GRAND CARNESIA AT PRATEEK GRAND CITY

UPRERARegistered

GRAND CARNESIA AT PRATEEK GRAND CITY is a RERA-registered residential project by PRATEEK REALTORS INDIA PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ723). Registered with a completion deadline of 27 Nov 2022.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ723
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start28 Aug 2014
Original start28 Aug 2014
Project duration99 months
AddressSIDDHARTH VIHAR, GHAZIABAD, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressKK-12, KAVI NAGAR, GHAZIABAD, UTTAR PRADESH-201002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. 3 building permits sanctioned

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. valid to

    Permit revalidated

    1683

  7. to

    Extension granted

  8. to

    Extension granted

  9. to

    Extension granted

  10. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  11. Completion certificate filed

  12. Completion certificate filed

  13. Completion certificate filed

  14. 2 completion certificates filed

  15. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered27 Jul 2017
Original completion30 Jun 2020
Revised completion27 Nov 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary29 Jun 2023
Registration fee₹2,99,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors2,796 · 15 · 33 (units from plan)
  • 2 BHK1,180 42%
  • 1 BHK856 31%
  • 3 BHK760 27%
ConfigurationUnitsCarpet area
1 BHK85649-60
2 BHK1,18049-74
3 BHK76088-118
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
C1 · OTHER, 2 BHK, 3 BHK3222474-88
C10 · OTHER, 3 BHK30104103-118
C11 · 1 BHK, 2 BHK, OTHER3021249-60
C12 · OTHER, 1 BHK, 2 BHK3222849-60
C14 · OTHER, 3 BHK33116103-118
C15 · OTHER, 3 BHK30104103-118
C16 · OTHER, 3 BHK, 2 BHK3020874-88
C2 · OTHER, 2 BHK, 3 BHK3020874-88
C3 · OTHER, 1 BHK, 2 BHK3020849-60
C4 · OTHER, 1 BHK, 2 BHK3222449-60
C5 · OTHER, 1 BHK, 2 BHK3020049-60
C6 · OTHER, 1 BHK, 2 BHK3222449-60
C7 · OTHER, 1 BHK, 2 BHK3022049-60
C8 · OTHER, 1 BHK, 2 BHK2920060
C9 · OTHER, 3 BHK33116103-118
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
DEEPAK MEHTA & ASSOCIATES AND DESIGN CONCEPT BY AR
License COA/87/10840
PLOT NO-16 ABHISHEK PLAZA L.S.C., MAYUR VIHAR PHASE-II, DELHI-110091
Engineer
VMS CONSULTANT PVT. LTD.
83/83 SAKHAR BHAVAN 230, NARIMAN POINT, MUMBAI-400021
Contractor
AHLUWALIA CONTRACTS (INDIA) LTD. & MODERN CONSTRUC
A-177, OKHLA INDUSTRIAL AREA, PHASE-1, NEW DELHI-1
Sr.Development work declared to RERA
1Demarcation of Plots
Plot No.4/B.S.-01 & B.S.-05 Siddarth Vihar NH-24 Ghaziabad.
2Boundary Wall
Combination of Rcc and MS work.
3Road Work
Combination of RCC and concrete Pavers
4Footpaths
Footpaths are for pedestrians and connect with building entrance lobby.
5Water Supply Including Drinking Water Facilities
Provided By UPAVP (Uttar Pradesh Awas Evam Vikas Parishad)
6Sewer System
Dual Plumbing Sewerage system with STP.
7Drain
Storm Water drainage connected to Rain water harvesting pit.
8Parks
Landscape area is provided for parks and other recreational activity.
9Tree Planting
Planting tree and shrubs of different species.
10Design For Electric Supply Including Street Lighting
Electric Supply from UPAVP (Uttar Pradesh Awas Evam Vikas Parishad)
11Community Buildings
Community building equipped with so many facilities.
12Treatment and Disposal System of Sewage and Sullage water
Providing Sewerage treatment plan ( STP) for Treatment and Disposal of Sewage and Sullage water
13Solid Waste Management And Disposal System
Provided at site.
14Water Conservation System
By providing Rain Water Harvesting System
15Energy Management System Including Use of Renewable Energy
Installing Solar panel for Energy Management System and Use of Renewable Energy in common area
16Fire Protection And Fire Safety System
Designed with under ground water tank, sprinkler system, hydrant system, hand held fire Extinguisher. Automatic and Manual fire alarm system.
17Social Infrastructure And Other Public Amenities Including Public Health Services
N/A
18Emergency Evacuation Services
Providing Firescape staircase with Evacuation path to open area
19Other Miscellaneous Work
N/A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

4 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1ANAROCK Property Consultants Private LimitedUPRERAAGT10265
2NEOBRIX CONSULTING PVT LTDUPRERAAGT10059
3PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
4SAMS GROUPUPRERAAGT10084
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 27 Aug 2019. 1 of them carries a revalidation, valid to 27 Feb 2022.

Sanctioned by U.P. Awas Evam Vikas Parishad · 58,773 sqm of land · an approved plan of 15 blocks and 2796 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
187528 Aug 201427 Aug 201927 Aug 202227 Nov 2022—
187528 Aug 201427 Aug 201927 Feb 202527 Nov 202231 Jul 2020
valid to 27 Feb 2022
as 1683
187528 Aug 201427 Aug 201926 Aug 202227 Nov 2022—
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 4 completion extensions for this project, the latest running to 27 Nov 2022.

#Granted fromExtended uptoNote
130 Jun 202029 Dec 2020Six months extension in view of force majeure caused by covid-19 pandemic
229 Dec 202028 Dec 2021—
328 Dec 202126 Feb 2022—
426 Feb 202227 Nov 2022—

Land & documents

23 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
PART OF PLOT NO-04/BS-01& 04/BS-05, SIDHARTH VIHAR58773.00 Sq.Mtrs. OUT OF 154916.510 Sq.Mtrs. ALLOT—
PART OF PLOT NO-04/BS-01& 04/BS-05, SIDHARTH VIHAR58773.00 Sq.Mtrs. OUT OF 154916.510 Sq.Mtrs. ALLOTKhasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 25 Feb 2014.

Registry no.DateTypeArea
REGISTRY NO-1423, BOOK NO-1, ZILD NO-4191, PAGE NO25 Feb 2014Own—
REGISTRY NO-4118, BOOK NO-1, ZILD NO-4390, PAGE NO20 Jun 2014Own—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4118
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1423
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New21 Aug 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New21 Aug 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New21 Aug 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New21 Aug 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New21 Aug 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New21 Aug 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New21 Aug 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New21 Aug 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New8 Sept 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old12 Oct 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old12 Oct 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old12 Oct 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old12 Oct 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old12 Oct 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old12 Oct 2017 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
Old12 Oct 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old12 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterWATER SUPPLIED BY UP AWAS VIKAS PARISHAD
Fire safety (as filed with RERA)FIRE ALARM, SPRINKLERS, SMOKE DETECTORS, UNDER GRO
Health serviceDUAL PLUMBING SYSTEM
Renewable energySOLAR PANELS

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2023-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePRATEEK REALTORS INDIA PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM970
PANAAFCP2689G
CIN / TANU70101DL2009PTC197028
Name of chairmanPRASHANT KUMAR TIWARI
Registered addressKK-12, KAVI NAGAR, GHAZIABAD, UTTAR PRADESH-201002
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PRATEEK REALTORS INDIA PRIVATE LIMITEDBankHDFC BANK LIMITEDBranchINDRAPURAMA/C no.IFSCHDFC0000590
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

6 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)490 (Under Registration - 3 ) → 491 (Under Registration - 4 )
changed in Estanzo’s record
11 Oct 2026
Promoter’s complaints tally (all their projects)490 (Under Registration - 4 ) → 490 (Under Registration - 3 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)490 (Under Registration - 5 ) → 490 (Under Registration - 4 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 4 ) → 490 (Under Registration - 5 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 5 ) → 489 (Under Registration - 4 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 6 ) → 489 (Under Registration - 5 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 11 Oct 2026 · 6 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about GRAND CARNESIA AT PRATEEK GRAND CITY

Is GRAND CARNESIA AT PRATEEK GRAND CITY RERA registered?

Yes. GRAND CARNESIA AT PRATEEK GRAND CITY is registered with UPRERA under registration number UPRERAPRJ723, registered on 27 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has GRAND CARNESIA AT PRATEEK GRAND CITY been completed?

UPRERA still lists GRAND CARNESIA AT PRATEEK GRAND CITY as Registered, so it is not shown as completed here. A completion certificate dated 29 Jun 2023 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of GRAND CARNESIA AT PRATEEK GRAND CITY?

PRATEEK REALTORS INDIA PRIVATE LIMITED is the promoter entity that filed GRAND CARNESIA AT PRATEEK GRAND CITY with UPRERA (promoter RERA ID UPRERAPRM970). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted GRAND CARNESIA AT PRATEEK GRAND CITY more time to complete?

UPRERA's record carries 4 completion extensions for GRAND CARNESIA AT PRATEEK GRAND CITY, the latest running to 27 Nov 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does GRAND CARNESIA AT PRATEEK GRAND CITY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GRAND CARNESIA AT PRATEEK GRAND CITY located?

GRAND CARNESIA AT PRATEEK GRAND CITY is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in GRAND CARNESIA AT PRATEEK GRAND CITY?

The unit plan filed with UPRERA lists 1 BHK, 2 BHK, OTHER and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GRAND CARNESIA AT PRATEEK GRAND CITY?

The approved unit plan filed with UPRERA runs from 49 to 118 m² of carpet area (about 532 to 1,272 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GRAND CARNESIA AT PRATEEK GRAND CITY?

The approved unit plan describes 15 blocks and 2,796 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GRAND CARNESIA AT PRATEEK GRAND CITY?

About 193 units per acre: 2,796 planned units across 14.52 acres (58,773 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗