GLORY GARDEN PHASE II TO V is a RERA-registered residential project by Vasundhara Real Estate in Hathras (RERA ID UPRERAPRJ392359). Registered with a completion deadline of 29 Dec 2025.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ392359 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 1 Jan 2021 |
| Project duration | 60 months |
| Address | Hathras, Hathras |
| Tehsil | Hathras |
| Applicant type | Partnership Firm |
| Applicant address | VG PLAZA GLORY GARDEN MATHURA ROAD HATHRAS-204101 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Building permit sanctioned
139/2020-21,140/2020-21,148/2020-21,149/2020-21
Registered with RERA
Completion certificate filed
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 31 Mar 2021 |
| Original completion | 29 Dec 2025 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 6 Jan 2024 |
| Registration fee | ₹1,76,000 |
| Sanctioning authority | Any Other Competent Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Pocketed Boundary Wall and each plot demarked by CC muddi Plot size 7.01 m X 13.72 m =96.18 Sqm, 7.62 m X16.46 m = 125.43 Sqm. and 9.14 m X 18.29 m = 167.17 Sqm. |
| 2 | Boundary Wall Height 1.8 mtr up to road level and Thickness 230 mm with 345mm Pillers, Bricks Work and 1.2 mtr Wire Fensing total length of boundary wall 830 mtr |
| 3 | Road Work One Cote 150 MM 85mm stone blast and one cote 120 MM 65mm stone blast and top 80 MM CC/Paver Road |
| 4 | Footpaths Raw Pavement |
| 5 | Water Supply Including Drinking Water Facilities Underground PVC water pipe line through borewell summersable pump |
| 6 | Sewer System Every plot holder to be constructed individual septic tank |
| 7 | Drain Drainage constructed by bricks work |
| 8 | Parks Bricks work in boundary wall and plantation etc. |
| 9 | Tree Planting Combination of ornamental indiginous plants |
| 10 | Design For Electric Supply Including Street Lighting As per norms of UPPCL |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water Every plot holders to be constructed individual septic tank |
| 13 | Solid Waste Management And Disposal System Door to door collection system managed by nagar palika hathras |
| 14 | Water Conservation System water recharge system by Four rain water harvesting system in park |
| 15 | Energy Management System Including Use of Renewable Energy N/A |
| 16 | Fire Protection And Fire Safety System N/A |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Security Guards and park |
| 18 | Emergency Evacuation Services N/A |
| 19 | Other Miscellaneous Work Park and Pathways |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 29 Dec 2025.
Sanctioned by Any Other Competent Authority · 34,110 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 139/2020-21,140/2020-21,148/2020-21,149/2020-21 | 11 Jan 2021 | 29 Dec 2025 | 29 Dec 2025 | 29 Dec 2025 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
Land & documents
19 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 501/2/1 | 2750 | Khasra |
| 501/2/2 | 8300 | Khasra |
| 501/2/3 | 23370 | Khasra |
| Sale deed · 8535/303-342/1395 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1/3135/85-124/2551 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1/8679/21-40/4032 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 1/8646/71-100/3341 The registered deed by which the promoter bought the land. | PDF ↗ |
| Registry document · 21/09/2020 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1425-1430 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 21/09/2020 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | not reported | — |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 20 Mar 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 20 Mar 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 20 Mar 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 18 Feb 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 18 Feb 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 18 Feb 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 18 Feb 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 18 Feb 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 20 Mar 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 18 Feb 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 18 Feb 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 18 Feb 2021 ↗ |
Quarterly progress reports
20 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
20 quarterly progress reports are on file with UPRERA, covering 2020-Q4 to 2025-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 100% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Vasundhara Real Estate |
| Role | Promoter · current |
| RERA ID | UPRERAPRM23725 |
| PAN | AAFFV6281M |
| CIN / TAN | AGRV10568F |
| Registered address | VG PLAZA GLORY GARDEN MATHURA ROAD HATHRAS-204101 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Hathras
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | VASUNDHARA REAL ESTATESBankPUNJAB NATIONAL BANKBranchHATHRAS CITYA/C no.IFSCPUNB0020000 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about GLORY GARDEN PHASE II TO V
Is GLORY GARDEN PHASE II TO V RERA registered?
Yes. GLORY GARDEN PHASE II TO V is registered with UPRERA under registration number UPRERAPRJ392359, registered on 31 Mar 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has GLORY GARDEN PHASE II TO V been completed?
UPRERA still lists GLORY GARDEN PHASE II TO V as Registered, so it is not shown as completed here. A completion certificate dated 6 Jan 2024 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of GLORY GARDEN PHASE II TO V?
Vasundhara Real Estate is the promoter entity that filed GLORY GARDEN PHASE II TO V with UPRERA (promoter RERA ID UPRERAPRM23725). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does GLORY GARDEN PHASE II TO V have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GLORY GARDEN PHASE II TO V located?
GLORY GARDEN PHASE II TO V is registered in Hathras, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗