DASNAC ARC (PHASE I) is a RERA-registered commercial project by MONTEVISTA PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ823868). Registered with a completion deadline of 16 Jun 2028.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ823868 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Noida Authority |
| Proposed start | 16 Sept 2023 |
| Project duration | 58 months |
| Address | Gautam Buddha Nagar, Gautam Budh Nagar |
| Tehsil | Gautam Buddha Nagar |
| Applicant type | Company |
| Applicant address | DASNAC ANNEXE I, ECE HOUSE, 28A KASTURBA GANDHI MARG, NEW DELHI 110001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
2023/03/21/8635
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 9 Oct 2023 |
| Original completion | 16 Jun 2028 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹62,000 |
| Sanctioning authority | Noida Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- SHOP510 70%
- STUDIO212 29%
- OTHER3 <1%
| Configuration | Units | Carpet area |
|---|---|---|
| STUDIO | 212 | 18-29 |
| SHOP | 510 | 2-61 |
| OTHER | 3 | 1 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| PH1 · STUDIO, SHOP, OTHER | 14 | 725 | 1-61 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots MULTIPLE PHASES WILL BE CONSTRUCTED ON THE PLOT. PROPORTIONATE SHARE IN THE PLOT FOR EACH PHASE SHALL BE DECIDED UPON COMPLETION OF ALL CURRENT AND FUTURE PHASES OF THE PROJECT AS PER DEED OF DECLARATION (UNDER UP APARTMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME. |
| 2 | Boundary Wall BOUNDARY WALL IN COMBINATION OF RCC, BRICKWORK AND M.S. MATERIAL ON ONE OR MORE SIDES OF THE PLOT. SOME SIDES/ PARTS OF THE PLOT MAY NOT HAVE BOUNDARY WALL AS PER DECISION OF THE PROMOTER. (COMMON FOR ALL PHASES) |
| 3 | Road Work NO ROADS TO BE CONSTRUCTED. RAMP/ ROAD-IN-SLOPE MAY HAVE MINOR STEPS AS FEASIBLE FOR FIRE TENDER MOVEMENT. (COMMON FOR ALL PHASES) |
| 4 | Footpaths NO FOOTPATH TO BE CONSTRUCTED. CIRCULATION AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME. |
| 5 | Water Supply Including Drinking Water Facilities WATER SUPPLY FROM NOIDA/ STATE STORED IN U.G. TANK AND O.H. TANK. U.G. TANKS , 2 OF 125 KLD EACH AND 2 OF 25 KLD EACH (OR AS REVISED AND AMENDED BY THE PROMOTER) . (COMMON FOR ALL PHASES) PROVISION FOR GROUNDWATER ONLY IF PERMITTED AS PER LAW. |
| 6 | Sewer System SEWER SYSTEM WITH HUME PIPES AND MANHOLES. (COMMON FOR ALL PHASES) |
| 7 | Drain DRAINAGE FOR RAIN WATER INCLUDING THROUGH RAIN WATER HARVESTING PIT. (COMMON FOR ALL PHASES) |
| 8 | Parks HARD PAVED LANDSCAPE AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME. (COMMON FOR ALL PHASES) |
| 9 | Tree Planting TREES AS PER PLANS APPROVED , REVISED AND AMENDED FROM TIME TO TIME. (COMMON FOR ALL PHASES) |
| 10 | Design For Electric Supply Including Street Lighting SINGLE POINT ELECTRICITY DISTRIBUTION SYSTEM WITH AUTO CUT PREPAID ENERGY METERS AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME . MAINTENANCE AND ALL OTHER DUES / CHARGES SHALL BE COLLECTED THROUGH AUTO CUT PREPAID METERS. PROMOTER SHALL HAVE THE FIRST RIGHT TO SUPPLY ELECTRICITY TO PHASE/ PROJECT. (COMMON FOR ALL PHASES) |
| 11 | Community Buildings LIMITED COMMON AREAS AND INDEPENDENT AREAS, COMMERCIAL FACILITIES, COMMERCIAL SPACES , AREAS COUNTED IN F.A.R. ETC. SHALL NOT BE PART OF COMMON AREAS AND FACILITIES. DEED OF DECLARATION (UNDER UP APARTMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME SHALL BE BINDING ON ALLOTTEES. NO COMMUNITY BUILDING IS PART OF THE PHASE/ PROJECT. |
| 12 | Treatment and Disposal System of Sewage and Sullage water TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER THROUGH 100 KLD SEWAGE TREATMENT PLANT (OR AS REVISED AND AMENDED BY THE PROMOTER). (COMMON FOR ALL PHASES) |
| 13 | Solid Waste Management And Disposal System GARBAGE BIN AND WASTE DISPOSAL TO BE PROVIDED BY NOIDA/ STATE (COMMON FOR ALL PHASES). PROMOTER SHALL HAVE THE RIGHT TO CHARGE FOR OR NOT PERMIT CERTAIN SOLID WASTE DISPOSAL AS PER POLICY OF THE PROMOTER FOR THE PHASE/ PROJECT. IN ANY CASE, NO HAZARDOUS WASTE DISPOSAL SHALL BE PERMITTED. |
| 14 | Water Conservation System DRAINAGE FOR RAIN WATER INCLUDING THROUGH RAIN WATER HARVESTING PIT. (COMMON FOR ALL PHASES) |
| 15 | Energy Management System Including Use of Renewable Energy VARIOUS COMMON AREAS AND FACILITIES AND LIMITED COMMON AREAS SHALL BE RESERVED FOR RENEWABLE/ ELECTRIC INSTALLATION. ALL RENEWABLE ENERGY SYSTEM SHALL BE PROPERTY OF PROMOTER OR ITS NOMINATED THIRD PARTY. PROMOTER SHALL HAVE THE FIRST RIGHT TO SUPPLY ELECTRICITY TO PHASE/ PROJECT. ALLOTTEES SHALL MAKE PAYMENT FOR RENEWABLE ENERGY SUPPLIED AT THE RATES PRESCRIBED BY THE PROMOTER. |
| 16 | Fire Protection And Fire Safety System FIRE PROTECTION AND FIRE SAFETY SYSTEM TO BE AS PER NOC ISSUED BY FIRE DEPARTMENT. (COMMON FOR ALL PHASES) FIRE FIGHTING SERVICES TO BE PROVIDED BY NOIDA/ STATE. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services MULTIPLE PHASES WILL BE CONSTRUCTED ON THE PLOT. PROPORTIONATE SHARE IN COMMON AREAS AND FACILITIES FOR EACH PHASE SHALL BE DECIDED ON COMPLETION OF ALL CURRENT AND FUTURE PHASES OF THE PROJECT AS PER DEED OF DECLARATION BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME. NO SOCIAL INFRASTRUCTURE AND OTHER PUBLIC AMENITIES INCLUDING PUBLIC HEALTH SERVICES ARE PART OF THIS PHASE/ PROJECT. |
| 18 | Emergency Evacuation Services EVACUATION ROUTE AS PER NOC ISSUED BY FIRE DEPARTMENT. (COMMON FOR ALL PHASES) EMERGENCY EVACUATION SERVICES TO BE PROVIDED BY NOIDA/ STATE. |
| 19 | Other Miscellaneous Work LIMITED COMMON AREAS SHALL BE EXCLUSIVELY FOR USE BY SOME UNITS AND INDEPENDENT ARAES SHALL EXCLUSIVELY BE THE PROPERTY OF THE PROMOTER AS PER DEED OF DECLARATION (UNDER UP APARTMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME. SERVICE FLOORS ARE NOT PART OF THIS PHASE/ PROJECT. ALL OF THE ABOVE SERVICES MAY BE CHARGEABLE AS SEPARATE FROM MAINTENANCE CHARGES AS PER THE POLICY OF THE PROMOTER. PROMOTER SHALL HAVE VARIOUS SPECIAL RIGHTS AS PER THE APPLICATION FORM/ AGREEMENT FOR SUBLEASE. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 16 Jun 2028.
Sanctioned by Noida Authority · 5,153 sqm of land · an approved plan of 1 block and 725 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 2023/03/21/8635 | 17 Jun 2023 | 16 Jun 2028 | 16 Jun 2033 | 16 Jun 2028 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
16 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| MPC-02, SECTOR 72, NOIDA | 5152.653 | Plot |
| Lease deed · 959 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 1 Aug 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 1 Aug 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 21 Aug 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 Aug 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 Aug 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 21 Aug 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 Aug 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Aug 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 13 Sept 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 23 Aug 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 23 Aug 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 23 Aug 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 21 Aug 2023 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 15% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 15% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 17% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 26% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | MONTEVISTA PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM248954 |
| PAN | AAQCM4599R |
| CIN / TAN | DELM44342E |
| Name of chairman | RAJEEV ARORA |
| Registered address | DASNAC ANNEXE I, ECE HOUSE, 28A KASTURBA GANDHI MARG, NEW DELHI 110001 |
| RERA contact | |
| Registered since | 2023 |
Nearby projects
Gautam Budh Nagar
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | M/S. MONTEVISTA PVT LTD - COLLECTION AC DASNAC ARC PHASE-1BankICICI BANK LTDBranchNOIDA SECTOR 16Branch addressUNIT NO. 2, C-1, GROUND FLOOR, WTT, SECTOR 16, NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007390 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | M/S. MONTEVISTA PVT LTD - SEPARATE BANK AC DASNAC ARC PHASE-1BankICICI BANK LTDBranchNOIDA SECTOR 16Branch addressUNIT NO. 2, C-1, GROUND FLOOR, WTT, SECTOR 16, NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007390 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | M/S. MONTEVISTA PVT LTD - RERA TRANSACTION AC DASNAC ARC PHASE-1BankICICI BANK LTDBranchNOIDA SECTOR 16Branch addressUNIT NO. 2, C-1, GROUND FLOOR, WTT, SECTOR 16, NOIDA 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0007390 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 18 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about DASNAC ARC (PHASE I)
Is DASNAC ARC (PHASE I) RERA registered?
Yes. DASNAC ARC (PHASE I) is registered with UPRERA under registration number UPRERAPRJ823868, registered on 9 Oct 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for DASNAC ARC (PHASE I)?
The completion date filed with UPRERA is 16 Jun 2028. No completion certificate is on record yet.
Who is the builder of DASNAC ARC (PHASE I)?
MONTEVISTA PRIVATE LIMITED is the promoter entity that filed DASNAC ARC (PHASE I) with UPRERA (promoter RERA ID UPRERAPRM248954). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does DASNAC ARC (PHASE I) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is DASNAC ARC (PHASE I) located?
DASNAC ARC (PHASE I) is registered in Gautam Budh Nagar, as filed with UPRERA.
What configurations are available in DASNAC ARC (PHASE I)?
The unit plan filed with UPRERA lists STUDIO, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in DASNAC ARC (PHASE I)?
The approved unit plan filed with UPRERA runs from 1 to 61 m² of carpet area (about 11 to 657 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in DASNAC ARC (PHASE I)?
The approved unit plan describes 1 block and 725 units of which 215 are homes and 510 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is DASNAC ARC (PHASE I)?
About 569 units per acre: 725 planned units across 1.27 acres (5,153 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗