Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow

UPRERARegistered

Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Lucknow (RERA ID UPRERAPRJ608263). Registered with a completion deadline of 15 Sept 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
0%Q3'25
0%Q4'25
0%Q1'26
0%Q2'26
—Q3'26

Construction stayed at 0% across 4 consecutive filed quarters (Jul–Sep 2025 to Apr–Jun 2026). The promoter filed the same figure each time. Quarters with no percentage filed are not counted either way.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ608263
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start16 Jan 2024
Project duration56 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2327/File no-40

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered20 Oct 2023
Original completion15 Sept 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,86,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors576 · 18 · 4 (units from plan)
ConfigurationUnitsCarpet area
2 BHK57640
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
B46 · 2 BHK43240
B47 · 2 BHK43240
B48 · 2 BHK43240
B49 · 2 BHK43240
B50 · 2 BHK43240
B51 · 2 BHK43240
B52 · 2 BHK43240
B53 · 2 BHK43240
B54 · 2 BHK43240
B55 · 2 BHK43240
B56 · 2 BHK43240
B57 · 2 BHK43240
B58 · 2 BHK43240
B59 · 2 BHK43240
B60 · 2 BHK43240
B61 · 2 BHK43240
B62 · 2 BHK43240
B63 · 2 BHK43240
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Vikas Kumar
License CA/2002/29240
Architect and Planning unit-06, Neelgiri complex, UPAVP, Indira nagar, Lucknow
Engineer
UPAVP
CD LKO-05, UPAVP, OFFICE COMPLEX, VRINDAVAN YOJNA LUCKNOW
Contractor
CD Lko-Five UPAVP Lucknow
UPAVP, Office Complex Vrindavn Yojna, Lucknow
Sr.Development work declared to RERA
1Demarcation of Plots
Done
2Boundary Wall
N/A
3Road Work
Bituminous type Road of 6m, 7.5m and 12m wide will be provided. As per design.
4Footpaths
N/A
5Water Supply Including Drinking Water Facilities
water supply will be provided by different type and dia of pipes as per design in which PVC pipe of 200mm, 150mm, 125mm, 100mm dia and 300mm dia pipe of ductile Iron (DI) will be provided. The source of water is OHT that is already present in Sec-13, Vrindavan Yojna Lucknow
6Sewer System
For seweage system, NP3 type RCC pipe of 250mm, 300mm 450mm dia will be provided as per desing. Treatment of sewage will be done in STP of 37.50MLD capacity that is already present in Sector-10B, Vrindavan Yojna Lucknow and effluent generated from STP after treatment will be finally disposed into Gomti River.
7Drain
U-type drain (CK, C1, C2) in which flat brick work with struct pointing and for bidding PCC of design thickness will be provided as per design.
8Parks
There is porvision of park as per approved layout. The park will be provided with approved designed boundary in which tree/plant shall be planted.
9Tree Planting
Diffrent type of plant will be planted at proper spacing in proposed area of construction of LIG houses after construction of road /Building.
10Design For Electric Supply Including Street Lighting
Electricity supply will be provided from transformers installed by UPPCL that is already present in Sector-13, Vrindavan yojna Lucknow. RCC pole will be used for connecting electric supply wire from transformer to LIG houses. For the purpose of street lighting appropriate electric bulbs will be installed on RCC poles at proper spacing.
11Community Buildings
it is proposed in sector-13 and is also built in other sectors of Vrindavan Yojna Lucknow
12Treatment and Disposal System of Sewage and Sullage water
Treatment of sewage and sullage water will be done by STP (capacity 37.50MLD) and technology based on Sequence batch reactor (SBR) that is already present in Sector-10B Vrindavan Yojna Lucknow. Final effluent from STP after treatment will be disposed into gomti river.
13Solid Waste Management And Disposal System
Nagar Nigam/Parishad dumper/vehicles will collect the solid waste and transport to the disposal centre for further process.
14Water Conservation System
N/A
15Energy Management System Including Use of Renewable Energy
N/A
16Fire Protection And Fire Safety System
N/A
17Social Infrastructure And Other Public Amenities Including Public Health Services
Provision for nursing home/ helth center has been consedered out as per Building bye-laws issued by Govt.
18Emergency Evacuation Services
N/A
19Other Miscellaneous Work
N/A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 26 Sept 2028.

Sanctioned by U.P. Awas Evam Vikas Parishad · 36,198 sqm of land · an approved plan of 18 blocks and 576 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2327/File no-4027 Sept 202326 Sept 202825 Sept 203115 Sept 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1232870Khasra
12331010Khasra
12341060Khasra
1235151800Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1422-1427
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New5 Oct 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Oct 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Oct 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Oct 2023 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New5 Oct 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New16 Oct 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New16 Oct 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New5 Oct 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Oct 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Oct 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New5 Oct 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Oct 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Oct 2023 ↗

Quarterly progress reports

11 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

11 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q2.

QuarterConstructionCertificates
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q20%CA ↗ · Arch ↗ · Eng ↗
2025-Q30%CA ↗ · Arch ↗ · Eng ↗
2025-Q40%CA ↗ · Arch ↗ · Eng ↗
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Upavp Vrindavan yojna No-04 LKO Sector-13, 576 LIG houses G+3 Collection A/CBankICICI BANKBranchVibhuti Khand, Gomti Nagar LucknowBranch addressRegional Office, Lucknow TC-13, Vibhuti Khand Gomti Nagar -226010Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC00004698
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Upavp Vrindavan Yojna No-04 Lko Sector 13, 576 LIG Houses G+3 Separate A/CBankICICI BANKBranchVibhuti Khand, Gomti Nagar lucknowBranch addressRegional Office, Lucknow TC-13 Vibhuti Khand Gomti Nagar-226010Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0004698
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Upavp Vrindavan Yojna No-04 Lko Sector 13, 576 LIG houses G+3 Transaction A/cBankICICI BANKBranchVibhuti Khand Gomti Nagar LucknowBranch addressRegional Office Lucknow TC-13 Vibhuti Khand Gomti Nagar-226010Branch districtLucknow, Uttar PradeshA/C no.IFSCICIC0004698
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

15 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)750 (Under Registration - 3 ) → 751 (Under Registration - 4 )
changed in Estanzo’s record
17 Sept 2026
Promoter’s complaints tally (all their projects)748 (Under Registration - 1 ) → 750 (Under Registration - 3 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)747 (Under Registration - 0 ) → 748 (Under Registration - 1 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)746 (Under Registration - 2 ) → 747 (Under Registration - 0 )
changed in Estanzo’s record
23 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow

Is Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow RERA registered?

Yes. Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow is registered with UPRERA under registration number UPRERAPRJ608263, registered on 20 Oct 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow?

The completion date filed with UPRERA is 15 Sept 2028. No completion certificate is on record yet.

Who is the builder of Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow located?

Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow is registered in Lucknow, as filed with UPRERA.

What configurations are available in Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow?

The unit plan filed with UPRERA lists 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

How many towers and units are planned in Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow?

The approved unit plan describes 18 blocks and 576 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Construction of 576 Nos (G+3) LIG Flats at Sector-13, Vrindavan Yojna no-4, Lucknow?

About 64 units per acre: 576 planned units across 8.94 acres (36,198 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗