GH-1 Grand Omaxe LINCOLN A and B is a RERA-registered residential project by Omaxe Limited in Lucknow (RERA ID UPRERAPRJ624607). Registered with a completion deadline of 28 Feb 2030.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ624607 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Jan 2025 |
| Project duration | 62 months |
| Address | Omaxe Integrated Township at Sultanpur Road , Lucknow , UP, Lucknow, Lucknow, Lucknow |
| Tehsil | Lucknow |
| Applicant type | Company |
| Applicant address | SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
- valid to
Permit revalidated
Group Housing/14188/LDA/BP/24-25/2254/06122024
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 10 May 2025 |
| Original completion | 28 Feb 2030 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹35,500 |
| Sanctioning authority | Lucknow Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK90 92%
- SHOP8 8%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 90 | 92-119 |
| SHOP | 8 | 13-14 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| Lincoln A · 3 BHK | 23 | 45 | 92-119 |
| Lincoln B · 3 BHK | 23 | 45 | 92-119 |
| Shopping Block · SHOP | 1 | 8 | 13-14 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of Project to be done at site. |
| 2 | Boundary Wall Boundary wall will be constructed by Brick Work / MS Railing as designed by promoter. |
| 3 | Road Work Internal drive way 6 mtr wide, will be developed by RCC / Interlocking pavers / Bitumen as per approved layout, as designed by promoter. |
| 4 | Footpaths Both side of road , Footpath will be developed, width1.0 to 1.5 mtr. as designed by promoter. |
| 5 | Water Supply Including Drinking Water Facilities Water supply including drinking water facilities will be provided by Promoter through Roof tank / Bore well. |
| 6 | Sewer System Common S.T.P. will be constructed for GH-1 , at site for Sewer Disposal. |
| 7 | Drain Drainage system will be developed and connected with RWH a nd over flow will be connected with Existing Drains. |
| 8 | Parks Common Parks /Green area approx 5000 sqm will be developed in Gh-1 . And will be developed as per approved plan and requirement. |
| 9 | Tree Planting Required Tree approx 225 nos , will be planted in GH-1 within parks , road side and boundary , as per norms. |
| 10 | Design For Electric Supply Including Street Lighting Electric supply will be provided from ESS. Street Lights will be fixed at road berms as per design. |
| 11 | Community Buildings Common Community Building as per approved layout, will be provided for GH-1. |
| 12 | Treatment and Disposal System of Sewage and Sullage water S.T.P. will be constructed for GH-1, and treated water will be use in irrigation of green areas and as per govt. norms. |
| 13 | Solid Waste Management And Disposal System Solid Waste management and disposal system will be provided as Govt. Norms . |
| 14 | Water Conservation System Water Conservation System will be provided as per Govt. Norms. |
| 15 | Energy Management System Including Use of Renewable Energy Energy Management System will be provided as per Govt. Norms. |
| 16 | Fire Protection And Fire Safety System Fire Safety System will be provided as per approval , Design and norms. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services As per Norms. |
| 19 | Other Miscellaneous Work As per Specification finalize in the approved map all works will be developed. |
Registered agents
7 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | ABHISHEK KUMAR SINGH | UPRERAAGT15288 |
| 2 | GAUTAM ASSOCIATES | UPRERAAGT11617 |
| 3 | MONISHA BUDHRAJA | UPRERAAGT16694 |
| 4 | Purvanchal Buildhome | UPRERAAGT10883 |
| 5 | VELOCITY DEVELOPERS | UPRERAAGT10813 |
| 6 | VINAY KUMAR SINGH | UPRERAAGT11226 |
| 7 | VIRENDRA KUMAR DEWAN | UPRERAAGT13205 |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 18 Mar 2029. 1 of them carries a revalidation, valid to 18 Mar 2032.
Sanctioned by Lucknow Development Authority · 6,100 sqm of land · an approved plan of 3 blocks and 98 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| Group Housing /14188/LDA/BP/24-25/2254/06122024 | 20 Dec 2024 | 18 Mar 2029 | 17 Mar 2032 | 28 Feb 2030 | — | |
| Group Housing/14188/LDA/BP/24-25/2254/06122024 | 20 Dec 2024 | 18 Mar 2029 | 18 Mar 2035 | 28 Feb 2030 | 20 Dec 2024 valid to 18 Mar 2032 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
20 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 408 | 7098.18 | Khasra |
| Sale deed · 197 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1426-1431 (01/07/2018 to 30/06/2024) An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 314 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 18 Apr 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 28 Feb 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 28 Feb 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 16 Apr 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 28 Feb 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 28 Feb 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 28 Feb 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 28 Feb 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 16 Apr 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 31 Mar 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 16 Apr 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 18 Apr 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 28 Feb 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 28 Feb 2025 ↗ |
Quarterly progress reports
6 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
6 quarterly progress reports are on file with UPRERA, covering 2024-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 0% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 1.6% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 3.6% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 3.6% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Omaxe Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM2386 |
| PAN | AAACO0171H |
| CIN / TAN | DELO01861G |
| Name of chairman | Mr. Rohtash Goel |
| Registered address | SHOP No-19-B, FIRST FLOOR, OMAXE CELEBRATION MALL, SOHNA ROAD, GURGAON-122001 |
| RERA contact | |
| Registered since | 2017 |
| Legal name | ADVAITA PROPERTIES PRIVATE LIMITED |
| Role | Co-promoter |
| Applicant type | Company |
| Address | INDIA TRADE TOWER , 1ST FLOOR , BADDI KURALI ROAD , NEW CHANDIGARH,MULLANPUR, DISST .SAS NAGAR , MULLANPUR, MOHALI, ROPAR, PUNJAB, INDIA, 140901 |
| RERA contact |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | OMAXE LTD COLL A/C GH-1 LINCOLN A & BBankHDFC BANKBranchHDFC BANK, INDIRA NAGAR, LUCKNOWBranch address176,HDFC BANK, No.2/4C, INDIRA NAGAR , Lucknow - 226016, LUCKNOWBranch districtLucknowA/C no.IFSCHDFC0009176Branch emailruchi.aggarwal@hdfcbank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | OMAXE LTD SEPARATE BANK A/C GH-1 LINCOLN A and BBankHDFC BANKBranchHDFC BANK, INDIRA NAGAR, LUCKNOWBranch address176, HDFC BANK, No. 2/4C, INDIRA NAGAR, Lucknow- 226016, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0009176 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | OMAXE LTD TRANSACTION A/C GH-1 LINCOLN A and BBankHDFC BANKBranchHDFC BANK , INDIRA NAGAR, LUCKNOWBranch address176,HDFC BANK, No. 2/4C, INDIRA NAGAR, LUCKNOW-226016, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCHDFC0009176 |
What has changed on this record
5 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 224 (Under Registration - 4 ) → 225 (Under Registration - 4 ) changed in Estanzo’s record | 18 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 224 (Under Registration - 5 ) → 224 (Under Registration - 4 ) changed in Estanzo’s record | 23 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 223 (Under Registration - 4 ) → 224 (Under Registration - 5 ) changed in Estanzo’s record | 11 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 223 (Under Registration - 5 ) → 223 (Under Registration - 4 ) changed in Estanzo’s record | 7 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 220 (Under Registration - 3 ) → 223 (Under Registration - 5 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 18 Oct 2026 · 5 movements on record |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about GH-1 Grand Omaxe LINCOLN A and B
Is GH-1 Grand Omaxe LINCOLN A and B RERA registered?
Yes. GH-1 Grand Omaxe LINCOLN A and B is registered with UPRERA under registration number UPRERAPRJ624607, registered on 10 May 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for GH-1 Grand Omaxe LINCOLN A and B?
The completion date filed with UPRERA is 28 Feb 2030. No completion certificate is on record yet.
Who is the builder of GH-1 Grand Omaxe LINCOLN A and B?
Omaxe Limited is the promoter entity that filed GH-1 Grand Omaxe LINCOLN A and B with UPRERA (promoter RERA ID UPRERAPRM2386). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does GH-1 Grand Omaxe LINCOLN A and B have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GH-1 Grand Omaxe LINCOLN A and B located?
GH-1 Grand Omaxe LINCOLN A and B is registered in Lucknow, Lucknow, as filed with UPRERA.
What configurations are available in GH-1 Grand Omaxe LINCOLN A and B?
The unit plan filed with UPRERA lists 3 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in GH-1 Grand Omaxe LINCOLN A and B?
The approved unit plan filed with UPRERA runs from 13 to 119 m² of carpet area (about 142 to 1,285 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in GH-1 Grand Omaxe LINCOLN A and B?
The approved unit plan describes 3 blocks and 98 units of which 90 are homes and 8 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is GH-1 Grand Omaxe LINCOLN A and B?
About 65 units per acre: 98 planned units across 1.51 acres (6,100 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗