Express One34 is a RERA-registered commercial project by Expressway Hospitality Private Limited in Bajidpur, Sector 134, Gautam Budh Nagar (RERA ID UPRERAPRJ816123). Registered with a completion deadline of 23 Jul 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ816123
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Apr 2026
Project duration52 months
AddressPlot No. 5A5B, Block No. P, Sector 134, Noida, UP, Bajidpur, Sector 134, Dadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompany
Applicant address325, Jagriti Enclave, East Delhi 110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2025/03/25/12192

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered21 Apr 2026
Original completion23 Jul 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,36,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors140 · 2 · 6 (units from plan)
Homes · commercial units0 · 140 (shops and offices filed in the same plan)
  • Office Space76 54%
  • SHOP64 46%
ConfigurationUnitsCarpet area
Office Space7625-42
SHOP640-46
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BANQUET BLOCK · Office Space56625-27
SUPPORT FACILITY · Office Space, SHOP4740-46
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 2,578.93 m² for a Office Space, 790.08 m² for a Office Space, 357.51 m² for a Office Space and 3 other units like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Mr. Balraj Singh
License CA/2005/37210
65, Regal Building, Connaught Place, New Delhi - 110001
Engineer
Mr. Ashwini Kapoor
65, Regal Building, Connaught Place, New Delhi - 110001
Contractor
Express Hospitality Pvt. Ltd.
325, Jagriti Enclave, East Delhi, Delhi-110092
Sr.Development work declared to RERA
1Demarcation of Plots
As per lease plan
2Boundary Wall
2.1m high boundary wall. Consists of finished brickwork up to 1.5m. Form 1.5m to 2.1m, is constructed out of MS members.
3Road Work
6 m wide internal R.C.C roads with vacuum dewatering treatment at top.
4Footpaths
Combination of greens and stone pavers as per landscape consultant.
5Water Supply Including Drinking Water Facilities
An underground storage reservoir is used to collect the municipal water supply. Water must also be stored underground as a reserve for combating fires. Static storage for fire fighting is suggested in accordance with NBCs current needs. Water will overflow into the storage chamber for domestic use in order to avoid the water in the static storage tank becoming stagnant. Static storage would always be available for fire fighting thanks to this technology . One day of storage for the entire amount of water needed is suggested. it is suggested that the terrace be used for overhead storage tanks. According to the National Building Code, static storage would also be used for fire fighting. (1) Commercial Building - Fire tank -100 KL, Raw/ Domestic - 70KL (2) Banquet Hall - Fire tank - 370 KL, Raw/ Domestic 100KL
6Sewer System
Under the basement ceiling, a single network of sewer pipes will collect soil and waste from the kitchen and toilets. It is proposed that a sewage treatment plant be built on the property to handle sewage. Length of sewer line 310M, Size of Sewer pipe - 200 mm Dia
7Drain
The buildings terraces and balconies are planned to be drained by down take pipes, while open areas and roadways would be drained through drains. These drains are designed to be oriented along the Complex s roads in accordance with the landscape design. The down take pipes from terraces and balconies would discharge into or over an inlet to the complex s surface drains. The drains will be emptied into the municipal drainage system after passing via rainwater gathering and groundwater recharge devices. Length of Drain line 375 M, Size of Drain pipe - 250 mm Dia.
8Parks
Landscaping of the parks with plantation including water features , evergreen trees, shrubs and ground covers with benches and walkways.
9Tree Planting
As per landscape consultant
10Design For Electric Supply Including Street Lighting
The State Electricity Board will provide power to the building. Due to the sources instability caused by frequent brownouts and blackouts, it is suggested that complete DG power backup to be offered. Certain essential loads, including emergency lighting and powered equipment of the ELV system, will require supplementary support through a UPS (Battery backup) system. lllumination for streets, parking lots, landscaped areas, and walkways (both shaded and open ) will be managed by a static timer for energy conservation. LEDs should be utilized in all shared spaces and outdoor lighting to decrease energy usage . No of Lighting Pole - 25 No Transformer - 3 No. Type of light - LED
11Community Buildings
A wedding venue including dedicated banquet - related spaces such as ceremonial halls, pre-function/foyer area, outdoor lawns , pool deck , resting rooms for the guests , service areas, catering kitchen, and supporting amenities for hosting large and small community functions. Also there is a proposal for a dedicated complex for various support facilities such as coffee shops, restaurants etc.
12Treatment and Disposal System of Sewage and Sullage water
The installation of a sewage treatment plant is suggested for the site manage sewage treatment. The amount of recycled water needed for flushing and horticulture must be treated to a tertiary level, and the remaining waste shall be released into the municipal drainage system following treatment. STP Capacities - 50KLD for Commercial and 100 KLD for Banquet
13Solid Waste Management And Disposal System
Segregation of soild waste
14Water Conservation System
a. Pumps will be operated using level sensors to prevent water waste and unnecessary equipment operation. b. Pumps and equipment will be selected based on their best energy efficiency. c. Water conservation measures will be implemented, including low flow fixtures and flow restrictors. d. Dual- flush flushing cisterns will save water. Water consumption in dual flush will be a maximum of 3 litres for low flush and 6 litres for high flush. e. Sensor-based urinals will be installed to ensure that flushing occurs only when needed, thereby reducing water consumption. f. A sewage treatment plant is proposed to treat all waste generated. g. Recycling treated effluent reduces the project s total net fresh water demand. This reduces dependence on municipal supply. h. Irrigation system management will be provided by providing the most recent irrigation system, such as sprinkler systems, time-based controllers, water metering, and so on , in order to reduce horticultural water consumption. i. Rainwater harvesting and groundwater recharge for both roof and non-roof areas are available. The total volumetric capacity of recharge structures must be as specified by the regulations. j. Water metering will be provided for landscape water consumption , treated waste water consumption, swimming pool and fountain consumption, and hot water consumption via the solar system, k. Irrigation system management will be provided the most recent irrigation systems, such as sprinkler systems, time based controllers, water metering, and so on , in order to reduce horticultural water consumption.
15Energy Management System Including Use of Renewable Energy
UPPCL Power Supply ( Transformer of 1 into800 KVA +2into 1250 KVA) and Backup Power thru DG Set (750 KVA +2 into1010 KVA+1 into500 KVA ) Solar PV capacity (1percent of Demand load) 5 KWP for Commercial and 16 KWP for banquet
16Fire Protection And Fire Safety System
Building will comprise of fire fighting system and fire alarm as per NCR guidelines and UP fire Department. No of Hydrant - 35 No. Fire Pumps- 4 No. ( 2 SETS ) UG tank 100 KL + 370 KL
17Social Infrastructure And Other Public Amenities Including Public Health Services
Provided 63 shops with 10 offices in support facility and 60 resting rooms for the guests in banquet complex for user convenience.
18Emergency Evacuation Services
Provided landscaped lawn at Ground and Terrace.
19Other Miscellaneous Work
Work based on the nature of work ( example No of CCTV units, benches), beautification efforts, signage , aesthetic and utility elements. CCTV proposed as per project requirement.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 23 Jul 2030.

Sanctioned by Noida Authority · 12,580 sqm of land · an approved plan of 2 blocks and 140 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2025/03/25/1219224 Jul 202523 Jul 203023 Jun 203523 Jul 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
5A and 5B, Block No. P, Sector 134, Noida12580Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4229
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 4228
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Allotment letter from the authority · Possession Letter and NDC
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Plot No. 5A and 5B Merger Letter
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New21 Feb 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New27 Jan 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New27 Jan 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New27 Jan 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New11 Mar 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New11 Mar 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New11 Mar 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New11 Mar 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New27 Jan 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New27 Jan 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Feb 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Feb 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New27 Jan 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New20 Apr 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2026-Q1 to 2026-Q2.

QuarterConstructionCertificates
2026-Q11.1%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameExpressway Hospitality Private Limited
RolePromoter · current
RERA IDUPRERAPRM435499
PANAACCC9706A
CIN / TANDELE10468D
Name of chairmanYukti Nagpal
Registered address325, Jagriti Enclave, East Delhi 110092
RERA contact
Registered since2026
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Expressway Hospitality Private Limited Collection A/c For Express One34BankICICI Bank LtdBranchSector- 137, NoidaBranch address104, Plot No GH-07A, Gulshan Vivante, Sector-137, Noida, U.P-201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0003451Branch emailhimanshu.punj@icicibank.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Expressway Hospitality Private Limited Separate Bank A/c For Express One34BankICICI Bank LtdBranchSector-137, NoidaBranch address104, Plot No GH-07A, Gulshan Vivante, Sector-137, Noida, U.P.- 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCICIC0003451
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Expressway Hospitality Private Limited RERA Transaction A/c For Express One34BankICICI Bank LtdBranchSector-137, NoidaBranch address104, Plot No GH-07A, Gulshan Vivante, Sector-137, Noida, U.P.-201301Branch districtGhaziabad, Uttar PradeshA/C no.IFSCICIC0003451
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

1 movement

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
21 Oct 2026
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Express One34

Is Express One34 RERA registered?

Yes. Express One34 is registered with UPRERA under registration number UPRERAPRJ816123, registered on 21 Apr 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Express One34?

The completion date filed with UPRERA is 23 Jul 2030. No completion certificate is on record yet.

Who is the builder of Express One34?

Expressway Hospitality Private Limited is the promoter entity that filed Express One34 with UPRERA (promoter RERA ID UPRERAPRM435499). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Express One34 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Express One34 located?

Express One34 is registered in Bajidpur, Sector 134, Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Express One34?

The unit plan filed with UPRERA lists Office Space and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Express One34?

The approved unit plan filed with UPRERA runs from 25 to 46 m² of carpet area (about 273 to 495 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Express One34?

The approved unit plan describes 2 blocks and 140 units of which 0 are homes and 140 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Express One34?

About 45 units per acre: 140 planned units across 3.11 acres (12,580 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗