CYBERTHUM PHASE II

UPRERARegistered

CYBERTHUM PHASE II is a RERA-registered commercial project by MAX-DIGI INFOTECH PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ452606). Registered with a completion deadline of 25 Sept 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ452606
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Sept 2021
Project duration37 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address2 nd Floor Plot No. 3-4, A Block Market, Savitri Bhawan, Preet Vihar, Delhi-110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    NOIDA/MVN/2018/BP/12619/390

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered23 Sept 2021
Original completion25 Sept 2024
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹5,54,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors24 · 4 · 13 (units from plan)
ConfigurationUnitsCarpet area
OTHER24101-6,960
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
PHASE C ( IT-3) · OTHER138470-1,061
PHASE D ( IT-4) · OTHER138470-1,061
PHASE F (Block-B) · OTHER74101-6,960
PHASE G (Block C) · OTHER742,188-3,815
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
KULMEET SHANGARI ACPL Design Limited
License CA/97/21741
E-24 Block E, South Extention New Delhi
Engineer
Dr. Vinod Jain
C-35 POmposh Enclave Greater Kalish Part-1 New Delhi-110048
Contractor
PARMESH CONSTRUCTION COMPANY LIMITED
Q-247 Sector 21, Noida
Sr.Development work declared to RERA
1Demarcation of Plots
The Project landwill be demarcated by its boundary wall to the exact shape, size and orientation as per sanction map by Noida Development Authority.
2Boundary Wall
A 2.4M High boundary wall of brick and plaster will be constrution with deep foundation to be earthquake resistant. The wall will then be plastered and painted as per asthetics.
3Road Work
A pavement quality concrete will be laid in thickness of + 200 mm on top of compacted Dry lean concrete/ coarse grained sub-base.
4Footpaths
An M-15 grade of paver block/ inter locking tiles will be laid in the project for walking areas. Tiles will be 3 to 4 inch thick and the colour patters will be lasting and visible at all hours.
5Water Supply Including Drinking Water Facilities
A portable ground water supply through and pumping arrangement will be delivered to the water tank of 25000l capacity of terrace.
6Sewer System
The sewage will be collected through a soil pipe arrangement, U-bends and inspection chambers leading to the septic tank of the project, from where the sewage will be disposed to the STP system.
7Drain
A surface drain with specs of 150mm CC sub-base over compacted earth topped with 20mm of cement mortar to the size of 150 x 75 laid in slope of 1 to 300 leading to GT.
8Parks
Two lush green parks will be maintained in the project per apporved plan by Noida development authority. The parks will have foothpaths, sitting area and small play area for kids.
9Tree Planting
The trees will be planted at all suitable loactions of the project and along the boundary wall. The tree section will be done to enusre no hindrance in the services for future
10Design For Electric Supply Including Street Lighting
Electrical layout and capacity will be installed to suffice the domestic use of the project. The load sanctions will be taken from the Vidyut Vibhag.
11Community Buildings
NOT APPLICABLE
12Treatment and Disposal System of Sewage and Sullage water
CENTRALISED STP TO TREAT THE SEWEAGE
13Solid Waste Management And Disposal System
PROJECT SHALL HAVE WASTE SEGREGATION AREA AND OWC FRO TREATMENT
14Water Conservation System
Rain Water harvesting System, Duel Flush System.
15Energy Management System Including Use of Renewable Energy
LED LIGHT AND TIMER CONTROL RANELS SHALL BE USED FOR EFFICIENT ENERGY MANAGEMENT
16Fire Protection And Fire Safety System
FIRE ALARM SYSTEM PROVIDED
17Social Infrastructure And Other Public Amenities Including Public Health Services
NOT APPLICABLE
18Emergency Evacuation Services
AS PER APPROVED BUILDING PLAN
19Other Miscellaneous Work
AS PER APPROVED BUILDING PLAN
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

41 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
3Earth Homes Pvt. LtdUPRERAAGT11244
4Expert InvestorsUPRERAAGT17411
5FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
6GATEWAY PROPMART PVT LTDUPRERAAGT10384
7Global RealtyUPRERAAGT16138
8HAPPY HOMES REALTORS AND BUILDERSUPRERAAGT15217
9IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
10Innovance Realty Private LimitedUPRERAAGT13354
11INVESTOR HOMEZUPRERAAGT15046
12INVESTOXPERT ADVISORS PVT LTDUPRERAAGT21108
13Jones Lang LaSalle Property Consultants (India) Pvt LtdUPRERAAGT10791
14KNIGHT FRANK INDIA PVT LTDUPRERAAGT12268
15M/s Northbrick Consultancy Pvt Ltd.(formerly Known as Northbrick ventures Pvt Ltd)UPRERAAGT16860
16MADHYAM ESTATE LINKERS PVT LTDUPRERAAGT10509
17MBS CONSULTINGUPRERAAGT20831
18NEOBRIX CONSULTING PVT LTDUPRERAAGT10059
19ORANGE DOOR INFRA PRIVATE LIMITEDUPRERAAGT15693
20PRIME ESTATESUPRERAAGT11881
21PRITHVEE PROPREALITY LLPUPRERAAGT21330
22PROPERTY JUNCTION PRIVATE LIMITEDUPRERAAGT12902
23PROPSHOPUPRERAAGT10129
24PROPTIGER MARKETING SERVICES PRIVATE LIMITED(Formerly ELARA MARKETING SERVICES PRIVATE LIMITED)UPRERAAGT10032
25RAJ NANDINI ESTATES PRIVATE LIMITEDUPRERAAGT10793
26RAV GLOBAL SOLUTIONS PRIVATE LIMITEDUPRERAAGT20402
27RAVS INFRATECH PRIVATE LIMITEDUPRERAAGT20392
28REAL HOMEZUPRERAAGT11572
29REALTY ASSISTANT PRIVATE LIMITED (Formerly REALTY ASSISTANTS HUB PVT LTD)UPRERAAGT18286
30REALTY WORLD INFRATECH PVT. LTD.UPRERAAGT10531
31REDMAPLE BUILDIKO PRIVATE LIMITEDUPRERAAGT14395
32RELIVE SOLUTIONS PVT. LTD.UPRERAAGT10078
33SeedWill Consulting Private LimitedUPRERAAGT15794
34SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
35Supertrust Homes Pvt LtdUPRERAAGT16429
36The Akurath FinmartUPRERAAGT18924
37TRUHOMES REALTYUPRERAAGT10997
38TRUSTCON SPACESUPRERAAGT10305
39TRUSTNEST PROPERTY CONSULTANTS LLPUPRERAAGT15462
40UMANG ESTATES C/O VIRENDER SINGHUPRERAAGT11784
41WHITE KNIGHTS REALTY PRIVATE LIMITEDUPRERAAGT20816
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 25 Sept 2024.

Sanctioned by Noida Authority · 54,398 sqm of land · an approved plan of 4 blocks and 24 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
NOIDA/MVN/2018/BP/12619/39026 Dec 201825 Sept 202425 Dec 202625 Sept 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
PLOT NO. 2, SECTOR 140 A NOIDA108800Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 1157
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Titel Search Report
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Floor Plan
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New21 Aug 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New14 Sept 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New14 Sept 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New14 Sept 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Aug 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Aug 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Aug 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New21 Aug 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Aug 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New21 Aug 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Aug 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Aug 2021 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2024-Q2.

QuarterConstructionCertificates
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMAX-DIGI INFOTECH PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM70627
PANAAFCM1580M
CIN / TANU72300DL2007PTC165933
Name of chairmanPrem Bhutani
Registered address2 nd Floor Plot No. 3-4, A Block Market, Savitri Bhawan, Preet Vihar, Delhi-110092
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Max Digi Infotech Pvt.Ltd.BankICICI BANKBranchSECTOR 137 NOIDABranch addressVIVANTE,104,PLOT NO. GH-07A, SECTOR 137, NOIDABranch districtGautam Buddha NagarA/C no.IFSCICIC0003451
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
MAX DIGI INFOTECH PVT.LTD.BankICICI BANKBranchSECTOR 137 NOIDABranch addressVIVANTE,104,PLOT NO.GH-07A,SECTOR-137 NOIDABranch districtGhaziabadA/C no.IFSCICIC0003451
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
MAX DIGI INFOTECH PVT.LTD.BankICICI BANKBranchSECTOR 137, NOIDABranch addressVIVANTE,104,PLOT NO. GH-07A, SECTOR 137, NOIDABranch districtGautam Buddha NagarA/C no.IFSCICIC0003451
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)197 (Under Registration - 18 ) → 199 (Under Registration - 20 )
changed in Estanzo’s record
21 Oct 2026
Promoter’s complaints tally (all their projects)196 (Under Registration - 18 ) → 197 (Under Registration - 18 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)195 (Under Registration - 17 ) → 196 (Under Registration - 18 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)194 (Under Registration - 16 ) → 195 (Under Registration - 17 )
changed in Estanzo’s record
11 Oct 2026
Promoter’s complaints tally (all their projects)191 (Under Registration - 13 ) → 194 (Under Registration - 16 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)189 (Under Registration - 12 ) → 191 (Under Registration - 13 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)188 (Under Registration - 11 ) → 189 (Under Registration - 12 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)188 (Under Registration - 12 ) → 188 (Under Registration - 11 )
changed in Estanzo’s record
3 Oct 2026
Promoter’s complaints tally (all their projects)186 (Under Registration - 10 ) → 188 (Under Registration - 12 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)186 (Under Registration - 12 ) → 186 (Under Registration - 10 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)185 (Under Registration - 11 ) → 186 (Under Registration - 12 )
changed in Estanzo’s record
27 Sept 2026
Promoter’s complaints tally (all their projects)185 (Under Registration - 14 ) → 185 (Under Registration - 11 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)185 (Under Registration - 22 ) → 185 (Under Registration - 14 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)184 (Under Registration - 21 ) → 185 (Under Registration - 22 )
changed in Estanzo’s record
15 Sept 2026
Promoter’s complaints tally (all their projects)183 (Under Registration - 28 ) → 184 (Under Registration - 21 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)179 (Under Registration - 24 ) → 183 (Under Registration - 28 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)177 (Under Registration - 22 ) → 179 (Under Registration - 24 )
changed in Estanzo’s record
7 Sept 2026
Promoter’s complaints tally (all their projects)175 (Under Registration - 21 ) → 177 (Under Registration - 22 )
changed in Estanzo’s record
5 Sept 2026
Promoter’s complaints tally (all their projects)173 (Under Registration - 19 ) → 175 (Under Registration - 21 )
changed in Estanzo’s record
3 Sept 2026
Promoter’s complaints tally (all their projects)172 (Under Registration - 21 ) → 173 (Under Registration - 19 )
changed in Estanzo’s record
1 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 21 Oct 2026 · 24 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about CYBERTHUM PHASE II

Is CYBERTHUM PHASE II RERA registered?

Yes. CYBERTHUM PHASE II is registered with UPRERA under registration number UPRERAPRJ452606, registered on 23 Sept 2021. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for CYBERTHUM PHASE II?

The completion date filed with UPRERA is 25 Sept 2024. No completion certificate is on record yet.

Who is the builder of CYBERTHUM PHASE II?

MAX-DIGI INFOTECH PRIVATE LIMITED is the promoter entity that filed CYBERTHUM PHASE II with UPRERA (promoter RERA ID UPRERAPRM70627). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does CYBERTHUM PHASE II have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is CYBERTHUM PHASE II located?

CYBERTHUM PHASE II is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in CYBERTHUM PHASE II?

The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in CYBERTHUM PHASE II?

The approved unit plan filed with UPRERA runs from 101 to 6,960 m² of carpet area (about 1,092 to 74,915 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in CYBERTHUM PHASE II?

The approved unit plan describes 4 blocks and 24 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is CYBERTHUM PHASE II?

About 2 units per acre: 24 planned units across 13.44 acres (54,398 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗