Garden Bay Villa Phase 1 Extension is a RERA-registered residential project by M/s Shalimar KSMB Projects in Lucknow (RERA ID UPRERAPRJ994333). Registered with a completion deadline of 14 Jun 2023.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ994333 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 15 Dec 2020 |
| Project duration | 30 months |
| Address | Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Partnership Firm |
| Applicant address | Titanium Block Shalimar Corporate Park Vibhuti Khand Gomti Nagar Lucknow |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
MAP-20180618162722810
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 22 Dec 2020 |
| Original completion | 15 Dec 2022 |
| Revised completion | 14 Jun 2023 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 19 Dec 2023 |
| Registration fee | ₹36,000 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots This is single plot polygon shaped, having total 1 no. of entry gate and 1 no. of exit gate from the 18m wide front road and 9m internal road, Site is surrounded by other plots from west side. |
| 2 | Boundary Wall 3.0-3.6 m high and 200 mm thick boundary wall designed. Brick work of 9 inches and RCC work in column and beam may be used as per the design. MS Broad entrance and exit gates are developed with boundary. |
| 3 | Road Work Concrete road with bituminous Cover/ high quality concrete pavers will be used as per design surrounded by the Architect for Internal road. |
| 4 | Footpaths All internal road will have narrow footpath cement stone pavers or equivalent finishes. |
| 5 | Water Supply Including Drinking Water Facilities Ground water will be used, Also end user shall use their individual RO System as per their requirement. Overheads tanks shall be provided on building terrace for distribution through gravity. |
| 6 | Sewer System Centralized sewerage system shall be provided. All sewerage water shall go to the STP for treatment and after treatment water shall be recycled and it will be used in gardening, flush tanks and vehicle washing, overflow from the STP shall be connected with the Municiple Sewerage system. |
| 7 | Drain Storm water system shall be provided. Storm water from roads and other landscape area shall connect to the storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall be connected with Municipal drain line. |
| 8 | Parks There is one lush green park and green areas along the plot, play area for childrens and for different recreational activities. |
| 9 | Tree Planting There are 5 type of trees provided in site which are Kachnar, Gulmauhar, Amaltas, Kusum and Neem |
| 10 | Design For Electric Supply Including Street Lighting We have designed the system as per local electricity biard and consider centralized Transformer, HT Panel, LT Panel, Feeder Pillar and DG back for service like Electrical Lighting, STP, Pump Room etc |
| 11 | Community Buildings NA (Community building already exist in township) |
| 12 | Treatment and Disposal System of Sewage and Sullage water Centralized sewerage system shall be provided. All sewerage water shall go to the STP for treatment. After treatment water shall be recycle and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal Sewerage System. |
| 13 | Solid Waste Management And Disposal System There are a proper garbage collection area provided for the solid waste management. |
| 14 | Water Conservation System A well designed rain water harvesting system shall be provided for the whole villa complex to conserve water. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights fitting in external area as well as solar lights. In STP and Pump room, all the equipment shall have energy efficient motor. 25 Percent of Terrace is covered with Solar Votaic Panels to provide Renewable source of energy for common areas in complex. |
| 16 | Fire Protection And Fire Safety System All the fire norms shall be followed as per NBC and approval of fire department. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Sewerage, Storm water and water supply system shall be provided. we have proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks. All sewerage shall be go to the STP for recycling the water. Storm water for Roof, Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting pit for recharge the Ground water and overflow shall be connect with Municiple drain. |
| 18 | Emergency Evacuation Services Not Applicable |
| 19 | Other Miscellaneous Work Luxurious main entrance, angadwadi and convenience store along side of community center for day to day small purchasings, lush green shurbs at every vacant space on ground. |
Registered agents
27 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | 360 REALTORS LLP | UPRERAAGT10868 |
| 2 | Abhishek Kumar | UPRERAAGT17780 |
| 3 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 4 | ANIL KUMAR VERMA | UPRERAAGT14346 |
| 5 | ARVIND KUMAR | UPRERAAGT15927 |
| 6 | ASA FINCAP ADVISORS LLP | UPRERAAGT10926 |
| 7 | BAJRANG MISHRA C/O BASE INFRA SOLUTION | UPRERAAGT13635 |
| 8 | BASECAMP INFRA CONSULTANTS (OPC) PRIVATE LIMITED | UPRERAAGT14759 |
| 9 | CHANDRA PRAKASH SAXENA | UPRERAAGT11046 |
| 10 | CITYMAX PROPMART PRIVATE LIMITED | UPRERAAGT13792 |
| 11 | Karshni Buildwell Pvt Ltd | UPRERAAGT11401 |
| 12 | MOHAMMAD RASHID | UPRERAAGT15251 |
| 13 | Mukesh kumar Sharma | UPRERAAGT11494 |
| 14 | RAM KUMAR YADAV | UPRERAAGT13784 |
| 15 | REALTYSTRUCTURE INFRATECH PRIVATE LIMITED | UPRERAAGT10144 |
| 16 | Rohit Chandani | UPRERAAGT11546 |
| 17 | SANJEEV KUMAR BANKA | UPRERAAGT10894 |
| 18 | Saurabh Gupta | UPRERAAGT14655 |
| 19 | Shashank Shukla | UPRERAAGT17091 |
| 20 | SHINU GUPTA | UPRERAAGT18762 |
| 21 | SINAN REALTY LLP | UPRERAAGT11785 |
| 22 | SQUARE YARDS CONSULTING PRIVATE LIMITED | UPRERAAGT10119 |
| 23 | STRAIGHTEDGE REAL ESTATE PRIVATE LIMITED | UPRERAAGT10067 |
| 24 | VINAY KUMAR SINGH | UPRERAAGT11226 |
| 25 | VISHESH SRIVASTAVA | UPRERAAGT11416 |
| 26 | VIVEK ARORA | UPRERAAGT15945 |
| 27 | VIVEK VERMA | UPRERAAGT18719 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 6 Mar 2024.
Sanctioned by Lucknow Development Authority · 6,157 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| MAP-20180618162722810 | 7 Mar 2019 | 6 Mar 2024 | 6 Mar 2027 | 15 Dec 2022 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 14 Jun 2023.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 15 Dec 2022 | 14 Jun 2023 | — |
Land & documents
15 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| Khasra No. 23, Village- Alinagar and Khasra No.-200, Village- Ghaila | 6156.61 | Khasra |
| Registry document · 410 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · Reply against objections received An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Sale deed · 7228 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17909 The registered deed by which the promoter bought the land. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 6 Nov 2020 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 25 Nov 2020 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 4 Nov 2020 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 4 Nov 2020 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 4 Nov 2020 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 4 Nov 2020 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 5 Nov 2020 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 5 Nov 2020 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Nov 2020 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 21 Dec 2020 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 5 Nov 2020 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 5 Nov 2020 ↗ |
Quarterly progress reports
13 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
13 quarterly progress reports are on file with UPRERA, covering 2020-Q3 to 2023-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | M/s Shalimar KSMB Projects |
| Role | Promoter · current |
| RERA ID | UPRERAPRM10366 |
| PAN | ACFFS5832H |
| CIN / TAN | LKNS11272C |
| Registered address | Titanium Block Shalimar Corporate Park Vibhuti Khand Gomti Nagar Lucknow |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | Shalimar KSMB Projects- RERA Designated Account for Garden Bay Villa Phase- ExtensionBankOriental Bank of CommerceBranchVivek Khand Gomti NagarA/C no.IFSCORBC0100687 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Garden Bay Villa Phase 1 Extension
Is Garden Bay Villa Phase 1 Extension RERA registered?
Yes. Garden Bay Villa Phase 1 Extension is registered with UPRERA under registration number UPRERAPRJ994333, registered on 22 Dec 2020. Estanzo reproduces that filing; it does not verify the work behind it.
Has Garden Bay Villa Phase 1 Extension been completed?
UPRERA still lists Garden Bay Villa Phase 1 Extension as Registered, so it is not shown as completed here. A completion certificate dated 19 Dec 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of Garden Bay Villa Phase 1 Extension?
M/s Shalimar KSMB Projects is the promoter entity that filed Garden Bay Villa Phase 1 Extension with UPRERA (promoter RERA ID UPRERAPRM10366). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Garden Bay Villa Phase 1 Extension more time to complete?
UPRERA's record carries 1 completion extension for Garden Bay Villa Phase 1 Extension, the latest running to 14 Jun 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Garden Bay Villa Phase 1 Extension have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Garden Bay Villa Phase 1 Extension located?
Garden Bay Villa Phase 1 Extension is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗