Express One

UPRERARegistered

Express One is a RERA-registered residential project by SOLID PROPERTIES PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ981693). Registered with a completion deadline of 23 Dec 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
116%Q3'25
122%Q4'25
100%Q1'26
100%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ981693
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start26 Jun 2019
Project duration90 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressRegistered Office Address- 810, Surya Kiran Building 19, Kasturba Gandhi Marg, Connaught Place, New Delhi-110001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    1514/NE.PRA.-58/2019/VA.NE.-5

  2. 2 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered24 Sept 2019
Original completion24 Jun 2025
Revised completion23 Dec 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹39,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors385 · 4 · 28 (units from plan)
Homes · commercial units352 · 33 (shops and offices filed in the same plan)
  • 2 BHK216 56%
  • 3 BHK108 28%
  • SHOP33 9%
  • OTHER28 7%
ConfigurationUnitsCarpet area
3 BHK10881-95
2 BHK21665-66
SHOP335-13
OTHER288-32
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 3 BHK2710881-95
B · 2 BHK2710865-66
C · 2 BHK2710865-66
Commercial · SHOP, OTHER1615-32
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Shashank Sharma
License CA/97/22034
C-17, Basement, Anand Niketan, New Delhi
Engineer
Dr. Maqsud E Nazar
G-70, 2nd Floor, Jaswant Plaza, Near Kalindi kunj, Main Sarita Vihar, Shaheen Bagh, Okhla,New Delhi-25
Contractor
Solid Properties Pvt. Ltd.
810, Surya Kiran Building, 19 Kasturba Gandhi Marg, New Delhi- 110001
Sr.Development work declared to RERA
1Demarcation of Plots
Total Plot Area- 6826.5 sqm  N- 18m wide road , S- 15m wide road, E- 9m wide Road, W- 9m wide road
2Boundary Wall
Yes, Masonary and Railing Boundary wall
3Road Work
Yes, RCC Trimix/Interlocking block Road with intermittent Tile/Stone Paving.
4Footpaths
No
5Water Supply Including Drinking Water Facilities
Yes, Ghaziabad Municipal water supply system in Under Ground Water reservoirs . Terrace Tanks, filled with pumps.
6Sewer System
Yes, RCC hume pipe  with Manhole ,Chambers and Collection chamber and connections with sewer System.
7Drain
Yes, RCC hume pipe  with Manhole ,Chambers and Collection chamber with Rain Water Harvesting .
8Parks
Yes, landscape with civil work with masonary and stone, horticulture work and various types of plantation, shrubs.
9Tree Planting
Yes, Tree planting as per approved Map.
10Design For Electric Supply Including Street Lighting
As Per Approved Layout
11Community Buildings
Yes, with Banquet, Gym and Indoor Game facilities
12Treatment and Disposal System of Sewage and Sullage water
S.T.P. and through Corporation Sewerage System
13Solid Waste Management And Disposal System
Yes, Organic Waste Convertor, Collection Bins
14Water Conservation System
Yes, Rain Water Harvesting Pits
15Energy Management System Including Use of Renewable Energy
Some Solar Energy Lights in Common Areas and External Areas
16Fire Protection And Fire Safety System
Diesel Pump- 1 no. Electrical Pump for Hydrant -1 no.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Proper Water supply and Sanitary facilities at one point in the project
18Emergency Evacuation Services
Yes, Refuse Area provided at Every Towers on 18th Floor in addition to Fire Staircase
19Other Miscellaneous Work
Yes, Guard Room, Entrance and exit gates, commercial facilities.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 24 Jun 2024. 1 of them carries a revalidation, valid to 25 Jun 2027.

Sanctioned by U.P. Awas Evam Vikas Parishad · 6,827 sqm of land · an approved plan of 4 blocks and 385 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
1514/NE.PRA.-58/2019/VA.NE.-525 Jun 201924 Jun 202424 Jun 202724 Jun 2025—
1514/NE.PRA.-58/2019/VA.NE.-525 Jun 201924 Jun 202423 Mar 203123 Dec 202525 Jun 2019
valid to 25 Jun 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 23 Dec 2026.

#Granted fromExtended uptoNote
124 Jun 202523 Dec 2025Six months extension in view of force majeure caused by covid-19 pandemic
223 Dec 202523 Dec 2026—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
14/Com-26827Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 6477
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · Conversion Letter No.7695
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 20640
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New22 Aug 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New7 Aug 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New7 Aug 2019 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New22 Aug 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New7 Aug 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New7 Aug 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New7 Aug 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New7 Aug 2019 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New20 Aug 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New5 Mar 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New5 Mar 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Mar 2020 ↗

Quarterly progress reports

26 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

26 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2116%CA ↗ · Arch ↗ · Eng ↗
2025-Q3122%CA ↗ · Arch ↗ · Eng ↗
2025-Q4100%CA ↗ · Arch ↗ · Eng ↗
2026-Q1100%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSOLID PROPERTIES PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM90138
PANAAACS3162N
CIN / TANU74899DL1988PTC033108
Name of chairmanSH.VINAY GOEL
Registered addressRegistered Office Address- 810, Surya Kiran Building 19, Kasturba Gandhi Marg, Connaught Place, New Delhi-110001
RERA contact
Registered since2019
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Solid Properties Private Limited-express One Collection A/cBankKotak Mahindra Bank LimitedBranchGhaziabad - IndirapuramBranch addressAG-11,12,38,39 & 40 Ground Floor, Aditya City Center Indirapuram, Ghaziabad, Up-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCKKBK0005289Branch email05289_ghaziabadindirapuram_referral@kotak.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Solid Properties Private Limited-express One Rera A/cBankKotak Mahindra Bank LimitedBranchGhaziabad - IndirapuramBranch addressAG-11,12,38,39 & 40 Ground Floor, Aditya City Center Indirapuram, Ghaziabad, Up-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCKKBK0005289Branch email05289_ghaziabadindirapuram_referral@kotak.com
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Solid Properties Private Limited Express One Cre Sub Escrow A/cBankKotak Mahindra Bank LimitedBranchGhaziabad - IndirapuramBranch addressAG-11,12,38,39 & 40 Ground Floor, Aditya City Center Indirapuram, Ghaziabad, Up-201014Branch districtGhaziabad, Uttar PradeshA/C no.IFSCKKBK0005289Branch email05289_ghaziabadindirapuram_referral@kotak.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

7 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
18 Oct 2026
Quarterly progress report
2026-Q1
QPR 2026-Q1
newly filed with RERA
1 Oct 2026
Quarterly progress report
2025-Q4 — engineer certificate
- → https://www.up-rera.in/ViewDocument?Param=PRJ2064026092026084414514Engineerscertificate.pdf
changed in Estanzo’s record
27 Sept 2026
Quarterly progress report
2025-Q4 — architect certificate
- → https://www.up-rera.in/ViewDocument?Param=PRJ2064026092026084356439ArchitectCertificate.pdf
changed in Estanzo’s record
27 Sept 2026
Quarterly progress report
2025-Q4 — construction reported
- → 100
changed in Estanzo’s record
27 Sept 2026
Revised completion date on file2025-12-23 → 2026-12-23
changed in Estanzo’s record
23 Sept 2026
Completion extension
no. 2
extension 2 to 2026-12-23
newly filed with RERA
23 Sept 2026
When these facts last moved
Revised completion date on filechanged in Estanzo’s record · 23 Sept 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Express One

Is Express One RERA registered?

Yes. Express One is registered with UPRERA under registration number UPRERAPRJ981693, registered on 24 Sept 2019. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Express One?

The completion date filed with UPRERA is 23 Dec 2026. No completion certificate is on record yet.

Who is the builder of Express One?

SOLID PROPERTIES PRIVATE LIMITED is the promoter entity that filed Express One with UPRERA (promoter RERA ID UPRERAPRM90138). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Express One more time to complete?

UPRERA's record carries 2 completion extensions for Express One, the latest running to 23 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Express One have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Express One located?

Express One is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Express One?

The unit plan filed with UPRERA lists 3 BHK, 2 BHK, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Express One?

The approved unit plan filed with UPRERA runs from 5 to 95 m² of carpet area (about 54 to 1,025 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Express One?

The approved unit plan describes 4 blocks and 385 units of which 352 are homes and 33 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Express One?

About 228 units per acre: 385 planned units across 1.69 acres (6,827 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗