Gallantt Anandam is a RERA-registered residential project by Gallantt Ispat Limited in Bargdwa, Gorakhpur (RERA ID UPRERAPRJ171376). Registered with a completion deadline of 30 Sept 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ171376 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Gorakhpur Development Authority |
| Proposed start | 1 Jun 2023 |
| Project duration | 28 months |
| Address | mauza- bargdwa, village- Bargdwa, Post- fertilizer Town, District- Gorakhpur, Bargdwa, Gorakhpur, Gorakhpur |
| Tehsil | Gorakhpur |
| Applicant type | Company |
| Applicant address | AL-5, SECTOR-23, GIDA, Sahjanwan, Gorakhpur, Uttar Pradesh, 273209 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
104/2024
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 13 Aug 2025 |
| Original completion | 30 Sept 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 4 Feb 2026 |
| Registration fee | ₹59,000 |
| Sanctioning authority | Gorakhpur Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Proper Demarcation of plots with brickwork |
| 2 | Boundary Wall 230 mm/115mm thick boundary wall already made |
| 3 | Road Work 9.00 Meter and 7.5 meter road already completed |
| 4 | Footpaths 1.0 meter footpath both side |
| 5 | Water Supply Including Drinking Water Facilities pump including underground pipelines for all plots |
| 6 | Sewer System Modular sewer system along with STP shall be provided |
| 7 | Drain Storm water, rain Water harvesting and Ground water recharge system shall be provided |
| 8 | Parks The park area shall be developed as per Sanctioned Drawings and as per UP Building Byelaws and Kids Play area shall be also provided |
| 9 | Tree Planting 80 Nos. of tree shall be planted as per sanctioned plan |
| 10 | Design For Electric Supply Including Street Lighting 220 KV Substation if required, 33KV HT VCB panel, CSS, LT cable, Earthing, 33/11 KV transformer, HT LT cable, Electrical panel and street lighting shall be provided |
| 11 | Community Buildings Not Applicable |
| 12 | Treatment and Disposal System of Sewage and Sullage water STP shall be provided |
| 13 | Solid Waste Management And Disposal System Garbage collection area shall be provided for solid waste management |
| 14 | Water Conservation System Rain water harvesting shall be provided |
| 15 | Energy Management System Including Use of Renewable Energy Solar street lights shall be provided |
| 16 | Fire Protection And Fire Safety System All fire protection system shall be provided in common areas. The project is residential / plotted development |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Drinking water facility shall be provided for common use. |
| 18 | Emergency Evacuation Services shall be provided in case of emergency |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 30 Sept 2025.
Sanctioned by Gorakhpur Development Authority · 10,798 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 104/2024 | 22 Apr 2025 | 30 Sept 2025 | 21 Apr 2027 | 30 Sept 2025 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 149 | 630 | Khasra |
| 149 | 1255 | Khasra |
| 150, 151 | 1214 | Khasra |
| 149 | 630 | Khasra |
| 147, 152 | 3491 | Khasra |
| 142MI | 2671 | Khasra |
| 148 | 1250 | Khasra |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 4469 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2765 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 2695 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 666 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4089 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1526 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8588 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Allotment letter from the authority · 164/2007 The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · COMPLETION APPLICATION TO GDA The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 23 Jun 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 23 Jun 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 23 Jun 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 25 Jun 2025 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 23 Jun 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 25 Jun 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 23 Jun 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 23 Jun 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 23 Jun 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 23 Jun 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 20 Jul 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 25 Jun 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 25 Jun 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 25 Jun 2025 ↗ |
Quarterly progress reports
1 filed report
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
1 quarterly progress report is on file with UPRERA, for 2025-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Gallantt Ispat Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM370268 |
| PAN | AACCG2934J |
| CIN / TAN | L27109DL2005PLC350524 |
| Name of chairman | Chandra Prakash Agrawal |
| Registered address | AL-5, SECTOR-23, GIDA, Sahjanwan, Gorakhpur, Uttar Pradesh, 273209 |
| RERA contact | |
| Registered since | 2025 |
Nearby projects
Gorakhpur
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | GIL Collection Acc for Gallantt AnandamBankHDFC BANK LimitedBranchPrahlad Rai Trade Centre , Bank Road, GorakhpurBranch addressPrahlad Rai Trade Centre, Bank Road, GorakhpurBranch districtGorakhpurA/C no.IFSCHDFC0000284Branch emaildeepakmahendra.kumar@hdfcbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | GIL Separate Bank Ac for Gallant AnandamBankHDFC Bank LimitedBranchBank Road, GorakhpurBranch addressPrahlad Rai Trade Centre, Bank Road, GorakhpurBranch districtGorakhpur, Uttar PradeshA/C no.IFSC50200110384534 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | GIL RERA Trans Ac for Gallantt AnandamBankHDFC Bank LimitedBranchBank Road, GorakhpurBranch addressPrahlad Rai Trade Centre, Bank Road , GorakhpurBranch districtGorakhpur, Uttar PradeshA/C no.IFSCHDFC0000284 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Gallantt Anandam
Is Gallantt Anandam RERA registered?
Yes. Gallantt Anandam is registered with UPRERA under registration number UPRERAPRJ171376, registered on 13 Aug 2025. Estanzo reproduces that filing; it does not verify the work behind it.
Has Gallantt Anandam been completed?
UPRERA still lists Gallantt Anandam as Registered, so it is not shown as completed here. A completion certificate dated 4 Feb 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Gallantt Anandam?
Gallantt Ispat Limited is the promoter entity that filed Gallantt Anandam with UPRERA (promoter RERA ID UPRERAPRM370268). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does Gallantt Anandam have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Gallantt Anandam located?
Gallantt Anandam is registered in Bargdwa, Gorakhpur, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗