that two layers of aggregate 40mm will be laid to make sure that the base of the road is upto the mark, after this the top layer will be of coloured and black and white apex. Road will be 9mtr. to 12mtr. wide.
4Footpaths
Footpaths will be made by interlocking type b concrete block pavers with a minimum path width of 1.5 mtr and thickness of 80mm.
5Water Supply Including Drinking Water Facilities
For Water Supply we have a provision of boring water as well as govt water supply from jal nigam. Water supply Provision will be provided via system of pumps and pipes. Water will get stored in underground tanks and from there water will get supplied to overhead tanks. Each block contains overhead tanks from where the water will get supllied to the units and common areas. THis water is used for drinking and daily use purposes.
6Sewer System
Sewage treatment plant will be constructed at site, all water drains and waste drain will come and connect in this Sewage treatment plant. This sewage treatment plant will filter the water and that will be reused for plantation.
7Drain
Drain will be made below the foothpaths with chambers at 10mtr distance.Drains will be made with brick work and PVC pipes of different dia. the water from flats will come through pvc pipes in this drains and a proper slope will be maintained till STP plant. The water will get collected through drains in STP plant.There will be seperate drain for each tower.
8Parks
Parks are provided in the colony. These park can be used as childrens play area, jogging, sitout space etc.
9Tree Planting
We will plant 400 trees all over the campus and in the garden as well.
10Design For Electric Supply Including Street Lighting
Iron poles with street lights will be placed all over the campus and proper electrification with transformers and wires will be done as shown in the layout. Electrification will be done in all flats also with ISI mark wires,modular switches with proper earthing arrangements.
11Community Buildings
N/A
12Treatment and Disposal System of Sewage and Sullage water
TREATMENT AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER WORK WILL BE COMPLETED WITHIN TIME MENTIONED IN PHYSICAL TARGETS
13Solid Waste Management And Disposal System
N/A
14Water Conservation System
Water conservation system will be provided on site in this we will make bore in different point in the gardens as well as in the common areas. in this we store rain water below the land and stock that water to flush out from drains at the time of rainy seasons.
15Energy Management System Including Use of Renewable Energy
N/A
16Fire Protection And Fire Safety System
as per fire fighting norms we have provided all fire fighting measures and safety features as such as fire fighting systems, smoke extraction, fire alarms , sprinklers, hosereels, fire extinguishers, heat detection systems,call points , electrical pumps generators, diesel pumps, jockey pumps, overhead tanks with required capacity, underground tanks with required capacity and other amenities as per norms.
17Social Infrastructure And Other Public Amenities Including Public Health Services
N/A
18Emergency Evacuation Services
Emergency Evacuation Services is provided. in this main stair, fire stairs, refuse area, emergency exits is provided at each floor of the building.
19Other Miscellaneous Work
3 lifts is provided in the building. Boom Barriers at main entry gate , CCTV cameras all over the campus, seperate car parking space.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 17 Sept 2023.

Sanctioned by Jhansi Development Authority · 8,356 sqm of land · an approved plan of 3 blocks and 364 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
29020091218 Sept 201817 Sept 202316 Sept 202617 Sept 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 16 Mar 2025.

#Granted fromExtended uptoNote
130 Sept 202416 Mar 2025—

Land & documents

22 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
12411587Khasra
12432300Khasra
12442300Khasra
1246125Khasra
1247100Khasra
123885Khasra
12391859Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1417-1422
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 2574
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2212
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2067
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2911
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 2280
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1417-1422
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Allotment letter from the authority · 961433
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New12 Dec 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New18 Sept 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New26 Oct 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New26 Oct 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New12 Dec 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New12 Dec 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New12 Dec 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New12 Dec 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New12 Dec 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New26 Oct 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New26 Oct 2019 ↗

Quarterly progress reports

19 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

19 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q3.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameOM SHANTI DEVELOPERS RASBAHAR
RolePromoter · current
RERA IDUPRERAPRM97412
PANAACFO3407D
CIN / TANAGRO10630E
Registered addressOM SHANTI APARTMENTS RASBAHAR COLONY SHIVPURI ROAD JHANSI
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameNEEVINTERNATIONAL ARCHITECT SURVEYORS PMC N EPC CONSULTANTS LLP
RoleCo-promoter
Applicant typePartnership Firm
Address3/246 Vipul Khand By pass road Gomti Nagar
RERA contact

Nearby projects

Jhansi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
OM SHANTI DEVELOPERS RASBAHARBankSTATE BANK OF INDIABranchNANDANPURA SIPRI BAZAR JHANSIA/C no.IFSCSBIN0004566
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)70 (Under Registration - 2 ) → 70 (Under Registration - 1 )
changed in Estanzo’s record
25 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 25 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about OM SHANTI APARTMENTS

Is OM SHANTI APARTMENTS RERA registered?

Yes. OM SHANTI APARTMENTS is registered with UPRERA under registration number UPRERAPRJ948156, registered on 11 Jun 2020. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for OM SHANTI APARTMENTS?

The completion date filed with UPRERA is 16 Mar 2025. No completion certificate is on record yet.

Who is the builder of OM SHANTI APARTMENTS?

OM SHANTI DEVELOPERS RASBAHAR is the promoter entity that filed OM SHANTI APARTMENTS with UPRERA (promoter RERA ID UPRERAPRM97412). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does OM SHANTI APARTMENTS show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted OM SHANTI APARTMENTS more time to complete?

UPRERA's record carries 1 completion extension for OM SHANTI APARTMENTS, the latest running to 16 Mar 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does OM SHANTI APARTMENTS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is OM SHANTI APARTMENTS located?

OM SHANTI APARTMENTS is registered in Jhansi, as filed with UPRERA.

What configurations are available in OM SHANTI APARTMENTS?

The unit plan filed with UPRERA lists OTHER, 2 BHK, 3 BHK and 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in OM SHANTI APARTMENTS?

The approved unit plan filed with UPRERA runs from 31 to 93 m² of carpet area (about 334 to 996 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in OM SHANTI APARTMENTS?

The approved unit plan describes 3 blocks and 364 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is OM SHANTI APARTMENTS?

About 176 units per acre: 364 planned units across 2.06 acres (8,356 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗