M3M The Cullinan II

UPRERARegistered

M3M The Cullinan II is a RERA-registered mixed project by Lavish Buildmart Pvt. Ltd. in Sector 94, Gautam Budh Nagar (RERA ID UPRERAPRJ794824). Registered with a completion deadline of 31 Jul 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
2.14%Q3'25
3.17%Q4'25
4.49%Q1'26
5.07%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ794824
Project categoryMixed
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Aug 2025
Project duration60 months
AddressPlot No. 1, Sector 94, NOIDA-201301, Sector 94, Gautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address41st Floor, Tower-1, M3M International Financial Center, Sector-66, Badshahpur, Gurgaon, Badshahpur, Haryana, India, 122101
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    CAP/Online 12672

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered3 Oct 2025
Original completion31 Jul 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹51,750
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors— · 4 · 47 (from plan)
ConfigurationUnitsCarpet area
OTHER—963
4 BHK—215-371
SHOP—3-212
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Emporium · SHOP5—3-212
Tower C2 · OTHER, 4 BHK40—216-371
Tower D1 (Trump Tower) · OTHER, 4 BHK46—215-277
Tower D2 (Trump Tower) · OTHER, 4 BHK46—215-277
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.No unit total is shown: the plan's flat-count column contradicts this project's other filings.The plan also files 1,518.57 m² for a SHOP, far outside the rest of that type, so the ranges above leave it out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Vishal Sharma
License CA/1998/23261
Confluence B-521, New Friends Colony, New Delhi - 110065
Engineer
Mr Pankish Goel
Technical Projects Consultants Ltd, B-74, Sec 57, Noida, UP
Contractor
Lavish Buildmart Pvt. Ltd
6th Floor, M3M Tee Point, North Block, Sector 65, Gurugram Haryana- 122101
Sr.Development work declared to RERA
1Demarcation of Plots
Number of plots- 1 No, Size per plot- 52035 Sqm, total area demarcated, method of demarcation, survey accuracy- As per site plan and possession plan.
2Boundary Wall
Length- 930 Mtr, height- 1.5 Mtr, material used, type (brick, RCC, fencing) - RCC and Brick, appearance - As per Elevation, safety features - CCTV
3Road Work
Total road Length - 861.30 Rmt., and width - 9 Mtr, number of lanes - 2 Way, type of pavement - RCC, drainage, surface durability - As per Fire Tender Movement.
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
Connections -1 No, Tank capacity - Domestic water tank - For Residential 360 KLD and for Commercial 500 KLD, Fire Water Tank- 1155 KLD, Hydrants - Yes Provided, Source of Water - Municipal water supply, water treatment method - Water Treatment using dual media and activated carbon filters, Compliance with quality standards- Yes
6Sewer System
Length of sewer lines - Pipes are running in basement ceiling by gravity, pipe size - 160 mm dia, Manholes type (gravity/pressure) - provision of manholes has not been proposed as the pipe is running in basement at ceiling level by gravity, Network design - Piping network.
7Drain
Length - 585 mtrs, Width - 500 mm dia (Dia of pipe), Number of open/covered drains, type (storm/surface)- storm water system is planned using pipe system, Pipe Material - SN4, Disposal method - using rainwater harvesting and external drains.
8Parks
NA
9Tree Planting
Number of trees - 236 Nos , type/species-2 type, spacing- 5 mtr, native/exotic trees - Native Trees, maintenance Plan- Yes.
10Design For Electric Supply Including Street Lighting
Number of External poles/lights - Approx. 45 Nos, Transformer units - 7 Nos, Type of lighting (LED/solar) - LED, Illumination design - Yes as per norms.
11Community Buildings
Proposed as per 4th Floor Plan.
12Treatment and Disposal System of Sewage and Sullage water
STP capacity (KLD) - 1190 KLD, Number of treatment units - 1 No , type of STP - SBR, Treated water use - Flushing, horticulture and HVAC cooling tower, Regulatory compliance - Yes As per norms.
13Solid Waste Management And Disposal System
Waste generated (Kg/Day) - 4932 Kg/day
14Water Conservation System
Number and size of harvesting pits - 13 Nos. of 65 m3 capacity each, recharge wells - Yes Provided, Water - efficient fixtures - considered low flow sanitary fixtures, Reuse/recharge strategy - rain water will be used for ground water recharge, system efficiency - As per Norms.
15Energy Management System Including Use of Renewable Energy
Online Solar power system of capacity 318 KWp.
16Fire Protection And Fire Safety System
Number of hydrants - 20 Nos. (External), more than 100 Hydrants internal, Sprinklers, system type (manual/automatic)- Automatic , NBC compliance - Yes, fire safety training- will be provided at the time of occupancy.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
19 Nos, road widths - 9.0 Mtr., signage count - yes, route plan- Yes, safety measures - Yes, public awareness system - Yes
19Other Miscellaneous Work
Beautification efforts, signage, aesthetic and utility elements CCTV proposed as per project requirements
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 7 Aug 2030.

Sanctioned by Noida Authority · 5,830 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
CAP/Online 126728 Aug 20257 Aug 20307 Aug 203531 Jul 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No. 1, Sector 94, Noida5830Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 223
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New10 Aug 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New10 Aug 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New10 Aug 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New10 Aug 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New19 Aug 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New19 Aug 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New19 Aug 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New19 Aug 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New10 Aug 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New18 Sept 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New17 Sept 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Sept 2025 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New19 Aug 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New10 Aug 2025 ↗

Quarterly progress reports

5 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

5 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q2.

QuarterConstructionCertificates
2025-Q22.14%CA ↗ · Arch ↗ · Eng ↗
2025-Q33.17%CA ↗ · Arch ↗ · Eng ↗
2025-Q44.49%CA ↗ · Arch ↗ · Eng ↗
2026-Q15.07%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLavish Buildmart Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM221722
PANAABCL3285G
CIN / TANRTKLO1924G
Name of chairmanMr. Vijay Kumar Aggarwal
Registered address41st Floor, Tower-1, M3M International Financial Center, Sector-66, Badshahpur, Gurgaon, Badshahpur, Haryana, India, 122101
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
LBPL COLLECTION A/C FOR M3M THE CULLINAN-IIBankICICI BANK LIMITEDBranchNoida Sector-18, BranchBranch addressK1, Senior mall, Sec 18, Noida, Uttar Pradesh, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031Branch emailbhardwaj.puneet@icicibank.com/ ravikant.tiwari@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
LBPL SEPARATE BANK A/C FOR M3M THE CULLINAN-IIBankICICI BANK LIMITEDBranchNoida Sector- 18, BranchBranch addressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
LBPL RERA TRANSACTION A/C FOR M3M THE CULLINAN-IIBankICICI BANK LIMITEDBranchNoida Sector - 18, BranchBranch addressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0000031
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Filed document
viewprojects · 20
Proforma of Agreement for Sale
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 19
Other
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 18
ENGINEERS CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 17
ARCHITECT CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 16
CA CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 15
Affidavit (Form-B)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 14
Development Work Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 13
Electricity Supply Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 12
Water Supply Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 11
Waste Disposal Plan
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 10
Proforma of Conveyance Deed
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 9
Proforma of Allotment Letter
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 8
Proforma of Application Form
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 7
Other Plan(If Any)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 6
Commencement Certificate
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 5
Details of Encumbrances
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 4
CA CERTIFICATE
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 3
Proforma of Completion Certificate(Occupancy)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 2
Other Plan(If Any)
newly filed with RERA
18 Oct 2026
Filed document
viewprojects · 1
Other Plan(If Any)
newly filed with RERA
18 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 16 Aug 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about M3M The Cullinan II

Is M3M The Cullinan II RERA registered?

Yes. M3M The Cullinan II is registered with UPRERA under registration number UPRERAPRJ794824, registered on 3 Oct 2025. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for M3M The Cullinan II?

The completion date filed with UPRERA is 31 Jul 2030. No completion certificate is on record yet.

Who is the builder of M3M The Cullinan II?

Lavish Buildmart Pvt. Ltd. is the promoter entity that filed M3M The Cullinan II with UPRERA (promoter RERA ID UPRERAPRM221722). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does M3M The Cullinan II have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is M3M The Cullinan II located?

M3M The Cullinan II is registered in Sector 94, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in M3M The Cullinan II?

The unit plan filed with UPRERA lists OTHER, 4 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in M3M The Cullinan II?

The approved unit plan filed with UPRERA runs from 3 to 963 m² of carpet area (about 36 to 10,366 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗