GSP Divine Homes is a RERA-registered residential project by OZONE PROMOTERS PRIVATE LIMITED in Aligarh (RERA ID UPRERAPRJ396964). Registered with a completion deadline of 6 Jul 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ396964 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Any Other Competent Authority |
| Proposed start | 15 Nov 2021 |
| Project duration | 56 months |
| Address | Koil, Aligarh |
| Tehsil | Koil |
| Applicant type | Company |
| Applicant address | B-2/16 Mohan Cooperative Indl. Estate, Behind Badarpur Metro Station, New Delhi -110044 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
387/SIDA/ATP
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
Completion certificate filed
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 21 Dec 2021 |
| Original completion | 30 Jun 2026 |
| Revised completion | 6 Jul 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 19 Aug 2026 |
| Registration fee | ₹58,500 |
| Sanctioning authority | Any Other Competent Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 3 BHK80 48%
- 4 BHK80 48%
- SHOP7 4%
| Configuration | Units | Carpet area |
|---|---|---|
| 3 BHK | 80 | 83 |
| 4 BHK | 80 | 105 |
| SHOP | 7 | 17-17 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| A · 3 BHK, 4 BHK, OTHER | 11 | 40 | 83-105 |
| B · 3 BHK, 4 BHK, OTHER | 11 | 40 | 83-105 |
| C · 3 BHK, 4 BHK, OTHER | 11 | 40 | 83-105 |
| COMMERCIAL AND COMMUNITY · OTHER, SHOP | 3 | 7 | 17-17 |
| D · 3 BHK, 4 BHK, OTHER | 11 | 40 | 83-105 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Demarcation of plot was given by UPSIDA . It is a rectangular corner plot of 237mt. by 45 mt. situated on 24 mt. wide road and 18 mt road. As per the demarcation provided by UPSIDA permanent boundary wall on all four sides was raised. |
| 2 | Boundary Wall 1.5 meter high boundary wall with brick masonry and MS Grill has been constructed on all four sides. |
| 3 | Road Work Six meter wide internal road finished in trimix / concrete pavers . Length of the road is around 490 mt.s and approximate area shall be 2950 sq.mt. |
| 4 | Footpaths Footpath shall have RCC curb stones and shall be finished with cement tiles / stone with an underlay of 100 mm thick PCC. All parking areas shall be finished with concrete paver / grass pavers as per design. |
| 5 | Water Supply Including Drinking Water Facilities Provision of 24 by 7 water supply to all the apartments and common area through 100 KLD underground and 30 KLD overhead tanks shall be provided. |
| 6 | Sewer System Under ground sewerage system has .been proposed. The sewerage system shall be connected to STP. The capacity of STP shall be 65 KLD approximately |
| 7 | Drain Covered storm water drain is being provided on the 6mt wide peripheral road which is connected to rain water harvesting pits with provision of water over flow to the external drains. |
| 8 | Parks Green area has been provided well distributed with in the plot. The total area of the green is about 1890 sq.mt. |
| 9 | Tree Planting More than 80 trees will be provided along the boundary. Out of this about fifty percent will be ornamental and balance fifty percent shall be evergreen type. |
| 10 | Design For Electric Supply Including Street Lighting External lighting shall comprise of LED based light fixtures with desired lux level as per NBC norms . Electrical system shall consist of supply through 850 KVA transformer. Individual connections in each apartment shall be provided by state electricity board. |
| 11 | Community Buildings Community facilities have been provided above the commercial area. First floor of the community area has lounge with common toilets, gymnasium and indoor games. Second floor shall have multi-purpose hall and spill out terrace. |
| 12 | Treatment and Disposal System of Sewage and Sullage water About 65 KLD capacity of STP has been provided at ground level to take care of the sewage and waste water. The treated water will be used for gardening, flushing of WC etc. |
| 13 | Solid Waste Management And Disposal System The expected solid waste generation is 0.6 kg/ day/ capita . In order to treat this, a composture shall be provided. |
| 14 | Water Conservation System Recharging of ground water will be through rain water harvesting system. Treated water from STP will be re used for flushing of WC and horticulture etc. |
| 15 | Energy Management System Including Use of Renewable Energy Adequate use of LED lights in street lighting and common area has been proposed. To save energy, solar panels shall be installed as per norms. Some part of the hot water demand in the commercial area will be met through solar energy and in this regard due norms will be followed. |
| 16 | Fire Protection And Fire Safety System Fire hose cabinet has been provided on every floor as per NBC which is connected to over head fire tank. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Shops, pool, steam, sauna, community hall, gymnasium, kids play area, basket ball and badminton provided with in the complex. |
| 18 | Emergency Evacuation Services Two stair case in each tower has been provided out of which one is a fire stair case planned as per NBC norms. Each floor has only four apartments for whom two stair cases are available for exit in case of emergency. The stair case leads to internal peripheral roads on ground floor. |
| 19 | Other Miscellaneous Work Rest all work to be done as per sanctioned drawings and approvals. |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 6 Jul 2026.
Sanctioned by Any Other Competent Authority · 10,665 sqm of land · an approved plan of 5 blocks and 167 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 387/SIDA/ATP | 7 Jul 2021 | 6 Jul 2026 | 6 Jul 2026 | 30 Jun 2026 |
| Document | File |
|---|---|
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | no file published |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 6 Jul 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Jun 2026 | 6 Jul 2026 | — |
Land & documents
23 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| GH-A (GH-6 to GH-13) | 10575 | Plot |
| GH-A (GH-6 to GH-13) Additional Area | 90 | Plot |
| Lease deed · 3861 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Lease deed · 8181 The deed by which a development authority leased the land to the promoter, with the term and the conditions on it. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | not reported | — |
| Water supply plan How the project proposed to supply water, as filed at registration. | not reported | — |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | not reported | — |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 15 Dec 2021 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 23 Nov 2021 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 23 Nov 2021 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 23 Nov 2021 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 13 Oct 2021 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 15 Dec 2021 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 15 Dec 2021 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 15 Dec 2021 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 15 Dec 2021 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 15 Dec 2021 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 21 Nov 2021 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 15 Dec 2021 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 15 Dec 2021 ↗ |
Quarterly progress reports
19 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
19 quarterly progress reports are on file with UPRERA, covering 2021-Q3 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 54.46% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 55.58% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 56.21% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 56.22% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | OZONE PROMOTERS PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM135287 |
| PAN | AAJCA3431D |
| CIN / TAN | U70101DL2011PTC216409 |
| Name of chairman | SUNIL PRAKASH |
| Registered address | B-2/16 Mohan Cooperative Indl. Estate, Behind Badarpur Metro Station, New Delhi -110044 |
| RERA contact | |
| Registered since | 2021 |
Nearby projects
Aligarh
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | OPPL-COLLECTION A/C FOR GSP DIVINE HOMESBankHDFC BANK LIMITEDBranchSECTOR 14 FARIDABADBranch addressSECTOR 14 FARIDABADBranch districtAligarhA/C no.IFSCHDFC0001466 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | OPPL-SEPARATE A/C FOR GSP DIVINE HOMESBankHDFC BANK LIMITEDBranchSECTOR 14 FARIDABADBranch addressSECTOR 14 FARIDABADBranch districtAligarhA/C no.IFSCHDFC0001466 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | OPPL-RERA TRANS A/C FOR GSP DIVINE HOMESBankHDFC BANK LIMITEDBranchSECTOR 14 FARIDABADBranch addressSECTOR 14 FARIDABADBranch districtAligarhA/C no.IFSCHDFC0001466 |
What has changed on this record
2 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Revised completion date on file | 2026-06-30 → 2026-07-06 changed in Estanzo’s record | 7 Oct 2026 |
| Actual completion | 2026-08-19 first recorded by Estanzo | 23 Aug 2026 |
| Revised completion date on file | changed in Estanzo’s record · 7 Oct 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about GSP Divine Homes
Is GSP Divine Homes RERA registered?
Yes. GSP Divine Homes is registered with UPRERA under registration number UPRERAPRJ396964, registered on 21 Dec 2021. Estanzo reproduces that filing; it does not verify the work behind it.
Has GSP Divine Homes been completed?
UPRERA still lists GSP Divine Homes as Registered, so it is not shown as completed here. A completion certificate dated 19 Aug 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of GSP Divine Homes?
OZONE PROMOTERS PRIVATE LIMITED is the promoter entity that filed GSP Divine Homes with UPRERA (promoter RERA ID UPRERAPRM135287). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted GSP Divine Homes more time to complete?
UPRERA's record carries 1 completion extension for GSP Divine Homes, the latest running to 6 Jul 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does GSP Divine Homes have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is GSP Divine Homes located?
GSP Divine Homes is registered in Aligarh, as filed with UPRERA.
What configurations are available in GSP Divine Homes?
The unit plan filed with UPRERA lists 3 BHK, 4 BHK, OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in GSP Divine Homes?
The approved unit plan filed with UPRERA runs from 17 to 105 m² of carpet area (about 179 to 1,131 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in GSP Divine Homes?
The approved unit plan describes 5 blocks and 167 units of which 160 are homes and 7 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is GSP Divine Homes?
About 63 units per acre: 167 planned units across 2.64 acres (10,665 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗