DASNAC ARC (PHASE I)

UPRERARegistered

DASNAC ARC (PHASE I) is a RERA-registered commercial project by MONTEVISTA PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ823868). Registered with a completion deadline of 16 Jun 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
15%Q3'25
15%Q4'25
17%Q1'26
26%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ823868
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start16 Sept 2023
Project duration58 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressDASNAC ANNEXE I, ECE HOUSE, 28A KASTURBA GANDHI MARG, NEW DELHI 110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2023/03/21/8635

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered9 Oct 2023
Original completion16 Jun 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹62,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors725 · 1 · 14 (units from plan)
Homes · commercial units215 · 510 (shops and offices filed in the same plan)
  • SHOP510 70%
  • STUDIO212 29%
  • OTHER3 <1%
ConfigurationUnitsCarpet area
STUDIO21218-29
SHOP5102-61
OTHER31
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
PH1 · STUDIO, SHOP, OTHER147251-61
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 6 m² for a OTHER, far outside the rest of that type, so the ranges above leave it out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AR. MOHAMMED AZHAR
License CA/2015/72146
Y-237/B, SECTOR 12, NOIDA
Engineer
DR. PADAM KUMAR
701, I THUM, A-40, SECTOR 62, NOIDA
Contractor
SELF
SELF
Sr.Development work declared to RERA
1Demarcation of Plots
MULTIPLE PHASES WILL BE CONSTRUCTED ON THE PLOT. PROPORTIONATE SHARE IN THE PLOT FOR EACH PHASE SHALL BE DECIDED UPON COMPLETION OF ALL CURRENT AND FUTURE PHASES OF THE PROJECT AS PER DEED OF DECLARATION (UNDER UP APARTMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME.
2Boundary Wall
BOUNDARY WALL IN COMBINATION OF RCC, BRICKWORK AND M.S. MATERIAL ON ONE OR MORE SIDES OF THE PLOT. SOME SIDES/ PARTS OF THE PLOT MAY NOT HAVE BOUNDARY WALL AS PER DECISION OF THE PROMOTER. (COMMON FOR ALL PHASES)
3Road Work
NO ROADS TO BE CONSTRUCTED. RAMP/ ROAD-IN-SLOPE MAY HAVE MINOR STEPS AS FEASIBLE FOR FIRE TENDER MOVEMENT. (COMMON FOR ALL PHASES)
4Footpaths
NO FOOTPATH TO BE CONSTRUCTED. CIRCULATION AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME.
5Water Supply Including Drinking Water Facilities
WATER SUPPLY FROM NOIDA/ STATE STORED IN U.G. TANK AND O.H. TANK. U.G. TANKS , 2 OF 125 KLD EACH AND 2 OF 25 KLD EACH (OR AS REVISED AND AMENDED BY THE PROMOTER) . (COMMON FOR ALL PHASES) PROVISION FOR GROUNDWATER ONLY IF PERMITTED AS PER LAW.
6Sewer System
SEWER SYSTEM WITH HUME PIPES AND MANHOLES. (COMMON FOR ALL PHASES)
7Drain
DRAINAGE FOR RAIN WATER INCLUDING THROUGH RAIN WATER HARVESTING PIT. (COMMON FOR ALL PHASES)
8Parks
HARD PAVED LANDSCAPE AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME. (COMMON FOR ALL PHASES)
9Tree Planting
TREES AS PER PLANS APPROVED , REVISED AND AMENDED FROM TIME TO TIME. (COMMON FOR ALL PHASES)
10Design For Electric Supply Including Street Lighting
SINGLE POINT ELECTRICITY DISTRIBUTION SYSTEM WITH AUTO CUT PREPAID ENERGY METERS AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME . MAINTENANCE AND ALL OTHER DUES / CHARGES SHALL BE COLLECTED THROUGH AUTO CUT PREPAID METERS. PROMOTER SHALL HAVE THE FIRST RIGHT TO SUPPLY ELECTRICITY TO PHASE/ PROJECT. (COMMON FOR ALL PHASES)
11Community Buildings
LIMITED COMMON AREAS AND INDEPENDENT AREAS, COMMERCIAL FACILITIES, COMMERCIAL SPACES , AREAS COUNTED IN F.A.R. ETC. SHALL NOT BE PART OF COMMON AREAS AND FACILITIES. DEED OF DECLARATION (UNDER UP APARTMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME SHALL BE BINDING ON ALLOTTEES. NO COMMUNITY BUILDING IS PART OF THE PHASE/ PROJECT.
12Treatment and Disposal System of Sewage and Sullage water
TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER THROUGH 100 KLD SEWAGE TREATMENT PLANT (OR AS REVISED AND AMENDED BY THE PROMOTER). (COMMON FOR ALL PHASES)
13Solid Waste Management And Disposal System
GARBAGE BIN AND WASTE DISPOSAL TO BE PROVIDED BY NOIDA/ STATE (COMMON FOR ALL PHASES). PROMOTER SHALL HAVE THE RIGHT TO CHARGE FOR OR NOT PERMIT CERTAIN SOLID WASTE DISPOSAL AS PER POLICY OF THE PROMOTER FOR THE PHASE/ PROJECT. IN ANY CASE, NO HAZARDOUS WASTE DISPOSAL SHALL BE PERMITTED.
14Water Conservation System
DRAINAGE FOR RAIN WATER INCLUDING THROUGH RAIN WATER HARVESTING PIT. (COMMON FOR ALL PHASES)
15Energy Management System Including Use of Renewable Energy
VARIOUS COMMON AREAS AND FACILITIES AND LIMITED COMMON AREAS SHALL BE RESERVED FOR RENEWABLE/ ELECTRIC INSTALLATION. ALL RENEWABLE ENERGY SYSTEM SHALL BE PROPERTY OF PROMOTER OR ITS NOMINATED THIRD PARTY. PROMOTER SHALL HAVE THE FIRST RIGHT TO SUPPLY ELECTRICITY TO PHASE/ PROJECT. ALLOTTEES SHALL MAKE PAYMENT FOR RENEWABLE ENERGY SUPPLIED AT THE RATES PRESCRIBED BY THE PROMOTER.
16Fire Protection And Fire Safety System
FIRE PROTECTION AND FIRE SAFETY SYSTEM TO BE AS PER NOC ISSUED BY FIRE DEPARTMENT. (COMMON FOR ALL PHASES) FIRE FIGHTING SERVICES TO BE PROVIDED BY NOIDA/ STATE.
17Social Infrastructure And Other Public Amenities Including Public Health Services
MULTIPLE PHASES WILL BE CONSTRUCTED ON THE PLOT. PROPORTIONATE SHARE IN COMMON AREAS AND FACILITIES FOR EACH PHASE SHALL BE DECIDED ON COMPLETION OF ALL CURRENT AND FUTURE PHASES OF THE PROJECT AS PER DEED OF DECLARATION BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME. NO SOCIAL INFRASTRUCTURE AND OTHER PUBLIC AMENITIES INCLUDING PUBLIC HEALTH SERVICES ARE PART OF THIS PHASE/ PROJECT.
18Emergency Evacuation Services
EVACUATION ROUTE AS PER NOC ISSUED BY FIRE DEPARTMENT. (COMMON FOR ALL PHASES) EMERGENCY EVACUATION SERVICES TO BE PROVIDED BY NOIDA/ STATE.
19Other Miscellaneous Work
LIMITED COMMON AREAS SHALL BE EXCLUSIVELY FOR USE BY SOME UNITS AND INDEPENDENT ARAES SHALL EXCLUSIVELY BE THE PROPERTY OF THE PROMOTER AS PER DEED OF DECLARATION (UNDER UP APARTMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME. SERVICE FLOORS ARE NOT PART OF THIS PHASE/ PROJECT. ALL OF THE ABOVE SERVICES MAY BE CHARGEABLE AS SEPARATE FROM MAINTENANCE CHARGES AS PER THE POLICY OF THE PROMOTER. PROMOTER SHALL HAVE VARIOUS SPECIAL RIGHTS AS PER THE APPLICATION FORM/ AGREEMENT FOR SUBLEASE.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 16 Jun 2028.

Sanctioned by Noida Authority · 5,153 sqm of land · an approved plan of 1 block and 725 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2023/03/21/863517 Jun 202316 Jun 202816 Jun 203316 Jun 2028
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
MPC-02, SECTOR 72, NOIDA5152.653Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 959
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New1 Aug 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New1 Aug 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New21 Aug 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New1 Aug 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Aug 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Aug 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Aug 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New21 Aug 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New13 Sept 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New23 Aug 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New23 Aug 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New23 Aug 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New21 Aug 2023 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q2.

QuarterConstructionCertificates
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q215%CA ↗ · Arch ↗ · Eng ↗
2025-Q315%CA ↗ · Arch ↗ · Eng ↗
2025-Q417%CA ↗ · Arch ↗ · Eng ↗
2026-Q126%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameMONTEVISTA PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM248954
PANAAQCM4599R
CIN / TANDELM44342E
Name of chairmanRAJEEV ARORA
Registered addressDASNAC ANNEXE I, ECE HOUSE, 28A KASTURBA GANDHI MARG, NEW DELHI 110001
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S. MONTEVISTA PVT LTD - COLLECTION AC DASNAC ARC PHASE-1BankICICI BANK LTDBranchNOIDA SECTOR 16Branch addressUNIT NO. 2, C-1, GROUND FLOOR, WTT, SECTOR 16, NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007390
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S. MONTEVISTA PVT LTD - SEPARATE BANK AC DASNAC ARC PHASE-1BankICICI BANK LTDBranchNOIDA SECTOR 16Branch addressUNIT NO. 2, C-1, GROUND FLOOR, WTT, SECTOR 16, NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007390
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S. MONTEVISTA PVT LTD - RERA TRANSACTION AC DASNAC ARC PHASE-1BankICICI BANK LTDBranchNOIDA SECTOR 16Branch addressUNIT NO. 2, C-1, GROUND FLOOR, WTT, SECTOR 16, NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007390
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about DASNAC ARC (PHASE I)

Is DASNAC ARC (PHASE I) RERA registered?

Yes. DASNAC ARC (PHASE I) is registered with UPRERA under registration number UPRERAPRJ823868, registered on 9 Oct 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for DASNAC ARC (PHASE I)?

The completion date filed with UPRERA is 16 Jun 2028. No completion certificate is on record yet.

Who is the builder of DASNAC ARC (PHASE I)?

MONTEVISTA PRIVATE LIMITED is the promoter entity that filed DASNAC ARC (PHASE I) with UPRERA (promoter RERA ID UPRERAPRM248954). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does DASNAC ARC (PHASE I) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is DASNAC ARC (PHASE I) located?

DASNAC ARC (PHASE I) is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in DASNAC ARC (PHASE I)?

The unit plan filed with UPRERA lists STUDIO, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in DASNAC ARC (PHASE I)?

The approved unit plan filed with UPRERA runs from 1 to 61 m² of carpet area (about 11 to 657 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in DASNAC ARC (PHASE I)?

The approved unit plan describes 1 block and 725 units of which 215 are homes and 510 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is DASNAC ARC (PHASE I)?

About 569 units per acre: 725 planned units across 1.27 acres (5,153 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗