DASNAC YUVA

UPRERARegistered

DASNAC YUVA is a RERA-registered commercial project by CLEARLAKE PRIVATE LIMITED in SECTOR 124, Gautam Budh Nagar (RERA ID UPRERAPRJ871413). Registered with a completion deadline of 24 Oct 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
44%Q3'25
7%Q4'25
15%Q1'26
19%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ871413
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start25 Oct 2024
Project duration60 months
AddressA-2, SECTOR 124, NOIDA, SECTOR 124, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressDASNAC ANNEXE I, ECE HOUSE, 28A KASTURBA GANDHI MARG, NEW DELHI 110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2024/08/12/11073

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered25 Jan 2025
Original completion24 Oct 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹86,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,201 · 1 · 35 (units from plan)
Homes · commercial units962 · 239 (shops and offices filed in the same plan)
  • STUDIO962 80%
  • SHOP239 20%
ConfigurationUnitsCarpet area
STUDIO96217-18
SHOP2394-131
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
P1 · STUDIO, OTHER, SHOP351,2014-131
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AR. MOHD. AZHAR
License CA/2015/72146
C-50, 1ST FLOOR, SECTOR 6, NOIDA 201301
Engineer
ER. AJAY GUPTA
C-486, GROUND FLOOR, C.R. PARK, NEW DELHI 110019
Contractor
SELF - CLEARLAKE PRIVATE LIMITED
DASNAC ANNEXE I, ECE HOUSE, 28A KASTURBA GANDHI MARG, NEW DELHI 110001
Sr.Development work declared to RERA
1Demarcation of Plots
MULTIPLE PHASES WILL BE CONSTRUCTED ON THE PLOT. PROPORTIONATE SHARE IN PLOT FOR EACH PHASE SHALL BE DECIDED UPON COMPLETION OF ALL CURRENT AND FUTURE PHASES OF THE PROJECT AS PER DEED OF DECLARATION (UNDER UP APARTMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME. PROJECT/PHASE IS SUBJECT TO VARIOUS NOTES MADE IN SANCTION DRAWINGS APPROVED BY NOIDA. CERTAIN UNITS SHOWN AS FUTURE PROVISION IN SANCTIONED FLOOR PLAN AND SHOWN IN PROVISION FLOOR PLAN ARE SUBJECT TO OBTAINING REQUISITE APPROVAL FROM NOIDA.
2Boundary Wall
BOUNDARY WALL IN COMBINATION OF RCC, BRICKWORK AND M.S. MATERIAL ON ONE OR MORE SIDES OF THE PLOT. SOME SIDES/PARTS OF THE PLOT MAY NOT HAVE BOUNDARY WALL AS PER DECISION OF THE PROMOTER.
3Road Work
NO ROADS TO BE CONSTRUCTED. RAMP/ ROAD-IN-SLOPE MAY HAVE MINOR STEPS AS FEASIBLE FOR FIRE TENDER MOVEMENT.
4Footpaths
NO FOOTPATH TO BE CONSTRUCTED. CIRCULATION AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME.
5Water Supply Including Drinking Water Facilities
WATER SUPPLY FROM NOIDA/ STATE STORED IN U.G. TANK AND O.H. TANK. , 2 OF 250KLD EACH AND 2 OF 10 KLD EACH (OR AS REVISED AND AMENDED BY THE PROMOTER). PROVISION FOR GROUNDWATER ONLY IF PERMITTED AS PER LAW.
6Sewer System
SEWER SYSTEM WITH HUME PIPES AND MANHOLES.
7Drain
DRAINAGE FOR RAIN WATER INCLUDING THROUGH RAIN WATER HARVESTING PIT.
8Parks
HARD PAVED LANDSCAPE AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME.
9Tree Planting
TREES AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME.
10Design For Electric Supply Including Street Lighting
SINGLE POINT ELECTRICITY DISTRIBUTION SYSTEM WITH AUTO CUT PREPAID ENERGY METERS AS PER PLANS APPROVED, REVISED AND AMENDED FROM TIME TO TIME. MAINTENANCE AND ALL OTHER DUES/ CHARGES SHALL BE COLLECTED THROUGH AUTO CUT PREPAID METERS. PROMOTER SHALL HAVE THE FIRST RIGHT TO SUPPLY ELECTRICITY TO PHASE/ PROJECT.
11Community Buildings
LIMITED COMMON AREAS AND INDEPENDENT AREAS, COMMERCIAL FACILITIES, COMMERCIAL SPACES, AREAS COUNTED IN F.A.R. ETC. SHALL NOT BE PART OF COMMON AREAS AND FACILITIES. DEED OF DECLARATION (UNDER UP APATRMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME SHALL BE BINDING ON ALLOTTEES. NO COMMUNITY BUILDING IS PART OF THE PROJECT.
12Treatment and Disposal System of Sewage and Sullage water
TREATMENT AND DISPOSAL OF SEWAGE AND SULLAGE WATER THROUGH 170 KLD SEWAGE TREATMENT PLANT (OR AS REVISED AND AMENDED BY THE PROMOTER).
13Solid Waste Management And Disposal System
GARBAGE BIN AND WASTE DISPOSAL TO BE PROVIDED BY NOIDA/ STATE (COMMON FOR ALL PHASES). PROMOTER SHALL HAVE THE RIGHT TO CHARGE FOR OR NOT PERMIT CERTAIN SOLID WASTE DISPOSAL AS PER POLICY OF PROMOTER FOR THE PROJECT. IN ANY CASE, NO HAZARDOUS WASTE DISPOSAL SHALL BE PERMITTED.
14Water Conservation System
DRAINAGE FOR RAIN WATER INCLUDING THROUGH RAIN WATER HARVESTING PIT.
15Energy Management System Including Use of Renewable Energy
VARIOUS COMMON AREAS AND FACILITIES OR LIMITED COMMON AREAS SHALL BE RESERVED FOR RENEWABLE/ ELECTRIC INSTALLATION. ALL RENEWABLE ENERGY SYSTEMS SHALL BE PROPERTY OF PROMOTER OR ITS NOMINATED THIRD PARTY. PROMOTER SHALL HAVE THE FIRST RIGHT TO SUPPLY ELECTRICITY TO PROJECT. ALLOTTEES SHALL MAKE PAYMENT FOR RENEWABLE ENERGY SUPPLIED AT THE RATES PRESCRIBED BY THE PROMOTER.
16Fire Protection And Fire Safety System
FIRE PROTECTION AND FIRE SAFTEY SYSTEM TO BE AS PER NOC ISSUED BY FIRE DEPARTMENT. FIRE FIGHTING SERVICES TO BE PROVIDED BY NOIDA/ STATE.
17Social Infrastructure And Other Public Amenities Including Public Health Services
MULTIPLE PHASES WILL BE CONSTRUCTED ON THE PLOT. PROPORTIONATE SHARE IN COMMON AREAS AND FACILITIES FOR EACH PHASE SHALL BE DECIDED UPON COMPLETION OF ALL CURRENT AND FUTURE PHASES OF THE PROJECT AS PER DEED OF DECLARATION BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME . NO SOCIAL INFRASTRUCTURE AND OTHER PUBLIC AMENITIES INCLUDING PUBLIC HEALTH SERVICES ARE PART OF THE PROJECT.
18Emergency Evacuation Services
EMERGENCY EVACUATION SERVICES TO BE PROVIDED BY NOIDA/ STATE.
19Other Miscellaneous Work
LIMITED COMMON AREAS SHALL BE EXCLUSIVELY FOR USE BY SOME UNITS AND INDEPENDENT AREAS SHALL EXCLUSIVELY BE THE PROPERTY OF PROMOTER AS PER DEED OF DECLARATION (UNDER UP APARTMENT ACT) BY THE PROMOTER AS REVISED AND AMENDED FROM TIME TO TIME. SERVICE FLOORS ARE NOT PART OF THIS PROJECT. ALL OF THE ABOVE SERVICES MAY BE CHARGEABLE AS SEPARATE FROM MAINTENANCE CHARGES AS PER THE POLICY OF THE PROMOTER. PROMOTER SHALL HAVE VARIOUS SPECIAL RIGHTS AS PER THE APPLICATION FORM/ AGREEMENT FOR SUBLEASE. SUCH FLOORS OR AREAS WHICH ARE NOT PART OF RERA REGISTERED PROJECT/PHASE ARE THE SOLE AND ABSOLUTE PROPERTY OF THE PROMOTER, NOT SUBJECT TO UP APARTMENT ACT/RERA AND ARE WITHOUT ANY RIGHT, TITLE, OR INTEREST WHATSOEVER OF THE ALLOTTEES.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 24 Oct 2029.

Sanctioned by Noida Authority · 7,504 sqm of land · an approved plan of 1 block and 1201 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2024/08/12/1107325 Oct 202424 Oct 202924 Oct 203424 Oct 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
A-2, SECTOR 124, NOIDA7504Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 1914
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New15 Nov 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New15 Nov 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Nov 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New29 Nov 2024 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New10 Jan 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New18 Nov 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New18 Nov 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New18 Nov 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New18 Nov 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Nov 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New15 Nov 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New15 Nov 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New15 Nov 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New22 Jan 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New29 Nov 2024 ↗

Quarterly progress reports

7 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

7 quarterly progress reports are on file with UPRERA, covering 2024-Q3 to 2026-Q1.

QuarterConstructionCertificates
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q244%CA ↗ · Arch ↗ · Eng ↗
2025-Q37%CA ↗ · Arch ↗ · Eng ↗
2025-Q415%CA ↗ · Arch ↗ · Eng ↗
2026-Q119%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameCLEARLAKE PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM330277
PANAAICC6117H
CIN / TANDELC20856D
Name of chairmanRAJEEV ARORA
Registered addressDASNAC ANNEXE I, ECE HOUSE, 28A KASTURBA GANDHI MARG, NEW DELHI 110001
RERA contact
Registered since2024
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S. CLEARLAKE PVT LTD COLLECTION ACCOUNT DASNAC YUVABankINDUSIND BANK LTD.BranchSECTOR 18, NOIDABranch addressNOIDA, N 10-11, SECTOR 18, NOIDA-201301, UTTAR PRADESH, INDIABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036Branch emailESCROWSUPPORT@ICICIBANK.COM
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S. CLEARLAKE PVT LTD SEPARATE BANK ACCOUNT DASNAC YUVABankINDUSIND BANK LTD.BranchSECTOR 18, NOIDABranch addressNOIDA, N 10-11, SECTOR 18, NOIDA-201301, UTTAR PRADESH, INDIABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S. CLEARLAKE PVT LTD-RERA TRANSACTION ACCOUNT DASNAC YUVABankINDUSIND BANK LTD.BranchSECTOR 18, NOIDABranch addressNOIDA, N 10-11, SECTOR 18, NOIDA-201301, UTTAR PRADESH, INDIABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about DASNAC YUVA

Is DASNAC YUVA RERA registered?

Yes. DASNAC YUVA is registered with UPRERA under registration number UPRERAPRJ871413, registered on 25 Jan 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for DASNAC YUVA?

The completion date filed with UPRERA is 24 Oct 2029. No completion certificate is on record yet.

Who is the builder of DASNAC YUVA?

CLEARLAKE PRIVATE LIMITED is the promoter entity that filed DASNAC YUVA with UPRERA (promoter RERA ID UPRERAPRM330277). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does DASNAC YUVA have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is DASNAC YUVA located?

DASNAC YUVA is registered in SECTOR 124, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in DASNAC YUVA?

The unit plan filed with UPRERA lists STUDIO, OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in DASNAC YUVA?

The approved unit plan filed with UPRERA runs from 4 to 131 m² of carpet area (about 43 to 1,410 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in DASNAC YUVA?

The approved unit plan describes 1 block and 1,201 units of which 962 are homes and 239 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is DASNAC YUVA?

About 648 units per acre: 1,201 planned units across 1.85 acres (7,504 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗