Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5633
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start1 Aug 2017
Original start1 Aug 2017
Project duration59 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressParmesh Corporate Towers 309, 3rd Floor, Plot No. 13 Karkardooma Community Centre Delhi
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    573/Zone-4/2012-13

  2. 3 building permits sanctioned

  3. valid to

    Permit revalidated

    573/Zone-4/2012-13

  4. Registered with RERA

  5. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  6. 4 completion certificates filed

  7. Completion certificate filed

  8. to

    Extension granted

  9. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  10. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  11. to

    Extension granted

  12. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  13. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered30 Jul 2017
Original completion31 Mar 2020
Revised completion12 Jun 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary27 Aug 2019
Registration fee₹1,57,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,099 · 6 · 31 (units from plan)
  • 3 BHK684 62%
  • 2 BHK358 33%
  • 4 BHK54 5%
  • 1 BHK3 <1%
ConfigurationUnitsCarpet area
3 BHK68474-129
1 BHK344-50
2 BHK35859-73
4 BHK54129
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
1A · 4 BHK, 3 BHK, OTHER28108116-129
1B · 3 BHK, 1 BHK, OTHER3118044-89
2A · 3 BHK, 1 BHK, OTHER3124044-86
2B · 2 BHK, OTHER3120959-72
3A · 1 BHK, 3 BHK, OTHER3112050-86
3B · 3 BHK, 2 BHK, OTHER3124259-89
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Vishal Mittal
License CA/98/23185
Space Designer International Architect Pvt. Ltd., 5/1306, Vasundhara, Ghaziabad - 201001
Engineer
VD Sharma & Parsad Chundru
Optimum Designer Pvt. Ltd. (Consulting Engineers), 2C/335, Vasundhara, Ghaziabad 201012 & Metey Engineers & Consultants Pvt. Ltd., 2-4-216 Road 9A, Snehapur Colony New Nagole, Hyderabad-500035
Contractor
M/s. Gannon Dunkerley & Co. Ltd.
B-228,Okhla Industrial Area, Phase 1, New Delhi-110020
Sr.Development work declared to RERA
1Demarcation of Plots
As per sanction Map
2Boundary Wall
As per sanction Map
3Road Work
As per sanction Map
4Footpaths
As per sanction Map
5Water Supply Including Drinking Water Facilities
As per sanction Map
6Sewer System
As per sanction Map
7Drain
As per sanction Map
8Parks
As per sanction Map
9Tree Planting
As per sanction Map
10Design For Electric Supply Including Street Lighting
As per sanction Map
11Community Buildings
As per sanction Map
12Treatment and Disposal System of Sewage and Sullage water
As per sanction Map
13Solid Waste Management And Disposal System
As per sanction Map
14Water Conservation System
As per sanction Map
15Energy Management System Including Use of Renewable Energy
As per sanction Map
16Fire Protection And Fire Safety System
As per sanction Map
17Social Infrastructure And Other Public Amenities Including Public Health Services
As per sanction Map
18Emergency Evacuation Services
As per sanction Map
19Other Miscellaneous Work
As per sanction Map
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1RAHULUPRERAAGT11454
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 19 Feb 2019. 2 of them carry a revalidation, the latest valid to 2 Jul 2022.

Sanctioned by Ghaziabad Development Authority · 30,303 sqm of land · an approved plan of 6 blocks and 1099 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
579/MP/201417 Feb 201419 Feb 20192 Jul 202212 Jun 20223 Jul 2017
valid to 2 Jul 2022
as 573/Zone-4/2012-13
573/Zone-4/2012-1317 Feb 201416 Feb 201914 Mar 202212 Jun 202217 Feb 2014
valid to 14 Mar 2022
573/Zone-4/2012-1317 Feb 201416 Feb 201913 Sept 202112 Jun 2022—
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 12 Jun 2022.

#Granted fromExtended uptoNote
131 Mar 202014 Mar 2021—
214 Mar 202113 Sept 2021Six months extension in view of force majeure caused by covid-19 pandemic
313 Sept 202112 Jun 2022—

Land & documents

49 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
3711140—
3721140—
3732910—
3743160—
3753410—
376630—
377890—
3781390—
379760—
3802400—
278 (part)816Khasra
279 (part)928Khasra
280 (part)737Khasra
2811329Khasra
36890Khasra
370 (part)615Khasra
372650Khasra
371 (part)650Khasra
3732910Khasra
3743160Khasra
3753410Khasra
378990Khasra
379 (part)381Khasra
3801460Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

9 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 21 Jun 2007.

Registry no.DateTypeArea
16661 Apr 2010self—
383827 Aug 2010self—
44649 Aug 2007self—
383327 Aug 2010self—
383627 Aug 2010self—
375121 Jun 2007self—
47661 Sept 2007self—
16651 Apr 2010self—
383627 Aug 2010self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 3999
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 789
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4135
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4463
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 401 (PART -1)
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 401 (PART -2)
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4946
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5350 (PART-1)
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5350 (PART-2)
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 5255
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3976
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4225
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3288
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3351
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 4766
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 6053
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 3341
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 65
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 269
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · 3838
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1665
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3836
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3833
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1666
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New29 Jun 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 Jun 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Jun 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New20 Jun 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New2 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New1 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New5 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New4 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New5 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old12 Oct 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old12 Oct 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old12 Oct 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old12 Oct 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old12 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old17 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old17 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old23 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old24 Oct 2017 ↗

Quarterly progress reports

9 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

9 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameLandcraft Developers Private Limited
RolePromoter · current
RERA IDUPRERAPRM11777
PANAABCL1391F
CIN / TANU45201DL2005PTC132131
Name of chairman1) Mr. Rakesh Garg 2) Mr. Lalit Kumar Jaiswal 3) Mr. Rakesh Kumar Goel 4) Mr. Manu Garg
Registered addressParmesh Corporate Towers 309, 3rd Floor, Plot No. 13 Karkardooma Community Centre Delhi
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
Landcraft Developers Pvt LtdBankINDUSIND BANKBranchINDUSIND BANK RAJ NAGAR, RAJ NAGAR MAIN ROAD, GHAZIABADA/C no.IFSCINDB0000171
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Golf Links Phase 2

Is Golf Links Phase 2 RERA registered?

Yes. Golf Links Phase 2 is registered with UPRERA under registration number UPRERAPRJ5633, registered on 30 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has Golf Links Phase 2 been completed?

UPRERA still lists Golf Links Phase 2 as Registered, so it is not shown as completed here. A completion certificate dated 27 Aug 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Golf Links Phase 2?

Landcraft Developers Private Limited is the promoter entity that filed Golf Links Phase 2 with UPRERA (promoter RERA ID UPRERAPRM11777). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Golf Links Phase 2 more time to complete?

UPRERA's record carries 3 completion extensions for Golf Links Phase 2, the latest running to 12 Jun 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Golf Links Phase 2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Golf Links Phase 2 located?

Golf Links Phase 2 is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in Golf Links Phase 2?

The unit plan filed with UPRERA lists 3 BHK, 1 BHK, 2 BHK, 4 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Golf Links Phase 2?

The approved unit plan filed with UPRERA runs from 44 to 129 m² of carpet area (about 471 to 1,390 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Golf Links Phase 2?

The approved unit plan describes 6 blocks and 1,099 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Golf Links Phase 2?

About 147 units per acre: 1,099 planned units across 7.49 acres (30,303 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗