M3M The Cullinan

UPRERARegistered

M3M The Cullinan is a RERA-registered mixed project by Lavish Buildmart Pvt. Ltd. in Gautam Budh Nagar (RERA ID UPRERAPRJ442214). Registered with a completion deadline of 10 Apr 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
40%Q3'25
45%Q4'25
50%Q1'26
55%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ442214
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start11 Apr 2023
Project duration60 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address41st Floor, Tower-1, M3M International Financial Center, Sector-66, Badshahpur, Gurgaon, Badshahpur, Haryana, India, 122101
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    Noida/CAP/2023/8287/IV-1552/474

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered2 Jun 2023
Original completion10 Apr 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹3,54,750
Sanctioning authorityNoida Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Vishal Sharma
License CA/98/23261
Confluence, B-521, New Friends Colony, New Delhi-110065
Engineer
Pankish Goel
Technical Projects Consultants Ltd., B-74, Sector 57, Noida-UP
Contractor
Lavish Buildmart Pvt. Ltd.
6th Floor, M3M Tee Point, North Block, Sector 65, Gurugram, Haryana-122101
Sr.Development work declared to RERA
1Demarcation of Plots
Not Applicable
2Boundary Wall
230mm wide and 2.1 meter high earthquake resistant boundary wall of RCC/ Mild steel/ brick filled.
3Road Work
All roads in the complex will be in combination of trimix, concrete pavers of different colours, shape thickness Roads will be laid over 225mm water bound macadam.
4Footpaths
All footpath in the complex will be in combination of concrete pavers of different colours shape and thickness of 65 mm and 80 mm laid over 150 mm water bound macadam surface.
5Water Supply Including Drinking Water Facilities
Potable water supply from municipal water supply shall be collected in underground collection tank and pumped to overhead water tank. The supply of water to individual units shall be from the said overhead water tanks.
6Sewer System
The sewage will be collected through a soil pipeline arrangement, bends and inspection chambers leading to the sewage water treatment plant (STP) of the project, and treated water will be used for irrigation and flushing purpose.
7Drain
Drains having a minimum width of 150 mm will be provided for collection and channelization of rain water (surface run off).
8Parks
Green area to be provided as per approved plan.
9Tree Planting
The tress will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions, Tress will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.
10Design For Electric Supply Including Street Lighting
LED light will be used for street sighting.
11Community Buildings
Comminity area is within the building footprint and will be developed as per approved plan.
12Treatment and Disposal System of Sewage and Sullage water
Sewage shall be treated in sewage Treatment plant (STP) and there after treated water to be used for flushing and irrigation.
13Solid Waste Management And Disposal System
Solid waste to be collected form individual flats and stored in garbage room. Recyclable shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through approved agents.
14Water Conservation System
Rain water harvesting pits shall be provided for ground water recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.
15Energy Management System Including Use of Renewable Energy
Solar panels will be used to reduce the energy consumption and electrical appliances with 5 star rating will be used in community building.
16Fire Protection And Fire Safety System
Sprinkler, fire doors, yard hydrants, smoke detector and fire alarm system will be provided as applicable .
17Social Infrastructure And Other Public Amenities Including Public Health Services
Common social infrastructure shall be provided for all the phases combined.
18Emergency Evacuation Services
Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

66 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1999 TECHNOLOGY VENTURES PRIVATE LIMITEDUPRERAAGT24832
2ACUBE SOLUTIONSUPRERAAGT10220
3Aditya EstatesUPRERAAGT18744
4Ahmed HashimUPRERAAGT19745
5Amit KapoorUPRERAAGT22482
6BANI ADVISORS LLPUPRERAAGT23757
7BHIM PRAKASH JIGYASUUPRERAAGT17452
8BHR ConsultingsUPRERAAGT21880
9BLUE SAPPHIRE INFRASTRUCTURE LLPUPRERAAGT23418
10BRICK AND WALL INFRA SOLUTIONS PRIVATE LIMITEDUPRERAAGT23294
11BULLMEN REALTY INDIA PRIVATE LIMITEDUPRERAAGT10138
12CAPITALBOON CONSULTINGUPRERAAGT18663
13DIGAMBERUPRERAAGT24437
14DINESH KUMARUPRERAAGT11019
15Dream Fillers RealtorsUPRERAAGT24744
16Expert InvestorsUPRERAAGT17411
17Geetanjali Homestate Private LimitedUPRERAAGT23464
18HIMANSHU AGARWALUPRERAAGT16908
19INVEST MANGOUPRERAAGT12212
20INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
21INVESTOXPERT ADVISORS PVT LTDUPRERAAGT21108
22JAI AMBEY CONSULTANTSUPRERAAGT11064
23JENIKA VENTURES Private LimitedUPRERAAGT21501
24JITENDRA GUPTAUPRERAAGT18497
25KAVI KANTUPRERAAGT24223
26KD REALTORS PRIVATE LIMITEDUPRERAAGT10863
27KUNWAR SINGH RAWATUPRERAAGT21187
28M/S ELITE PRO INFRA PRIVATE LIMITEDUPRERAAGT24781
29MADHYAM ESTATE LINKERS PVT LTDUPRERAAGT10509
30MAHIPAL SINGHUPRERAAGT23706
31MANIBHUSHAN KUMARUPRERAAGT24158
32MBS CONSULTINGUPRERAAGT20831
33MOHD. AFAQ ANSARIUPRERAAGT24581
34MuditUPRERAAGT12276
35MY REALESTATE SERVICES MRE LLPUPRERAAGT21008
36NEOBRIX CONSULTING PVT LTDUPRERAAGT10059
37OHM SURYA PROPMART PVT. LTD.UPRERAAGT11609
38ORANGE DOOR INFRA PRIVATE LIMITEDUPRERAAGT15693
39Parikshit ChopraUPRERAAGT17710
40Pegasus Infra Consulting Pvt Ltd ( formerly known as Investors Infrahome Pvt Ltd)UPRERAAGT10062
41PRASHANT SACHDEVAUPRERAAGT22122
42Prince AroraUPRERAAGT24742
43Prince GoelUPRERAAGT22160
44PROP- KEYS CONSULTING PRIVATE LIMITEDUPRERAAGT23188
45RAJEEV CHHABRAUPRERAAGT10522
46RAJU KUMARUPRERAAGT24403
47RAMAN KUNDRAUPRERAAGT24797
48Rashmi Y KumarUPRERAAGT15194
49RAVIKANT DUBEYUPRERAAGT21762
50Roushan GuptaUPRERAAGT21785
51SANJAY KUMAR SIROHI C/O SIROHI ESTATESUPRERAAGT12885
52SAURAV CHAUHANUPRERAAGT24120
53Saurav SharmaUPRERAAGT19648
54Shubham SoniUPRERAAGT23479
55SOMIT SHARMAUPRERAAGT16099
56star estateUPRERAAGT10202
57SUNIL KUMARUPRERAAGT18923
58SUNIL KUMARUPRERAAGT20964
59Tripti GuptaUPRERAAGT16848
60TRUSTNEST PROPERTY CONSULTANTS LLPUPRERAAGT15462
61URBAN AVENUES LLPUPRERAAGT10834
62Vikas bhatiUPRERAAGT24482
63VIPIN KUMAR SINGHUPRERAAGT23912
64VISHAL SHARMAUPRERAAGT18511
65WHITE KNIGHTS REALTY PRIVATE LIMITEDUPRERAAGT20816
66YOGESH BIDANIUPRERAAGT14624
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 10 Apr 2028. 1 of them carries a revalidation, valid to 7 Aug 2030.

Sanctioned by Noida Authority · 46,205 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
Noida/CAP/2023/8287/IV-1552/47411 Apr 202310 Apr 202810 Apr 203310 Apr 2028—
Noida/CAP/2023/8287/IV-1552/47411 Apr 202310 Apr 20287 Aug 203510 Apr 202811 Apr 2023
valid to 7 Aug 2030
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
0146205Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 223
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · Request for uploading Floor Plans in Land Section
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Approved Floor Plans (Commercial)
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Approved Floor Plans (Residential)
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New11 Apr 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New11 Apr 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New11 Apr 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New11 Apr 2023 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New11 Apr 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New11 Apr 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New11 Apr 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New11 Apr 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New11 Apr 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New26 Apr 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New26 Apr 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New11 Apr 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New11 Apr 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New26 Apr 2023 ↗

Quarterly progress reports

13 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

13 quarterly progress reports are on file with UPRERA, covering 2023-Q1 to 2026-Q1.

QuarterConstructionCertificates
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q240%CA ↗ · Arch ↗ · Eng ↗
2025-Q345%CA ↗ · Arch ↗ · Eng ↗
2025-Q450%CA ↗ · Arch ↗ · Eng ↗
2026-Q155%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLavish Buildmart Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM221722
PANAABCL3285G
CIN / TANRTKLO1924G
Name of chairmanMr. Vijay Kumar Aggarwal
Registered address41st Floor, Tower-1, M3M International Financial Center, Sector-66, Badshahpur, Gurgaon, Badshahpur, Haryana, India, 122101
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
LBPL COLLECTION A/C FOR M3M THE CULLINANBankICICI BANK LTD.BranchSECTOR 18 NOIDABranch addressK1, SENIOR MALL, SECTOR 18 NOIDA UTTAR PRADESH, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
LBPL SEPARATE A/C FOR M3M THE CULLINANBankICICI BANK LTD.BranchSECTOR 18 NOIDABranch addressK1, SENIOR MALL, SECTOR 18 NOIDA UTTAR PRADESH 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
LBPL TRANSACTION A/C FOR M3M THE CULLINANBankICICI BANK LTD.BranchSECTOR 18 NOIDABranch addressK1, SENIOR MALL, SECTOR 18 NOIDA UTTAR PRADESH 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Filed document
viewprojects · 17
Other
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 16
ENGINEERS CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 15
ARCHITECT CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 14
CA CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 13
Affidavit (Form-B)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 12
Development Work Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 11
Electricity Supply Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 10
Water Supply Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 9
Waste Disposal Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 8
Proforma of Completion Certificate(Occupancy)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 7
Proforma of Conveyance Deed
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 6
Proforma of Allotment Letter
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 5
Proforma of Application Form
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 4
Other Plan(If Any)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 3
Commencement Certificate
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 2
Details of Encumbrances
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 1
Other
newly filed with RERA
18 Oct 2026
Filed document
summary · 20
Details of Encumbrances
no longer on the record
18 Oct 2026
Filed document
summary · 19
Commencement Certificate
no longer on the record
18 Oct 2026
Filed document
summary · 18
Other Plan(If Any)
no longer on the record
18 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 16 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about M3M The Cullinan

Is M3M The Cullinan RERA registered?

Yes. M3M The Cullinan is registered with UPRERA under registration number UPRERAPRJ442214, registered on 2 Jun 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for M3M The Cullinan?

The completion date filed with UPRERA is 10 Apr 2028. No completion certificate is on record yet.

Who is the builder of M3M The Cullinan?

Lavish Buildmart Pvt. Ltd. is the promoter entity that filed M3M The Cullinan with UPRERA (promoter RERA ID UPRERAPRM221722). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does M3M The Cullinan have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is M3M The Cullinan located?

M3M The Cullinan is registered in Gautam Budh Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗