RASIK GREENS

UPRERARegistered

RASIK GREENS is a RERA-registered residential project by M/S RASIK INFRA CONSTRUCTIONS in Harduaganj Dehat, Aligarh (RERA ID UPRERAPRJ643224). Registered with a completion deadline of 22 Dec 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ643224
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryAligarh Development Authority
Proposed start15 Jan 2026
Project duration60 months
AddressKhasra No 280 MI, 202MI, 279/1 Near Rasik Tower, Harduaganj Dehat, Koil, Aligarh
TehsilKoil
Applicant typePartnership Firm
Applicant addressM-10 VRIDAVAN DHAM-II MAHAVIR PARK , MARRIS ROAD, ALIGARH- 202001
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/03330/AGDA/BP/25-26/0417/23122025

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered17 Feb 2026
Original completion22 Dec 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,38,000
Sanctioning authorityAligarh Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors512 · 4 · 16 (units from plan)
  • 4 BHK256 50%
  • 3 BHK256 50%
ConfigurationUnitsCarpet area
4 BHK256115-188
3 BHK25672-188
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK A · 4 BHK16128124-188
BLOCK B · 4 BHK16128115-168
BLOCK C · 3 BHK1612872-188
BLOCK D · 3 BHK1612872-188
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Rajendra Kumar Verma
License M1519241
Aligarh
Engineer
Akash Singh
ADA Colony, Agra Road, Aligarh-202001
Contractor
Mohd Furkan Ali
Aligarh
Sr.Development work declared to RERA
1Demarcation of Plots
Completed
2Boundary Wall
To be built of brickwork, plaster and paint (10 FT HEIGHT)
3Road Work
CC – Tremix / Interlock 5” WIDTH
4Footpaths
PAVER BLOCK/TREMIX WITH CURVSTONE
5Water Supply Including Drinking Water Facilities
From Borewell to Overhead tanks to units 8 TANKS OF 25,000 LTR CAPACITY OF EACH
6Sewer System
Septic tank with overflow connected to drains TO COVERED BY CONNECTION WITH STP
7Drain
SEWER DRAIN DWC / RCC pipes of 500MM DIA STORM WATER DRAIN OF RCC WITH COVER BLOCKS
8Parks
Green grass park with ample sitting and children playing arrangements ALONGWITH LANDSCAPING & HORTICULTURE WORK.
9Tree Planting
Complete tree planting around the boundary wall and foothpath and parks
10Design For Electric Supply Including Street Lighting
Ample provision of street lights WITH 100WATT/200-WATT LED PANELS & HI-MASK LIGHTS WHEREVER REQUIRED
11Community Buildings
Community centre for the complex is proposed
12Treatment and Disposal System of Sewage and Sullage water
Sewage Treatment Plant will be installed 400 KLD
13Solid Waste Management And Disposal System
Sewage Treatment Plant will be installed 400 KLD
14Water Conservation System
Multiple rain water harvesting to be installed
15Energy Management System Including Use of Renewable Energy
Power saving lights of 100 KVA with rooftop solar system for common area lights / lifts
16Fire Protection And Fire Safety System
Appropriate installations of fire safety – including hydrant, pipelines, sprinklers will be done. MS ERW PIPES (TYPE C) OF DIA 200 MM, 150 MM, 100 MM, 80 MM, CO2 TYPE FIRE EXTINGUISHER, ABC TYPE FIRE EXTINGUISHER LOW PRESSURE HIGH PRESSURE MOTORS & JOCKEY PUMPS
17Social Infrastructure And Other Public Amenities Including Public Health Services
Badmintion court, gym, swimming pool, libraries are proposed
18Emergency Evacuation Services
Ample with of roads and setbacks
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1AMIT KUMAR AGRAWALUPRERAAGT20342
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Dec 2030.

Sanctioned by Aligarh Development Authority · 26,511 sqm of land · an approved plan of 4 blocks and 512 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/03330/AGDA/BP/25-26/0417/2312202523 Dec 202522 Dec 203022 Dec 203322 Dec 2030
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

34 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
280MI1710Khasra
280MI1710Khasra
280MI1710Khasra
280MI1710Khasra
280MI1710Khasra
280MI1826Khasra
280MI1826Khasra
280MI1826Khasra
279/11015Khasra
279/11015Khasra
202MI1585Khasra
280MI282Khasra
280MI263Khasra
202MI1223Khasra
202MI1223Khasra
202MI1224Khasra
202MI1585Khasra
202MI1585Khasra
202MI1585Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 01/15649/181-202/6044
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15649/203-226/6045
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15649/227-248/6046
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15649/249-270/6047
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15649/271-292/6048
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15647/347-366/6009
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15647/367-386/6010
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15647/387-406/6011
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16181/199-218/4832
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16181/179-198/4831
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16926/279-298/6531
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15992/37-54/57
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/15992/17-36/56
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16920/1-20/6378
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16920/21-40/6379
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16920/41-60/6380
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16928/77-96/6566
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16928/57-76/6565
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 01/16926/313-332/6533
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1429-1434
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New13 Aug 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New13 Aug 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New13 Aug 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New13 Aug 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New12 Jan 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New12 Jan 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New12 Jan 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New12 Jan 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New24 Dec 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New25 Dec 2025 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New12 Jan 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New12 Jan 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New18 Aug 2025 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New16 Aug 2025 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q1.

QuarterConstructionCertificates
2025-Q417.33%CA ↗ · Arch ↗ · Eng ↗
2026-Q122.75%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameM/S RASIK INFRA CONSTRUCTIONS
RolePromoter · current
RERA IDUPRERAPRM42332
PANAAUFR2345D
CIN / TANAGRR12775A
Registered addressM-10 VRIDAVAN DHAM-II MAHAVIR PARK , MARRIS ROAD, ALIGARH- 202001
RERA contact
Registered since2018
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Aligarh

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Rasik Infra Constructions Collection Account for Rasik GreensBankPunjab National BankBranchTala NagriBranch addressTala Nagri, Rasik Tower, Harduaganj, Aliganj, Uttar PradeshBranch districtAligarh, Uttar PradeshA/C no.IFSCPUNB0954600Branch emailbo954600@pnb.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Rasik Infra Constructions Separate Account for Rasik GreensBankPunjab National BankBranchTala NagriBranch addressTala Nagri, Rasik Tower, Harduaganj, Aligarh 202125Branch districtAligarh, Uttar PradeshA/C no.IFSCPUNB0954600
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Rasik Infra Constructions Transaction Account for Rasik GreensBankPunjab National BankBranchTala NagriBranch addressTala Nagri, Rasik Tower, Harduaganj, Aligarh, UP- 202125Branch districtAligarh, Uttar PradeshA/C no.IFSCPUNB0954600
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about RASIK GREENS

Is RASIK GREENS RERA registered?

Yes. RASIK GREENS is registered with UPRERA under registration number UPRERAPRJ643224, registered on 17 Feb 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for RASIK GREENS?

The completion date filed with UPRERA is 22 Dec 2030. No completion certificate is on record yet.

Who is the builder of RASIK GREENS?

M/S RASIK INFRA CONSTRUCTIONS is the promoter entity that filed RASIK GREENS with UPRERA (promoter RERA ID UPRERAPRM42332). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does RASIK GREENS have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RASIK GREENS located?

RASIK GREENS is registered in Harduaganj Dehat, Aligarh, as filed with UPRERA.

What configurations are available in RASIK GREENS?

The unit plan filed with UPRERA lists 4 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in RASIK GREENS?

The approved unit plan filed with UPRERA runs from 72 to 188 m² of carpet area (about 770 to 2,027 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in RASIK GREENS?

The approved unit plan describes 4 blocks and 512 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is RASIK GREENS?

About 78 units per acre: 512 planned units across 6.55 acres (26,511 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗