PRATEEK GRAND CITY WALK (CARNESIA) is a RERA-registered commercial project by PRATEEK REALTORS INDIA PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ13828). Registered with a completion deadline of 30 Jun 2021.
RERA status as reported: Registered.Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ13828 |
| Project category | Commercial |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | U.P. Awas Evam Vikas Parishad |
| Proposed start | 15 Nov 2017 |
| Project duration | 44 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | KK-12, KAVI NAGAR, GHAZIABAD, UTTAR PRADESH-201002 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
1875
Registered with RERA
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 27 Oct 2017 |
| Original completion | 31 Dec 2020 |
| Revised completion | 30 Jun 2021 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹37,000 |
| Sanctioning authority | U.P. Awas Evam Vikas Parishad |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots Plot No.4/B.S.-01 & B.S.-05 Siddarth Vihar NH-24 Ghaziabad. |
| 2 | Boundary Wall Combination of Rcc and MS work. |
| 3 | Road Work Combination of RCC and concrete Pavers |
| 4 | Footpaths Footpaths are for pedestrians and connect with each shops |
| 5 | Water Supply Including Drinking Water Facilities Provided By UPAVP (Uttar Pradesh Awas Evam Vikas Parishad) |
| 6 | Sewer System Dual Plumbing Sewerage system with STP. |
| 7 | Drain Storm Water drainage connected to Rain water harvesting pit. |
| 8 | Parks Large area provide as plaza for different type of activity.. |
| 9 | Tree Planting Planting tree and shrubs of different species. |
| 10 | Design For Electric Supply Including Street Lighting Electric Supply from UPAVP (Uttar Pradesh Awas Evam Vikas Parishad) |
| 11 | Community Buildings N/A |
| 12 | Treatment and Disposal System of Sewage and Sullage water Providing Sewerage treatment plan ( STP) for Treatment and Disposal of Sewage and Sullage water |
| 13 | Solid Waste Management And Disposal System Provided at site. |
| 14 | Water Conservation System By providing Rain Water Harvesting System |
| 15 | Energy Management System Including Use of Renewable Energy Installing Solar panel for Energy Management System and Use of Renewable Energy in common area |
| 16 | Fire Protection And Fire Safety System Designed with hydrant system, hand held fire Extinguisher.. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services N/A |
| 18 | Emergency Evacuation Services Providing Firescape staircase with Evacuation path to open area |
| 19 | Other Miscellaneous Work N/A |
Registered agents
4 agents
Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.
| Sr. | Agent | RERA registration |
|---|---|---|
| 1 | ANAROCK Property Consultants Private Limited | UPRERAAGT10265 |
| 2 | NEOBRIX CONSULTING PVT LTD | UPRERAAGT10059 |
| 3 | PROPCASA CONSULTANCY PVT. LTD. | UPRERAAGT10038 |
| 4 | SAMS GROUP | UPRERAAGT10084 |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 27 Aug 2019.
Sanctioned by U.P. Awas Evam Vikas Parishad · 2,627 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| 1875 | 28 Aug 2014 | 27 Aug 2019 | 27 Aug 2022 | 31 Dec 2020 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Project approval The approval the promoter filed as the basis for registering the project. | PDF ↗ |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned layout plan The approved layout of the whole site: where the towers, roads and open areas sit on the plot. | PDF ↗ |
| Sanctioned building plan The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint. | PDF ↗ |
| Floor plans of all unit types The approved plan of each unit type, which is what a carpet-area figure is measured from. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2021.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2020 | 30 Jun 2021 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| PART OF PLOT NO-04/BS-01& 04/BS-05, SIDHARTH VIHAR | 2627.00 Sq.Mtrs. OUT OF 154916.510 Sq.Mtrs. ALLOTT | — |
| PART OF PLOT NO-04/BS-01& 04/BS-05, SIDHARTH VIHAR | 2627.00 Sq.Mtrs. OUT OF 154916.510 Sq.Mtrs. ALLOTT | Plot |
2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 25 Feb 2014.
| Registry no. | Date | Type | Area |
|---|---|---|---|
| REGISTRY NO-4118, BOOK NO-1, ZILD NO-4390, PAGE NO | 20 Jun 2014 | self | — |
| REGISTRY NO-1423, BOOK NO-1, ZILD NO-4191, PAGE NO | 25 Feb 2014 | self | — |
| Registry document · 4118 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1423 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Jul 2018 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 21 Aug 2018 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 21 Aug 2018 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 21 Aug 2018 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 21 Aug 2018 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 21 Aug 2018 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 21 Aug 2018 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Jul 2018 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 8 Sept 2018 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 26 Oct 2017 ↗ |
| Registry document (own land) The registered deed for land the promoter holds itself, rather than under an agreement with a landowner. | Old | 26 Oct 2017 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | Old | 26 Oct 2017 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | Old | 26 Oct 2017 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | Old | 26 Oct 2017 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | Old | 26 Oct 2017 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | Old | 26 Oct 2017 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | Old | 26 Oct 2017 ↗ |
Facilities
as declared to RERA
Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.
| Drinking water | WATER SUPPLIED BY AWAS VIKAS PARISHAD |
| Fire safety (as filed with RERA) | SPRINKLERS |
| Health service | DUAL PLUMBING SYSTEM |
The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.
Quarterly progress reports
11 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
11 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q3.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | PRATEEK REALTORS INDIA PRIVATE LIMITED |
| Role | Promoter · current |
| RERA ID | UPRERAPRM970 |
| PAN | AAFCP2689G |
| CIN / TAN | U70101DL2009PTC197028 |
| Name of chairman | PRASHANT KUMAR TIWARI |
| Registered address | KK-12, KAVI NAGAR, GHAZIABAD, UTTAR PRADESH-201002 |
| RERA contact | |
| Registered since | 2017 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| Bank account as filed | PRATEEK GRAND CITY WALK (CARNESIA)BankHDFC BANK LIMITEDBranchINDRAPURAMA/C no.IFSCHDFC0000590 |
What has changed on this record
6 movements
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 490 (Under Registration - 3 ) → 491 (Under Registration - 4 ) changed in Estanzo’s record | 11 Oct 2026 |
| Promoter’s complaints tally (all their projects) | 490 (Under Registration - 4 ) → 490 (Under Registration - 3 ) changed in Estanzo’s record | 13 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 490 (Under Registration - 5 ) → 490 (Under Registration - 4 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 489 (Under Registration - 4 ) → 490 (Under Registration - 5 ) changed in Estanzo’s record | 1 Sept 2026 |
| Promoter’s complaints tally (all their projects) | 489 (Under Registration - 5 ) → 489 (Under Registration - 4 ) changed in Estanzo’s record | 23 Aug 2026 |
| Promoter’s complaints tally (all their projects) | 489 (Under Registration - 6 ) → 489 (Under Registration - 5 ) changed in Estanzo’s record | 16 Aug 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 11 Oct 2026 · 6 movements on record |
Common questions about PRATEEK GRAND CITY WALK (CARNESIA)
Is PRATEEK GRAND CITY WALK (CARNESIA) RERA registered?
Yes. PRATEEK GRAND CITY WALK (CARNESIA) is registered with UPRERA under registration number UPRERAPRJ13828, registered on 27 Oct 2017. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for PRATEEK GRAND CITY WALK (CARNESIA)?
The completion date filed with UPRERA is 30 Jun 2021. No completion certificate is on record yet.
Who is the builder of PRATEEK GRAND CITY WALK (CARNESIA)?
PRATEEK REALTORS INDIA PRIVATE LIMITED is the promoter entity that filed PRATEEK GRAND CITY WALK (CARNESIA) with UPRERA (promoter RERA ID UPRERAPRM970). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted PRATEEK GRAND CITY WALK (CARNESIA) more time to complete?
UPRERA's record carries 1 completion extension for PRATEEK GRAND CITY WALK (CARNESIA), the latest running to 30 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does PRATEEK GRAND CITY WALK (CARNESIA) have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is PRATEEK GRAND CITY WALK (CARNESIA) located?
PRATEEK GRAND CITY WALK (CARNESIA) is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in PRATEEK GRAND CITY WALK (CARNESIA)?
The unit plan filed with UPRERA lists OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
How many towers and units are planned in PRATEEK GRAND CITY WALK (CARNESIA)?
The approved unit plan describes 1 block and 0 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is PRATEEK GRAND CITY WALK (CARNESIA)?
About 0 units per acre: 0 planned units across 0.65 acres (2,627 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗