PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Meerut (RERA ID UPRERAPRJ930149). Registered with a completion deadline of 1 Sept 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ930149 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 2 Sept 2020 |
| Project duration | 60 months |
| Address | Meerut, Meerut |
| Tehsil | Meerut |
| Applicant type | Competent authority |
| Applicant address | 104 Mahatma Gandhi Marg, Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
464
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
344
Building permit sanctioned
344
- to
Extension granted
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 15 Jul 2020 |
| Original completion | 1 Sept 2023 |
| Revised completion | 1 Sept 2025 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 29 Nov 2025 |
| Registration fee | ₹9,730 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 96 | 23 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| 1 · 1 BHK | 7 | 48 | 23 |
| 2 · 1 BHK | 7 | 48 | 23 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Asper approved Layout Plan |
| 2 | Boundary Wall Not Provided |
| 3 | Road Work Granular Sub Base with graded Stone Ballast 12.50cm thick, Wet Mix Macadam 10.00cm thick G S B 4.00cm thick BM and 2.5cm thick Bituminous Concrete |
| 4 | Footpaths Not Provided |
| 5 | Water Supply Including Drinking Water Facilities Water Supply distribution System through Sectorial O.H.T. PVC Pipes 110mm outer dia, 6Kg per sqcm as per design |
| 6 | Sewer System 250mm dia NP-2 RCC Hume Pipe laid with manhole and sewer connecting chamber which shall be connected with trunk sewer line already laid along 45m road as shown in Layout Plan |
| 7 | Drain Drain section 20cm x 18cm provided by brick work in proportional 1 times cement and 6 times coarse sand mortar with struck and flush pointing |
| 8 | Parks Not Provided |
| 9 | Tree Planting Not Provided |
| 10 | Design For Electric Supply Including Street Lighting 11 KV HT line Steel Tubular Pole SP 55, 11m long, LT Lines PCC Pole 8.5m long, Street Lighting on 7.5m/9m height Octagonal Pole Street Light connected with 33/11 KV Sub Station already running at Sector-3, Jagriti Vihar (Ext.), Meerut |
| 11 | Community Buildings Not Provided |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewer line shall be connected in Sewerage treatment plan already running along 45m wide road as shown in Layout Plan |
| 13 | Solid Waste Management And Disposal System Not Provided |
| 14 | Water Conservation System Not Provided |
| 15 | Energy Management System Including Use of Renewable Energy Not Provided |
| 16 | Fire Protection And Fire Safety System Fire Extinguisher ISI marked 4Kg and 6Kg capacity, CO2 Type fire extinguisher ISI marked 2Kg and 4Kg capacity with fire hose cabinet box of 18 gauge shall be provided |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Not Provided |
| 18 | Emergency Evacuation Services Not Provided |
| 19 | Other Miscellaneous Work Not Provided |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 12 Feb 2029. 1 of them carries a revalidation.
Sanctioned by U.P. Awas Evam Vikas Parishad · 973 sqm of land · an approved plan of 2 blocks and 96 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 464 | 11 Oct 2018 | 10 Oct 2023 | 10 Oct 2025 | 1 Sept 2023 | — | |
| 344 | 13 Feb 2024 | 12 Feb 2029 | 1 Sept 2025 | 1 Sept 2023 | 13 Feb 2024 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 2 completion extensions for this project, the latest running to 1 Sept 2025.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 1 Sept 2023 | 1 Jun 2025 | — |
| 2 | 1 Jun 2025 | 1 Sept 2025 | — |
Land & documents
27 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 143, 144, 146 | 12390 | Khasra |
| Allotment letter from the authority · 1398 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 23 Jun 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 23 Jun 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 23 Jun 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 23 Jun 2020 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 23 Jun 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 3 Jul 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 3 Jul 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 3 Jul 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 23 Jun 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 8 Jul 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 3 Jul 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 23 Jun 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 23 Jun 2020 ↗ |
Quarterly progress reports
21 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
21 quarterly progress reports are on file with UPRERA, covering 2020-Q2 to 2025-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | — | Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | U.P. Awas Evam Vikas Parishad |
| Role | Promoter · current |
| RERA ID | UPRERAPRM4243 |
| PAN | AAAJU0103A |
| CIN / TAN | LKNU05017F |
| Registered address | 104 Mahatma Gandhi Marg, Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Meerut
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Executive EngineerBankHDFC BankBranchGarh Road MeerutA/C no.IFSCHDFC0001911 |
What has changed on this record
14 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 761 (Under Registration - 10 ) → 762 (Under Registration - 11 ) changed in Estanzo’s record | 19 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 760 (Under Registration - 9 ) → 761 (Under Registration - 10 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 759 (Under Registration - 8 ) → 760 (Under Registration - 9 ) changed in Estanzo’s record | 15 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 758 (Under Registration - 7 ) → 759 (Under Registration - 8 ) changed in Estanzo’s record | 13 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 757 (Under Registration - 6 ) → 758 (Under Registration - 7 ) changed in Estanzo’s record | 9 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 755 (Under Registration - 4 ) → 757 (Under Registration - 6 ) changed in Estanzo’s record | 7 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 2 ) → 755 (Under Registration - 4 ) changed in Estanzo’s record | 5 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 753 (Under Registration - 6 ) → 753 (Under Registration - 2 ) changed in Estanzo’s record | 1 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 752 (Under Registration - 5 ) → 753 (Under Registration - 6 ) changed in Estanzo’s record | 29 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 751 (Under Registration - 4 ) → 752 (Under Registration - 5 ) changed in Estanzo’s record | 25 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 750 (Under Registration - 3 ) → 751 (Under Registration - 4 ) changed in Estanzo’s record | 17 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 748 (Under Registration - 1 ) → 750 (Under Registration - 3 ) changed in Estanzo’s record | 3 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 747 (Under Registration - 0 ) → 748 (Under Registration - 1 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 746 (Under Registration - 2 ) → 747 (Under Registration - 0 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut
Is PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut RERA registered?
Yes. PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut is registered with UPRERA under registration number UPRERAPRJ930149, registered on 15 Jul 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut been completed?
UPRERA still lists PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut as Registered, so it is not shown as completed here. A completion certificate dated 29 Nov 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut?
U.P. Awas Evam Vikas Parishad is the promoter entity that filed PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut more time to complete?
UPRERA's record carries 2 completion extensions for PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut, the latest running to 1 Sept 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut located?
PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut is registered in Meerut, as filed with UPRERA.
What configurations are available in PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut?
The unit plan filed with UPRERA lists 1 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut?
The approved unit plan describes 2 blocks and 96 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is PMAY Flats 96 Nos in Sector-8A at Scheme No-11, Jagriti Vihar (Ext.), Meerut?
About 399 units per acre: 96 planned units across 0.24 acres (973 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗