DURGA RESIDENCY 2

UPRERARegistered

DURGA RESIDENCY 2 is a RERA-registered residential project by SUN BRIGHT PROPTECH PRIVATE LIMITED in KATHA (RERA ID UPRERAPRJ563736). Registered with a completion deadline of 4 Feb 2031.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ563736
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryBaghpat-baraut-khekra development Authority
Proposed start1 Apr 2026
Project duration59 months
AddressKHASRA NO 1889, 1892,1894,1894A, 1894M,1880,MOZA KATHA TAHSIL KHEKRA, DISTT BAGHPAT, KATHA, Khekra
TehsilKhekra
Applicant typeCompany
Applicant addressWS-F23, COWORK DELHI, 101, PRATAP NAGAR, MAYUR VIHAR, PHASE 1, EAST DELHI-110091
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    BBKDA/LD/25-26/0083

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Jul 2026
Original completion4 Feb 2031
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,16,500
Sanctioning authorityBaghpat-baraut-khekra development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SHIVANI DEVI
License CA/14/63442
RANA JI ARCHITECT -PUNCH SHEEL COLONY GALI NO 2 MEERUT ROAD BAGHPAT
Engineer
VINEET JAIN
PLOT NO 127 1ST FLOOR SHAKTI KHAND 4 INDIRAPURAM GHAZIABAD
Contractor
SUN BRIGHT PROPTECH PVT LTD
WS-F23 CO WORK DELHI 101 PRATAP NAGAR MAYUR VIHAR PH-1 DELHI
Sr.Development work declared to RERA
1Demarcation of Plots
SITE LOCATED AT KHASRA NO. 1889,1892,1894,1894A,1894M,1880, MOZA KHATA, TAHSIL KHEKRA, DIST. BAGHPAT, U.P.
2Boundary Wall
2.1 METER HIGH BOUNDARY WALL WITH RCC COLUMN AND BRICK WALL . THE BOUNDARY WALL SHALL BE EARTHQUAKE RESISTANT.
3Road Work
12 METER WIDE ENTRY ROAD WITH CONNECTED 9M WIDE ROAD.ALL ROADS INTHE PROJECT WILL IN COMBINATION OF CC AND INTERLOCKING OF DIFFERENT SHAPE , THICKNESWS. ROADS WILL BE LAID STONE BALLAST 40-63 MM GAUGE STONE BALLAST 25-50 MM GAUGE
4Footpaths
ALL FOOTPATH IN THE PROJECT WILL INTERLOCKING OF DIFFERENCE SHAPE, THICKNESS. ROADS WILL BE LAID STONE BALLAST 40-63 MM GAUGE , STONE BALLAST 25-50 MM GAUGE.
5Water Supply Including Drinking Water Facilities
U.G.T WATER TANK LOCATION PROVIDING IN PARK -3 WITH 340KL CAPACITY WILL BE UTILIZATION FOR WATER.
6Sewer System
270 KLD CAPACITY STP WITH ALL MANHOLE OF SEWER LENGTH 10 METER TO 64 METER WITH DIA 200 MM. SLOP 100 TO 250. DEPTH 1.6 METER TO 3METER .
7Drain
ALL DRAIN CONNECT WITH CATCH PIT (SIZE-250MM TO 400 MM), AND MAINTAIN SLOP 300 TO 600 MM (1IN) AND DIA OF DRAIN 250 MM TO 400 MM ,AND SOME PLACE BRICK MASONARY OPEN SURFACE DRAINS.
8Parks
PROPOSED GREEN AREA IN THE PROJECT IS 7072.71 SQ.MT. PARK -1 AREA 2844.55 SQMTR , PARK -2 AREA 1226.25 SQMTR , PARK -3 AREA 520.46 SQMTR , AND PARK 4 AREA 2481.45 SQMTR.
9Tree Planting
THE TREES WILL BE PLANTED AT ALL SUITABLE LOCATIONS OF THE PORJECT AND ALONG THE BOUNDRY WALLS. THE TREE SELECTION FLORA AND VEGITAITON SHALL BE AS PER THE CLIMATIC CONDITIONS. TREES WILL BE PLANTED IN A MANNER TO ENSURE THAT THERE IS NO HINDRANCE IN THE SERVICES/ USGAGE OF THE PROJECT.
10Design For Electric Supply Including Street Lighting
400 KVA -4 TRANFERMERS SHALL BE USED ALONG WITH NECESSARY SWITCH -GEAR FOR DISTRIBUTING ELECTRICITY AT LT VOLTAGE. ALL STREET /LANDSCAPE LIGHTING SHALL BE LED BASED.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
STP PIPE LINE SHALL BE PROVIDED, LAYING OF SEWER AND MAIN HOLE PROVIDE AND FIXING OF NP-3 RCC PIPE
13Solid Waste Management And Disposal System
MANUAL COLLECTION SHALL BE PROVIDED IN THE PROJECT
14Water Conservation System
Nos-4 RAIN WATER HARVESTING FACILITIES SHALL BE PROVIDED AS PER SANCTION PLAN
15Energy Management System Including Use of Renewable Energy
DESIGNED HAS BEEN DONE AS PER UP ELECTRICITY BOARD GUIDELINES AND SHALL BE PROVIDED NECESSARY SWITCH GEAR ETC.
16Fire Protection And Fire Safety System
FIRE TENDER PATH AND FIRE EQUIPMENT SHALL BE PROVIDE AS PER NBC GUIDELINE.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
FIRE TENDER PATH SHALL BE PROVIDED AS PER NBC GUIDELINE.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 4 Feb 2031.

Sanctioned by Baghpat-baraut-khekra development Authority · 42,223 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
BBKDA/LD/25-26/00835 Feb 20264 Feb 20314 Feb 20344 Feb 2031
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

31 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1894A3340Khasra
18943163Khasra
18945030Khasra
18943163Khasra
18941130Khasra
1894790.83Khasra
18802810Khasra
1894A1690Khasra
1894M1130Khasra
1894791Khasra
1894M995Khasra
18941582Khasra
18927990Khasra
18927990Khasra
18894976Khasra
1894M843Khasra
1894M422Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 517
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1443
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 165
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 410
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1656
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 243
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3109
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1925
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 166
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3015
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1412-1417
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1412-1417
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1412-1417
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1412-1417
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Registry document · 202600737001052
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · KHASRA DETAILS
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1412-1417
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New16 Jun 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New16 Jun 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New16 Jun 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New16 Jun 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New16 Jun 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New16 Jun 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New16 Jun 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New16 Jun 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New16 Jun 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New16 Jun 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New16 Jun 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New16 Jun 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New16 Jun 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New16 Jun 2026 ↗

Quarterly progress reports

1 filed report

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

1 quarterly progress report is on file with UPRERA, for 2026-Q2.

QuarterConstructionCertificates
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSUN BRIGHT PROPTECH PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM448095
PANAACCJ4107A
CIN / TANDELS92395C
Name of chairmanANKUR AGGARWAL
Registered addressWS-F23, COWORK DELHI, 101, PRATAP NAGAR, MAYUR VIHAR, PHASE 1, EAST DELHI-110091
RERA contact
Registered since2026
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameLAND RUSH ESTATE INDIA PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressWS-F37, COWORK DELHI,101, STREET NO. 15, KHUDI RAM BOSE MARG, PRATAP NAGAR, MAYUR VIHAR PHASE 1 , DELHI-110091
RERA contact

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S SBPTPL RERA COLLECTION A/C DURGA RESI 2BankHDFC BANK LTDBranchHDFC BANK LTD BAGHPAT BRANCH CODE-1949Branch addressHDFC BANK LTD, GAYATRI PURAM PLOT NO. 257 DELHI ROAD , BAGHPAT UTTAR PRADESH 250609Branch districtBagpat, Uttar PradeshA/C no.IFSCHDFC 0001949Branch emailnitin.singhal3@hdfc.bank.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S SBPTPL RERA SEPARATE A/C DURGA RESI 2BankHDFC BANK LTDBranchHDFC BANK LTD, BAGHPAT , BRANCH CODE-1949Branch addressHDFC BANK LTD, GAYATRI PURAM , PLOT NO. 257 DELHI ROAD, BAGHPAT -UTTAR PRADESH-250609Branch districtBagpat, Uttar PradeshA/C no.IFSCHDFC0001949
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S SBPTPL RERA TRANSACTION A/C DURGA RESI 2BankHDFC BANK LTDBranchHDFC BANK LTD, BAGHPAT , BRANCH CODE- 1949Branch addressHDFC BANK LTD, GAYATRI PURAM, PLOT NO. 257 DELHI ROAD, BAGHPAT -UTTAR PRADESH 250609Branch districtBagpat, Uttar PradeshA/C no.IFSCHDFC0001949
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about DURGA RESIDENCY 2

Is DURGA RESIDENCY 2 RERA registered?

Yes. DURGA RESIDENCY 2 is registered with UPRERA under registration number UPRERAPRJ563736, registered on 28 Jul 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for DURGA RESIDENCY 2?

The completion date filed with UPRERA is 4 Feb 2031. No completion certificate is on record yet.

Who is the builder of DURGA RESIDENCY 2?

SUN BRIGHT PROPTECH PRIVATE LIMITED is the promoter entity that filed DURGA RESIDENCY 2 with UPRERA (promoter RERA ID UPRERAPRM448095). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does DURGA RESIDENCY 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗