CIPL ENCLAVE

UPRERARegistered

CIPL ENCLAVE is a RERA-registered residential project by CENIT INFRASTRUCTURE PVT. LTD. in Varanasi (RERA ID UPRERAPRJ12790). Registered with a completion deadline of 14 Mar 2021. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ12790
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryVaranasi Development Authority
Proposed start15 Oct 2015
Original start15 Oct 2015
Project duration65 months
AddressVaranasi, Varanasi
TehsilVaranasi
Applicant typeCompany
Applicant address1st FLOOR,SARASWATI TOWER,LANKA VARANASI 221005
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    205

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Sept 2017
Original completion15 Sept 2020
Revised completion14 Mar 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹37,000
Sanctioning authorityVaranasi Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors44 · 1 · 9 (units from plan)
  • 3 BHK27 61%
  • 2 BHK17 39%
ConfigurationUnitsCarpet area
3 BHK27298
2 BHK17156
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1 · 3 BHK, 2 BHK944156-298
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
PRADEEP KUMAR GUPTA
License CA/2009/44932
B-3 DIG COLONY, PRASHANTPURI, VARANASI
Engineer
AKHILESH KUMAR SINGH
D-27,INDRA NAGAR LUCKNOW
Contractor
MANOJ KUMAR CHOUHAN
DANIYALPUR, PISAUR, SHIVPUR- 221003 VARANASI
Sr.Development work declared to RERA
1Demarcation of Plots
NO
2Boundary Wall
YES
3Road Work
YES
4Footpaths
YES
5Water Supply Including Drinking Water Facilities
YES
6Sewer System
YES
7Drain
YES
8Parks
YES
9Tree Planting
YES
10Design For Electric Supply Including Street Lighting
NO
11Community Buildings
NO
12Treatment and Disposal System of Sewage and Sullage water
NO
13Solid Waste Management And Disposal System
NO
14Water Conservation System
YES
15Energy Management System Including Use of Renewable Energy
NO
16Fire Protection And Fire Safety System
YES
17Social Infrastructure And Other Public Amenities Including Public Health Services
NO
18Emergency Evacuation Services
YES
19Other Miscellaneous Work
YES
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 15 Oct 2020.

Sanctioned by Varanasi Development Authority · 6,381 sqm of land · an approved plan of 1 block and 44 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
20515 Oct 201515 Oct 202015 Oct 202015 Sept 2020
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 14 Mar 2021.

#Granted fromExtended uptoNote
115 Sept 202014 Mar 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

20 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Arazi no 13/2Mauza-Bazardiha,ward -nagwa,pargana dehat amanat ,—
Arazi no.13/22217.10Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 2 Feb 2015.

Registry no.DateTypeArea
5802 Feb 2015self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · IN-UP00865416484742N
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 580
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 580
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 580
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 580
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 580
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 580
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 580
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old13 Sept 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old13 Sept 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old13 Sept 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old13 Sept 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old13 Sept 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAS PER PLAN
Fire safety (as filed with RERA)AS PER PLAN
Health serviceAS PER PLAN
Renewable energyAS PER PLAN
Other facilitiesAS PER PLAN

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameCENIT INFRASTRUCTURE PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM25595
PANAAFCC6012J
CIN / TANU70100UP2014PTC062812
Name of chairmanPANKAJ KUMAR SRIVASTAV
Registered address1st FLOOR,SARASWATI TOWER,LANKA VARANASI 221005
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Varanasi

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
CENIT INFRASTRUCTURE PVT LTD.BankSTATE BANK OF INDIABranchBHUA/C no.IFSCSBIN0000211
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about CIPL ENCLAVE

Is CIPL ENCLAVE RERA registered?

Yes. CIPL ENCLAVE is registered with UPRERA under registration number UPRERAPRJ12790, registered on 27 Sept 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CIPL ENCLAVE?

The completion date filed with UPRERA is 14 Mar 2021. No completion certificate is on record yet.

Who is the builder of CIPL ENCLAVE?

CENIT INFRASTRUCTURE PVT. LTD. is the promoter entity that filed CIPL ENCLAVE with UPRERA (promoter RERA ID UPRERAPRM25595). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does CIPL ENCLAVE show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted CIPL ENCLAVE more time to complete?

UPRERA's record carries 1 completion extension for CIPL ENCLAVE, the latest running to 14 Mar 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does CIPL ENCLAVE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CIPL ENCLAVE located?

CIPL ENCLAVE is registered in Varanasi, as filed with UPRERA.

What configurations are available in CIPL ENCLAVE?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CIPL ENCLAVE?

The approved unit plan filed with UPRERA runs from 156 to 298 m² of carpet area (about 1,676 to 3,203 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CIPL ENCLAVE?

The approved unit plan describes 1 block and 44 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CIPL ENCLAVE?

About 28 units per acre: 44 planned units across 1.58 acres (6,381 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗