Eros Sampoornam 2

UPRERARegistered

Eros Sampoornam 2 is a RERA-registered residential project by AJAY ENTERPRISES PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ301564). Registered with a completion deadline of 29 Oct 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
77.63%Q3'25
88.59%Q4'25
94.39%Q1'26
100%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ301564
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Feb 2020
Project duration81 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address8TH FLOOR, EROS CORPORATE TOWER, NEHRU PLACE, NEW DELHI-110019
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    PLG/(BP)2420/4075

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

    “Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026”

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered25 Nov 2021
Original completion30 Sept 2025
Revised completion29 Oct 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹73,000
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors378 · 6 · 17 (units from plan)
  • 3 BHK206 54%
  • 2 BHK172 46%
ConfigurationUnitsCarpet area
3 BHK20673-99
2 BHK17249-62
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A3 · OTHER, 3 BHK176097-99
B4 · OTHER, 3 BHK165686-86
G7 · OTHER, 3 BHK179073-79
H3 · OTHER, 2 BHK176049-62
Y12 · OTHER, 2 BHK165649-62
Y15 · OTHER, 2 BHK165649-62
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Vaibhav Jain
License CA/2006/38172
195, Ram Vihar, Delhi, 110092
Engineer
Manish Kumar Gupta
F-19, Ground Floor, South City 2, Gurugram, 122002
Contractor
Vipin Arora, Director, representing M/s Arora Construction Co. Pvt. Ltd.
5-E/10, Bunglow/Plot, N.I.T. Faridabad, Haryana
Sr.Development work declared to RERA
1Demarcation of Plots
Plot number - GH 01, Sector 02, Greater Noida (West), Gautam Buddha Nagar, Total Plot area = 98373.75 square meters, Current project plot area = 13534 square meters
2Boundary Wall
2.1 meters high boundary wall with 450 mm high brick and plaster wall and above 1650 mm high mild steel grill between two R.C.C. columns approximately 4.5 meters centre to centre. The boundary wall shall be earthquake resistant.
3Road Work
All roads in the complex will be in combination of concrete pavers of different colours, shape, thickness. Roads will be laid over 225 mm water bound macadam.
4Footpaths
All footpaths in the complex will be in combination of concrete pavers of different colours, shape and thickness of 65 mm and 80 mm laid over 150 mm water bound macadam.
5Water Supply Including Drinking Water Facilities
Potable water supply from Greater Noida Authority shall be collected in underground collection tank and pumped to overhead water tanks (6 numbers) located at the top floor terrace of total capacity of 148 KL. The supply of water to individual flats shall be from the said overhead water tanks.
6Sewer System
The sewage will be collected through a soil pipeline arrangements, bends and inspection chambers leading to the sewage water treatment plant (STP) of the Project, from where the sewage will be used for irrigation and flushing purpose after necessary treatment.
7Drain
Rain water shall be collected in drains having a maximum width of 150 mm connected to the underground cement concrete pipeline. For discharge, water will be collected in man holes to be constructed in periphery of complex. And these man holes are connected with ground water recharge pits. Over flow water will be connected with drain of Greater Noida Authority.
8Parks
Lush green internal park will be provided and maintained. The parks will have joggings tracks, pavilion, children play area and sitting areas.
9Tree Planting
The trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.
10Design For Electric Supply Including Street Lighting
Electricity supply provided through 33/0.415 KV transformers and by DG set supply for backup. External street lighting shall be through solar power with alternate supply through grid.
11Community Buildings
Not Applicable
12Treatment and Disposal System of Sewage and Sullage water
Sewage shall be treated in Sewage Treatment Plant (STP) and thereafter treated water to be used for flushing and irrigation.
13Solid Waste Management And Disposal System
Solid waste to be collected from individual flats and stored in garbage room in the basement. Recyclable waste shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through the vendors approved by Greater Noida Authority.
14Water Conservation System
Rain water harvesting pits shall be provided for ground water recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.
15Energy Management System Including Use of Renewable Energy
Solar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/power supply company.
16Fire Protection And Fire Safety System
Fire fighting system shall be provided for all buildings as per the prevailing requirements of National Building Code. Sprinkler shall be provided in all common areas, basement and inside the individual apartments. Smoke detectors, fire doors shall be provided in common areas. Water supply to sprinklers and hydrants shall be from fire pumps located in the basement.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Common social infrastructure shall be provided for all the phases combined.
18Emergency Evacuation Services
Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

16 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ANAROCK Property Consultants Private LimitedUPRERAAGT10265
2BHIM SINGHUPRERAAGT16878
3Dinesh UtkalUPRERAAGT19889
4GAURAV KUMARUPRERAAGT20874
5INVESTOR HOMEZUPRERAAGT15046
6Kanchan SharmaUPRERAAGT14683
7Kasif aliUPRERAAGT21439
8M/S HOME SQUARE CONSULTANTUPRERAAGT16396
9Manoj KumarUPRERAAGT21383
10muskan realtorsUPRERAAGT10510
11PROPZONE INFRATECHUPRERAAGT10285
12Rajat MohanUPRERAAGT19620
13SANG INFRATECH PVT. LTD.UPRERAAGT10024
14subodh kumarUPRERAAGT16327
15VARUN KUMAR SHUKLAUPRERAAGT14388
16YOGENDER VERMAUPRERAAGT20966
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 23 Jun 2023. 1 of them carries a revalidation, valid to 23 Jun 2028.

Sanctioned by Greater Noida Authority · 13,534 sqm of land · an approved plan of 6 blocks and 378 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
PLG/(BP)2420/407525 Jun 201823 Jun 202323 Jun 202830 Sept 2025—
PLG/(BP)2420/407525 Jun 201823 Jun 202323 Jun 202830 Sept 202525 Jun 2018
valid to 23 Jun 2028
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 29 Oct 2026.

#Granted fromExtended uptoNote
130 Sept 202529 Oct 2026—
230 Jun 202629 Oct 2026Extension of validity on account of Force Majeure as per MoHUA advisory dated 31-07-2026

Land & documents

14 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-0198373.75Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · BAHI NO. 1, JILD No. 6436, PAGE NO. 281 - 314, SERIAL NO. 11308
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New14 Oct 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New14 Oct 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New14 Oct 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New14 Oct 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New14 Oct 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New14 Oct 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New14 Oct 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New14 Oct 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New3 Nov 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New14 Oct 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New3 Nov 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New14 Oct 2021 ↗

Quarterly progress reports

25 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q277.63%CA ↗ · Arch ↗ · Eng ↗
2025-Q388.59%CA ↗ · Arch ↗ · Eng ↗
2025-Q494.39%CA ↗ · Arch ↗ · Eng ↗
2026-Q1100%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameAJAY ENTERPRISES PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM68534
PANAAACA1967D
CIN / TANU74899DL1968PTC004914
Name of chairmanRAMAN KUMAR SOOD
Registered address8TH FLOOR, EROS CORPORATE TOWER, NEHRU PLACE, NEW DELHI-110019
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Ajay Enterprises Pvt. Ltd. Collection A/c Eros Sampoornam 2BankState Bank of IndiaBranchNoida Main Branch, Sector 2, NoidaBranch addressB-138, B Block, Sector 2, Noida, Gautam Buddha Nagar - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCSBIN0005936Branch emailsbi.05936(at the rate)sbi.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Ajay Enterprises Pvt. Ltd. Separate Bank A/c Eros Sampoornam 2BankState Bank of IndiaBranchNoida Main Branch, Sector 2, NoidaBranch addressB-138, B Block, Sector 2, Noida, Gautam Buddha Nagar - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCSBIN0005936Branch emailsbi.05936(at the rate)sbi.co.in
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Ajay Enterprises Pvt. Ltd. RERA Transaction A/c Eros Sampoornam 2BankState Bank of IndiaBranchNoida Main Branch, Sector 2, NoidaBranch addressB-138, B Block, Sector 2, Noida, Gautam Buddha Nagar - 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCSBIN0005936Branch emailsbi.05936(at the rate)sbi.co.in
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

5 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Revised completion date on file2026-10-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 2 — extended upto
2026-10-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Completion extension
no. 1 — extended upto
2026-06-30 → 2026-10-29
changed in Estanzo’s record
7 Sept 2026
Revised completion date on file2026-06-30 → 2026-10-30
changed in Estanzo’s record
5 Sept 2026
Completion extension
no. 2
extension 2 to 2026-10-30
newly filed with RERA
5 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 7 Sept 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Eros Sampoornam 2

Is Eros Sampoornam 2 RERA registered?

Yes. Eros Sampoornam 2 is registered with UPRERA under registration number UPRERAPRJ301564, registered on 25 Nov 2021. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Eros Sampoornam 2?

The completion date filed with UPRERA is 29 Oct 2026. No completion certificate is on record yet.

Who is the builder of Eros Sampoornam 2?

AJAY ENTERPRISES PRIVATE LIMITED is the promoter entity that filed Eros Sampoornam 2 with UPRERA (promoter RERA ID UPRERAPRM68534). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Eros Sampoornam 2 more time to complete?

UPRERA's record carries 2 completion extensions for Eros Sampoornam 2, the latest running to 29 Oct 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Eros Sampoornam 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Eros Sampoornam 2 located?

Eros Sampoornam 2 is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Eros Sampoornam 2?

The unit plan filed with UPRERA lists OTHER, 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Eros Sampoornam 2?

The approved unit plan filed with UPRERA runs from 49 to 99 m² of carpet area (about 532 to 1,069 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Eros Sampoornam 2?

The approved unit plan describes 6 blocks and 378 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Eros Sampoornam 2?

About 113 units per acre: 378 planned units across 3.34 acres (13,534 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗