CYBERTHUM PHASE E (BLOCK A)

UPRERARegistered

CYBERTHUM PHASE E (BLOCK A) is a RERA-registered commercial project by MAX-DIGI INFOTECH PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ190938). Registered with a completion deadline of 25 Feb 2025.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ190938
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Jan 2019
Project duration74 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address2 nd Floor Plot No. 3-4, A Block Market, Savitri Bhawan, Preet Vihar, Delhi-110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    NOIDA/MVN/2018/BP-12619/390

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered5 Feb 2019
Original completion1 Dec 2022
Revised completion25 Feb 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary26 Dec 2025
Registration fee₹58,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors423 · 2 · 2 (units from plan)
ConfigurationUnitsCarpet area
OTHER42311-60
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK A · OTHER233411-60
BLOCK A (LOWER GF) · OTHER18911-40
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 173.14 m² for a OTHER, 219.02 m² for a OTHER, 173.14 m² for a OTHER and 1 other unit like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MR. KULMEET SHANGARI ACPL Design Limited
License CA/97/21741
E24, Block E, South Extension I, New Delhi, Delhi 110049
Engineer
DR VINOD JAIN
C-35 Pampash Enclave, Greater Kailash-1 Delhi-110048
Contractor
AHUJA AND ANAND
PLOT NO. 3 AND 4, 2ND FLOOR, SAVITRI BHAWAN,A BLOCK MARKET, PREET VIHAR, NEW DELHI - 110092
Sr.Development work declared to RERA
1Demarcation of Plots
AS PER APPROVED BUILDING PLAN
2Boundary Wall
AS PER APPROVED BUILDING PLAN
3Road Work
AS PER APPROVED BUILDING PLAN
4Footpaths
AS PER APPROVED BUILDING PLAN
5Water Supply Including Drinking Water Facilities
NOIDA AUTHORITY SHALL PROVIDE WATER SUPPLY TO THE ENTIRE FACILITY
6Sewer System
CENTRALIZED STP TO TREAT THE SEWERAGE
7Drain
CENTRALIZED STP TO TREAT THE SEWERAGE
8Parks
AS PER APPROVED BUILDING PLAN
9Tree Planting
AS PER APPROVED BUILDING PLAN
10Design For Electric Supply Including Street Lighting
SINGLE FEEDER SHALL BE TAKEN FROM NOIDA ELECTRICITY BOARD AND CONNECTED TO CENTRAL SUB
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
CENTRAL STP FOR ENTIRE PROJECT
13Solid Waste Management And Disposal System
PROJECT SHALL HAVE WASTE SEGREGATION AREA AND OWC FOR TREATMENT
14Water Conservation System
ADEQUATE NUMBER OF RECHARGE PITS MADE
15Energy Management System Including Use of Renewable Energy
LED LIGHTS AND TIMER CONTROL PANELS SHALL BE USED FOR EFFICIENT ENERGY MANAGEMENT
16Fire Protection And Fire Safety System
FIRE ALARM SYSTEM PROVIDED
17Social Infrastructure And Other Public Amenities Including Public Health Services
NOT APPLICABLE
18Emergency Evacuation Services
AS PER APPROVED BUILDING PLAN
19Other Miscellaneous Work
AS PER APPROVED BUILDING PLAN
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

3 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
3SMC Real Estate Advisors Private LimitedUPRERAAGT10113
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 25 Dec 2023. 1 of them carries a revalidation, valid to 24 Dec 2028.

Sanctioned by Noida Authority · 4,740 sqm of land · an approved plan of 2 blocks and 423 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
NOIDA/MVN/2018/BP-12619/39026 Dec 201825 Dec 202325 Dec 20261 Dec 2022—
NOIDA/MVN/2018/BP-12619/39026 Dec 201825 Dec 202324 Dec 203125 Dec 202326 Dec 2018
valid to 24 Dec 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 25 Feb 2025.

#Granted fromExtended uptoNote
11 Dec 202230 May 2023Six months extension in view of force majeure caused by covid-19 pandemic
230 May 202325 Dec 2023—
325 Dec 202325 Feb 2025—

Land & documents

26 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2 SECTOR 140A NOIDA108800Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · Noida/Ind./07/2007/1702
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Jan 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New4 Jan 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New4 Jan 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New31 Jan 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jan 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Jan 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jan 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New31 Jan 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New2 Feb 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jan 2019 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Jan 2019 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New30 Jan 2019 ↗

Quarterly progress reports

20 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

20 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q471.48%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2024-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMAX-DIGI INFOTECH PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM70627
PANAAFCM1580M
CIN / TANU72300DL2007PTC165933
Name of chairmanPrem Bhutani
Registered address2 nd Floor Plot No. 3-4, A Block Market, Savitri Bhawan, Preet Vihar, Delhi-110092
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Max Digi Infotech Collection Account Account For Cyberthum Phase E (Blick A)BankIndusind BankBranchBarakhamba RoadBranch addressGopaldas Bhawan,28 Barakhamba Road New DelhiBranch districtNorth East Delhi, DelhiA/C no.IFSCINDB0000005Branch emailapoorv.mittal at the rate indusind.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
MAX- DIGI INFOTECH PRIVATE LIMITED CYBERTHUM Phase E BLOCK A Collection Escrow A/CBankIndusind BankBranchBarakhamba BranchBranch addressGopal Das Bhawan,28Barakhamba, New DelhiBranch districtNew Delhi, DelhiA/C no.IFSCINDB0000005
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Max Digi Infotech Pvt. Ltd. Trasaction Account For Cyberthum Phase E (BlockA)BankIndusind BankBranchBarakhamba RoadBranch addressGopaldas Bhawan, 28 Barakhamba Road New DelhiBranch districtNorth East Delhi, DelhiA/C no.IFSCINDB0000005Branch emailapoorav.mittal at the rate indusind.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)197 (Under Registration - 18 ) → 199 (Under Registration - 20 )
changed in Estanzo’s record
21 Oct 2026
Promoter’s complaints tally (all their projects)196 (Under Registration - 18 ) → 197 (Under Registration - 18 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)195 (Under Registration - 17 ) → 196 (Under Registration - 18 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)194 (Under Registration - 16 ) → 195 (Under Registration - 17 )
changed in Estanzo’s record
11 Oct 2026
Promoter’s complaints tally (all their projects)191 (Under Registration - 13 ) → 194 (Under Registration - 16 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)189 (Under Registration - 12 ) → 191 (Under Registration - 13 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)188 (Under Registration - 11 ) → 189 (Under Registration - 12 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)188 (Under Registration - 12 ) → 188 (Under Registration - 11 )
changed in Estanzo’s record
3 Oct 2026
Promoter’s complaints tally (all their projects)186 (Under Registration - 10 ) → 188 (Under Registration - 12 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)186 (Under Registration - 12 ) → 186 (Under Registration - 10 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)185 (Under Registration - 11 ) → 186 (Under Registration - 12 )
changed in Estanzo’s record
27 Sept 2026
Promoter’s complaints tally (all their projects)185 (Under Registration - 14 ) → 185 (Under Registration - 11 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)185 (Under Registration - 22 ) → 185 (Under Registration - 14 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)184 (Under Registration - 21 ) → 185 (Under Registration - 22 )
changed in Estanzo’s record
15 Sept 2026
Promoter’s complaints tally (all their projects)183 (Under Registration - 28 ) → 184 (Under Registration - 21 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)179 (Under Registration - 24 ) → 183 (Under Registration - 28 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)177 (Under Registration - 22 ) → 179 (Under Registration - 24 )
changed in Estanzo’s record
7 Sept 2026
Promoter’s complaints tally (all their projects)175 (Under Registration - 21 ) → 177 (Under Registration - 22 )
changed in Estanzo’s record
5 Sept 2026
Promoter’s complaints tally (all their projects)173 (Under Registration - 19 ) → 175 (Under Registration - 21 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)172 (Under Registration - 21 ) → 173 (Under Registration - 19 )
changed in Estanzo’s record
1 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 21 Oct 2026 · 24 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CYBERTHUM PHASE E (BLOCK A)

Is CYBERTHUM PHASE E (BLOCK A) RERA registered?

Yes. CYBERTHUM PHASE E (BLOCK A) is registered with UPRERA under registration number UPRERAPRJ190938, registered on 5 Feb 2019. Estanzo reproduces that filing; it does not verify the work behind it.

Has CYBERTHUM PHASE E (BLOCK A) been completed?

UPRERA still lists CYBERTHUM PHASE E (BLOCK A) as Registered, so it is not shown as completed here. A completion certificate dated 26 Dec 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of CYBERTHUM PHASE E (BLOCK A)?

MAX-DIGI INFOTECH PRIVATE LIMITED is the promoter entity that filed CYBERTHUM PHASE E (BLOCK A) with UPRERA (promoter RERA ID UPRERAPRM70627). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted CYBERTHUM PHASE E (BLOCK A) more time to complete?

UPRERA's record carries 3 completion extensions for CYBERTHUM PHASE E (BLOCK A), the latest running to 25 Feb 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does CYBERTHUM PHASE E (BLOCK A) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CYBERTHUM PHASE E (BLOCK A) located?

CYBERTHUM PHASE E (BLOCK A) is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in CYBERTHUM PHASE E (BLOCK A)?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CYBERTHUM PHASE E (BLOCK A)?

The approved unit plan filed with UPRERA runs from 11 to 60 m² of carpet area (about 123 to 643 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CYBERTHUM PHASE E (BLOCK A)?

The approved unit plan describes 2 blocks and 423 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CYBERTHUM PHASE E (BLOCK A)?

About 361 units per acre: 423 planned units across 1.17 acres (4,740 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗