UTOPIA ESTATE

UPRERARegistered

UTOPIA ESTATE is a RERA-registered residential project by SAI ADHIRAAJ LAND & PROMOTERS PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ6483). Registered with a completion deadline of 31 Dec 2023. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ6483
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Apr 2016
Project duration93 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant address27 MIG TRANSPORT HOUSING SCHEME, AGRA
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 2 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  7. to

    Extension granted

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered18 Aug 2017
Original completion31 Dec 2019
Revised completion31 Dec 2023
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹38,500
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors207 · 1 · 1 (units from plan)
  • 2 BHK161 78%
  • 1 BHK46 22%
ConfigurationUnitsCarpet area
1 BHK4644
2 BHK16169-90
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
D13 · 1 BHK, 2 BHK120744-90
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
REPL
Engineer
SANJAY JAISWAL
Contractor
SPACE TECHNO BUILD P. LTD
Sr.Development work declared to RERA
1Demarcation of Plots
Yes
2Boundary Wall
No
3Road Work
No
4Footpaths
No
5Water Supply Including Drinking Water Facilities
No
6Sewer System
No
7Drain
No
8Parks
No
9Tree Planting
No
10Design For Electric Supply Including Street Lighting
No
11Community Buildings
No
12Treatment and Disposal System of Sewage and Sullage water
No
13Solid Waste Management And Disposal System
No
14Water Conservation System
No
15Energy Management System Including Use of Renewable Energy
Yes
16Fire Protection And Fire Safety System
Yes
17Social Infrastructure And Other Public Amenities Including Public Health Services
No
18Emergency Evacuation Services
Yes
19Other Miscellaneous Work
Yes
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 28 May 2019.

Sanctioned by Ghaziabad Development Authority · 6,641 sqm of land · an approved plan of 1 block and 207 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
57/05/20-34428 May 201428 May 201928 May 202228 Mar 2022
57/05/20-34428 May 201428 May 201928 May 202228 Mar 2022
Plans and approvals filed with RERA
DocumentFile
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 4 completion extensions for this project, the latest running to 31 Dec 2023.

#Granted fromExtended uptoNote
131 Dec 201930 Dec 2020—
230 Dec 202029 Jun 2021Six months extension in view of force majeure caused by covid-19 pandemic
329 Jun 202128 Mar 2022—
428 Mar 202231 Dec 2023—

Land & documents

1 filing

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1039/104031114 SQ. METER—
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 17 Aug 2015.

Registry no.DateTypeArea
12734/201117 Aug 2015other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · WIDE MB NO. 27/2005
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · WIDE MB NO. 27/2005
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Renewable energyYES

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

6 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

6 quarterly progress reports are on file with UPRERA, covering 2020-Q2 to 2021-Q4.

QuarterConstructionCertificates
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSAI ADHIRAAJ LAND & PROMOTERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM12669
PANAKAPR6038F
CIN / TANU45203DL2012PTC237994
Name of chairmanTarun Raghav Sunita Singh
Registered address27 MIG TRANSPORT HOUSING SCHEME, AGRA
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ADHIRAAJ LAND & PROMOTERS P. LTD.BankBANK OF BARODABranchCROSSING REPUBLIKA/C no.IFSCBARB0CROGHA
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about UTOPIA ESTATE

Is UTOPIA ESTATE RERA registered?

Yes. UTOPIA ESTATE is registered with UPRERA under registration number UPRERAPRJ6483, registered on 18 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for UTOPIA ESTATE?

The completion date filed with UPRERA is 31 Dec 2023. No completion certificate is on record yet.

Who is the builder of UTOPIA ESTATE?

SAI ADHIRAAJ LAND & PROMOTERS PRIVATE LIMITED is the promoter entity that filed UTOPIA ESTATE with UPRERA (promoter RERA ID UPRERAPRM12669). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does UTOPIA ESTATE show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted UTOPIA ESTATE more time to complete?

UPRERA's record carries 4 completion extensions for UTOPIA ESTATE, the latest running to 31 Dec 2023. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does UTOPIA ESTATE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is UTOPIA ESTATE located?

UTOPIA ESTATE is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in UTOPIA ESTATE?

The unit plan filed with UPRERA lists 1 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in UTOPIA ESTATE?

The approved unit plan filed with UPRERA runs from 44 to 90 m² of carpet area (about 473 to 968 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in UTOPIA ESTATE?

The approved unit plan describes 1 block and 207 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is UTOPIA ESTATE?

About 126 units per acre: 207 planned units across 1.64 acres (6,641 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗