CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI.

UPRERARegistered

CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Barabanki (RERA ID UPRERAPRJ540217). Registered with a completion deadline of 30 Jun 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ540217
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Jan 2021
Project duration54 months
AddressNawabganj, Barabanki
TehsilNawabganj
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    APD/VN-3/OBR-BBK/CIR-3/CD-2/41/HC-12/12/2018

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. valid to

    Permit revalidated

    APD/VN-3/P.LOP/ SEC-5/OBARI YOJNA/BARABANKI/EE, CD-AYO-01/SE AYO CIRCLE/74 / HC-28/03/2022

  5. Building permit sanctioned

    APD/VN-3/P.LOP/ SEC-5/OBARI YOJNA/BARABANKI/EE, CD-AYO-01/SE AYO CIRCLE/74 / HC-28/03/2022

  6. to

    Extension granted

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  9. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered16 Sept 2020
Original completion31 Dec 2023
Revised completion30 Jun 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary15 Oct 2025
Registration fee₹30,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors43 · 1 · 1 (units from plan)
ConfigurationUnitsCarpet area
VILLA4333
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1-43 · VILLA14333
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
ARVIND DEO
License CA/97/22345
UNIT-03,NEELGIRI COMPLEX ,INDIRA NAGAR, LUCKNOW
Engineer
IRSHAD AHMAD
ARCHITECT AVENUE , GOMTI NAGAR, LUCKNOW.
Contractor
NAME OF CONTRACTOR SHOULD BE FINAL AFTER TENDER PROCESS.
ADDRESS OF CONTRACTOR SHOULD BE FINAL AFTER TENDER PROCESS.
Sr.Development work declared to RERA
1Demarcation of Plots
As per Approved Layout Plan. The Plot shall be demarcated by means of Dagbelling.
2Boundary Wall
Parishad shall not provide any Boundary wall.
3Road Work
Yet to be started as per Layout plan.Internal Road & Footpath work will be done by UPAVP as per Parishad specification. Providing and Laying one coat of WBM (45-90) in depth of 0.09 M and second coat of WBM (45-63) in depth of 0.075 M. Third coat of WMM in depth of 0.075 m . After all three layers two layers of Bituminous concrete laid as per MORTH guidelines with total thickness of 6.50 cm.
4Footpaths
Not Applicable. As per Specifications of UP Awas Evam Vikas Parishad and inline with approved map. (Chief Engineer Office order No 685/M-4/2017 dt 19.03.2017 and others ). Work shall be carried out as per Uttar Pradesh Public work departments shedule of rates (Specifications ) .
5Water Supply Including Drinking Water Facilities
Yet to be started as per Layout plan.water supply work will be done by UPAVP as per Parishad specifications. Supply and laying of 90 mm dia PVC pipe (ISI mark) as per layout plan. Making water connection joints as per layout plan including all fittings.
6Sewer System
Yet to be started as per Layout plan.Sewarage work will be done by UPAVP as per parishad specifications. S.W.R 110 dia pipe will be provided as per specifications.Manhole and regulating shaft proving in Brick masonary.and also providing RCC manhole cover as per layout plan.
7Drain
Yet to be started as per Layout plan.Storm water work will be done by UPAVP as per Parishad specifications.Open channeled drain of Class 150 brick work in 1:6 including base of Plain cement concrete of 1:6:12.The size of drain will be 9"X9" . Depth of drain shall be vary as per site slope and other conditions.
8Parks
Not Applicable
9Tree Planting
By side of the Roads and in Parks As per Approved Layout.
10Design For Electric Supply Including Street Lighting
Shall be done in house (by UPAVP) and shall be handed over to UPPCL for issuing individual connections .
11Community Buildings
No any provision for Community Buildings.But many community buildings are also avilable in Parishad scheme.
12Treatment and Disposal System of Sewage and Sullage water
No any provision for Treatment and disposal of sewage and sullage water by UPAVP. But after completion the project Nagar Palika Parishad Barabanki shall be provided facility of Treatment and disposal of sewage and sullage water because Yojna is handed to Nagar Palika Parishad Barabanki.
13Solid Waste Management And Disposal System
No any provision for Solid Waste management & Disposal by UPAVP. But after completion the project Nagar Palika Parishad Barabanki shall be provided facility of Solid Waste management & Disposal because Yojna is handed to Nagar Palika Parishad Barabanki.
14Water Conservation System
No any provision for Water conservation .
15Energy Management System Including Use of Renewable Energy
No any provision for Energy management System Including Use of Renewable Energy.
16Fire Protection And Fire Safety System
No any provision for Fire protection and fire safety requirements
17Social Infrastructure And Other Public Amenities Including Public Health Services
No any provision for Social Infrastructure And Other Public Amenities Including Public Health Services.But in Parishad scheme many social infrastructures are available.
18Emergency Evacuation Services
No any provision.
19Other Miscellaneous Work
No any provision.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 12 Dec 2023. 1 of them carries a revalidation, valid to 27 Mar 2027.

Sanctioned by U.P. Awas Evam Vikas Parishad · 4,980 sqm of land · an approved plan of 1 block and 43 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
APD/VN-3/OBR-BBK/CIR-3/CD-2/41/HC-12/12/201812 Dec 201812 Dec 202312 Dec 202531 Dec 2023—
APD/VN-3/P.LOP/ SEC-5/OBARI YOJNA/BARABANKI/EE, CD-AYO-01/SE AYO CIRCLE/74 / HC-28/03/202228 Mar 202212 Dec 202327 Mar 202731 Dec 202328 Mar 2022
valid to 27 Mar 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2025.

#Granted fromExtended uptoNote
131 Dec 202330 Jun 2025—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
382/1,383,3744980Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1427-1432
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New13 Aug 2020 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New13 Aug 2020 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New13 Aug 2020 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New13 Aug 2020 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New13 Aug 2020 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New13 Aug 2020 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New13 Aug 2020 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Sept 2020 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New13 Aug 2020 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Sept 2020 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New13 Aug 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New13 Aug 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New13 Aug 2020 ↗

Quarterly progress reports

18 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

18 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2025-Q1.

QuarterConstructionCertificates
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Barabanki

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
UP AWAS EVAM VIKAS PARISHAD BARABANKIBankINDUSIND BANKBranchINDUSIND BANK BARABANKIA/C no.IFSCINDB0000435
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

14 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI.

Is CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. RERA registered?

Yes. CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. is registered with UPRERA under registration number UPRERAPRJ540217, registered on 16 Sept 2020. Estanzo reproduces that filing; it does not verify the work behind it.

Has CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. been completed?

UPRERA still lists CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. as Registered, so it is not shown as completed here. A completion certificate dated 15 Oct 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI.?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. more time to complete?

UPRERA's record carries 1 completion extension for CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI., the latest running to 30 Jun 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. located?

CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI. is registered in Barabanki, as filed with UPRERA.

What configurations are available in CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI.?

The unit plan filed with UPRERA lists VILLA. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI.?

The approved unit plan describes 1 block and 43 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CONSTRUCTION OF 43 NOS L.I.G. HOUSES AT SECTOR-05 OBRI YOJNA, BARABANKI.?

About 35 units per acre: 43 planned units across 1.23 acres (4,980 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗