Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad

UPRERARegistered

Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad is a RERA-registered residential project by U.P. Awas Evam Vikas Parishad in Ghaziabad (RERA ID UPRERAPRJ388116). Registered with a completion deadline of 1 Jan 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
0%Q3'25
0%Q4'25
0%Q1'26
6.18%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ388116
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Jan 2024
Project duration61 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompetent authority
Applicant address104 Mahatma Gandhi Marg, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (2)

  2. 3 building permits sanctioned

  3. Registered with RERA

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered7 Nov 2023
Original completion1 Jan 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹7,28,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Arvind Deo Arya Architect Planner
License CA/97/22345
Architect Planner, Unit-5 UP Awas Evam Vikas Parishad Lucknow
Engineer
Faraz Aslam Executive Engineer
CD Baghpat-01, UP Awas Evam Vikas Parishad Mandola Vihar Yojna Ghaziabad
Contractor
Faraz Aslam Executive Engineer
CD Baghpat-01, UP Awas Evam Vikas Parishad Mandola Vihar Yojna Ghaziabad
Sr.Development work declared to RERA
1Demarcation of Plots
Demarcation of plots will be done As per Approved Layout Plan.
2Boundary Wall
No Provision of Boundary Wall in the sector.
3Road Work
Bituminous Trunk Roads in Mandola Vihar Yojna are already Constructed. Internal Roads of sector-23 of 9.0 m and 12.0 m are proposed which will be constructed by UPAVP as per design and Parishad Specification.
4Footpaths
As per Road Specification of UPAVP.
5Water Supply Including Drinking Water Facilities
Water supply will be provided by different type and dia of pipes as per approved design by UPAVP in which PVC pipe will be provided. Water supply will be given by Over Head Tank which will be constructed by UPAVP in the sector as per design and Specification.
6Sewer System
For sewerage system Internal Sewer line of RCC NP3 pipe of dia 250mm, 300mm, 400mm will be laid as per design approved by the competent Authority of UPAVP. Treatment of sewege will be done in proposed STP in sector-3 of Yojna.
7Drain
Internal Storm water drain type (CK,C1,C2) will be provided as per design approved by the competent Authority of UPAVP.
8Parks
Parks will be provided as per approved layout plan. The park will be provided with approved design boundary in which Tree/Plant shall be planted.
9Tree Planting
Different types of Plants will be planted in parks and other areas as per UPAVP specification.
10Design For Electric Supply Including Street Lighting
Electrification work and street light work will be done by UPAVP as per design and drawing approved by competent Authority UPAVP. Steel Tubular pole will be used for connecting Electric Supply wire from transformer to plots. For the purpose of street lightening LED Bulbs will be installed on poles at proper spacing. Electricity supply line will be handed over to UP Power Corporation after completion and testing of line.
11Community Buildings
No Provision of Community Building
12Treatment and Disposal System of Sewage and Sullage water
Treatment of sewage will be done by proposed STP to be constructed in sector 3 Mandola Vihar Yojna, Ghaziabad.
13Solid Waste Management And Disposal System
Parishad vehicals will collect the solid waste and transport to the disposal center for the further process.
14Water Conservation System
N/A
15Energy Management System Including Use of Renewable Energy
N/A
16Fire Protection And Fire Safety System
N/A
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per approved layout plan
18Emergency Evacuation Services
N/A
19Other Miscellaneous Work
N/A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 24 Jul 2027. 2 of them carry a revalidation.

Sanctioned by U.P. Awas Evam Vikas Parishad · 1,44,600 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
1853/APD/U-5/Sec-23/MVYG/23, Date 25.07.202325 Jul 202224 Jul 202731 Jan 20311 Jan 2029—
185325 Jul 202224 Jul 20271 Jan 20291 Jan 202925 Jul 2022
185325 Jul 202224 Jul 20271 Jan 20291 Jan 202925 Jul 2022
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

44 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
248165320Khasra
248218150Khasra
24833630Khasra
248421260Khasra
248511190Khasra
24861300Khasra
248736080Khasra
25102660Khasra
251125070Khasra
2512M300Khasra
2513M1300Khasra
2520M560Khasra
2521M18000Khasra
2522M1700Khasra
2527M9610Khasra
252845750Khasra
25292870Khasra
2534630Khasra
253518530Khasra
2536890Khasra
253717160Khasra
25383290Khasra
2Part200Khasra
33Part5020Khasra
33/340140Khasra
35/34470Khasra
34Part10120Khasra
61Part510Khasra
62Part510Khasra
2530 to 253352010Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1421-1426, 1426-1431
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New5 Oct 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Oct 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Oct 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New5 Oct 2023 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New5 Oct 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New28 Oct 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New5 Oct 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New28 Oct 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Oct 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Oct 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New5 Oct 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Oct 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Oct 2023 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2023-Q4 to 2026-Q1.

QuarterConstructionCertificates
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q20%CA ↗ · Arch ↗ · Eng ↗
2025-Q30%CA ↗ · Arch ↗ · Eng ↗
2025-Q40%CA ↗ · Arch ↗ · Eng ↗
2026-Q16.18%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameU.P. Awas Evam Vikas Parishad
RolePromoter · current
RERA IDUPRERAPRM4243
PANAAAJU0103A
CIN / TANLKNU05017F
Registered address104 Mahatma Gandhi Marg, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
UPAVP Collection Account for 608 Nos Different Type Plots in Sector-23 of Mandola Vihar Yojna, GhaziabadBankSBI BankBranchSME BranchBranch addressNavyug Market, Ghaziabad-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCSBIN0009298
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
UPAVP-Separate Account for 6098 Nos Different Type Plots in Sector-23 of Mandola Vihar Yojna, GhaziabadBankSBI BankBranchSME BranchBranch addressNavyug Market, Ghaziabad-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCSBIN0009298
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
UPAVP-RERA Transaction for 608 Nos Different Type Plots in Sector-23 of Mandola Vihar Yojna, GhaziabadBankSBI BankBranchSME BranchBranch addressNavyug Market Ghaziabad-201001Branch districtGhaziabad, Uttar PradeshA/C no.IFSCSBIN0009298
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

20 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)761 (Under Registration - 10 ) → 762 (Under Registration - 11 )
changed in Estanzo’s record
19 Oct 2026
Promoter’s complaints tally (all their projects)760 (Under Registration - 9 ) → 761 (Under Registration - 10 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)759 (Under Registration - 8 ) → 760 (Under Registration - 9 )
changed in Estanzo’s record
15 Oct 2026
Permit paperwork
3 · Project Specifications
Project Specifications
newly filed with RERA
15 Oct 2026
Permit paperwork
3 · Approved Map
Approved Map
newly filed with RERA
15 Oct 2026
Permit paperwork
3 · Sanctioned Letter
Sanctioned Letter
newly filed with RERA
15 Oct 2026
Permit paperwork
3 · Approved Layout
Approved Layout
newly filed with RERA
15 Oct 2026
Permit paperwork
2 · Project Specifications
Project Specifications
newly filed with RERA
15 Oct 2026
Permit paperwork
2 · Approved Map
Approved Map
newly filed with RERA
15 Oct 2026
Permit paperwork
2 · Sanctioned Letter
Sanctioned Letter
newly filed with RERA
15 Oct 2026
Permit paperwork
2 · Approved Layout
Approved Layout
newly filed with RERA
15 Oct 2026
Sanctioning permit
no. 3
1853
newly filed with RERA
15 Oct 2026
Sanctioning permit
no. 2
1853
newly filed with RERA
15 Oct 2026
Promoter’s complaints tally (all their projects)758 (Under Registration - 7 ) → 759 (Under Registration - 8 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)757 (Under Registration - 6 ) → 758 (Under Registration - 7 )
changed in Estanzo’s record
9 Oct 2026
Promoter’s complaints tally (all their projects)755 (Under Registration - 4 ) → 757 (Under Registration - 6 )
changed in Estanzo’s record
7 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 2 ) → 755 (Under Registration - 4 )
changed in Estanzo’s record
5 Oct 2026
Promoter’s complaints tally (all their projects)753 (Under Registration - 6 ) → 753 (Under Registration - 2 )
changed in Estanzo’s record
1 Oct 2026
Promoter’s complaints tally (all their projects)752 (Under Registration - 5 ) → 753 (Under Registration - 6 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)751 (Under Registration - 4 ) → 752 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 19 Oct 2026 · 14 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad

Is Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad RERA registered?

Yes. Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad is registered with UPRERA under registration number UPRERAPRJ388116, registered on 7 Nov 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad?

The completion date filed with UPRERA is 1 Jan 2029. No completion certificate is on record yet.

Who is the builder of Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad?

U.P. Awas Evam Vikas Parishad is the promoter entity that filed Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad with UPRERA (promoter RERA ID UPRERAPRM4243). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad located?

Residential Plots 608 Numbers of Different Types in Sector-23, Mandola Vihar Yojna, Ghaziabad is registered in Ghaziabad, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗