Prateek Grand City Mall

UPRERARegistered

Prateek Grand City Mall is a RERA-registered commercial project by PRATEEK REALTORS INDIA PRIVATE LIMITED in SIDDARTH VIHAR, Ghaziabad (RERA ID UPRERAPRJ123381). Registered with a completion deadline of 10 Nov 2030.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ123381
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start1 Apr 2026
Project duration56 months
AddressPRATEEK GRAND CITY MALL AT PLOT NO CP-01 PART OF PLOT NO. - 4/BS-01 & BS-05, SIDDARTH VIHAR, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressKK-12, KAVI NAGAR, GHAZIABAD, UTTAR PRADESH-201002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    UPAVP/BP/25-26/0643

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered25 May 2026
Original completion10 Nov 2030
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹66,000
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors71 · 1 · 6 (units from plan)
Homes · commercial units7 · 64 (shops and offices filed in the same plan)
  • SHOP64 90%
  • OTHER7 10%
ConfigurationUnitsCarpet area
OTHER7110-322
SHOP647-226
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Prateek Grand City Mall · OTHER, SHOP6717-322
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Anuj Agarwal Architects
License COA/96/1950
A-24 , Kaushambi, Ghaziabad, UP
Engineer
Optimum Design Pvt. Ltd.
B- 24, Sector - 67, Noida
Contractor
Prateek Infraprojects India Pvt. Ltd.
Basement C-177, Ramprashtha, Ghaziabad, UP
Sr.Development work declared to RERA
1Demarcation of Plots
THE PLOT NO. CP-01 PART OF PLOT NO.- 4/BS-01 AND BS/05 PRATEEK GRAND CITY, SIDDARTH VIHAR NH-24, GHAZIABAD (U.P.) HAD BEEN DEMARCATED AS PER THE SANCTIONED MAP ISSUED BY THE AUTHORITY
2Boundary Wall
1800 MM HIGH AND 115/230 MM THICK BOUNDARY WALL IS TO BE DEVELOPED AS PER DRAWINGS IN COMBINATION OF BRICKWORK, RCC AND STEEL. THE DIMENSIONS OF THE BOUNDARY WALL WILL BE AS PER THE DRAWING.
3Road Work
6000 MM WIDE INTERNAL ROADS ARE DESIGNED OF DIFFRENT R.O.W AS PER REQUIREMENTS . DEDICATED ENTRY, EXIT AND DROP-OFF ZONES, FIRE TENDER ROUTE AND PEDESTRIAN PATHWAYS ETC. WILL BE PROVIDED AS PER THE DRAWINGS. ROAD WORK IS PROPOSED WITH TRIMIX CONCRETE FLOORING AND PAVERS IN MIXED PATTERN
4Footpaths
1000 MM WIDE INTERNAL FOOT PATHS WILL BE PROVIDED AS PER THE LANDSCAPE PLAN. FOOTHPATH IS PROPOSED WITH STONE/KOTA/GRANITE FINISH/ INTERLOCKING PAVERS
5Water Supply Including Drinking Water Facilities
MUNICIPAL WATER SUPPLY WILL BE USED FOR DRINKING PURPOSE, DOMESTIC AND FIRE TANKS, RO SYSTEM WILL BE PROVIDED AS PER THE REQUIREMENT.
6Sewer System
PROVISION OF STP OF 100 KLD WILL BE PROVIDED, LOCATION, SIZE AND MANHOLE WILL BE AS PER THE DESIGN DRAWINGS..
7Drain
UPVC DRAINS WILL BE PROVIDED AS PER THE DESIGN CALCULATIONS, SIZES AND LOCATION WILL BE AS PER APPROVED DRAWING.
8Parks
COMMON GREEN LAWNS HAVE BEEN DESIGNED WITH THE HARD AND SOFT LANDSCAPE FOR RECREATIONAL ACTIVITIES
9Tree Planting
TOTAL 60 TREES ARE PROPOSED ALONG WITH BOUNDARY WALL AND IN GREEN AREAS AS PER SANCTIONED DRAWING
10Design For Electric Supply Including Street Lighting
2 NOS. ELECTRICITY TRANSFORMS OF CAPACITY 1000 KVA SHALL BE USED. SUPPLY INCLUDING STREET LIGHTING AND COMMAN AREA LIGHTING WILL BE AS PER CALCULATION AND DESIGNED DRAWING.
11Community Buildings
THE PROVISION OF COMMUNITY BUILDING IS NOT APPLICABLE IN OUR PROJECT AS PER THE SANCTIONED MAP BY NOIDA AUTHORITY
12Treatment and Disposal System of Sewage and Sullage water
THE PROVISION OF SEWAGE TREATMENT PLANT WITH THE CAPACITY OF 100 KLD IS PROPOSED AND TREATED WATER SHALL BE USED FOR FLUSHING AND IRRIGATION.
13Solid Waste Management And Disposal System
AN ORGANIC WASTE CONVERTER WILL BE PROVIDED WHICH HELPS TO CONVERT THE SOLID WASTE TO MANURE WILL BE USED IN LANDSCAPE AREA.
14Water Conservation System
LOW FLOW WATER FIXTURES WILL BE PROVIDED AND STP WATER WILL BE USED FOR IRRIGATION PURPOSE.
15Energy Management System Including Use of Renewable Energy
ENERGY-EFFICIENT LED LIGHTING AND STAR-RATED ELECTRICAL EQUIPMENT WILL BE INSTALLED AS PER DESIGN CALCULATIONS, SOLAR PANELS WILL BE PROVIDED SUPPORTING ELECTRICITY USE IN COMMON AREA LIGHTING.
16Fire Protection And Fire Safety System
AS PER NBC-2016, THE FIRE TENDER, SPRINKLER SYSTEM, SMOKE DETECTORS AND FIRE ALARM SYSTEM PROVIDED.
17Social Infrastructure And Other Public Amenities Including Public Health Services
SOCIAL INFRASTRUCTURE AND OTHER PUBLIC AMINITIES INCLUDING PUBLIC HEALTH SERVICES ARE PROVIDED AS PER BUILDING BYE LAWS .
18Emergency Evacuation Services
EMERGENCY EVACUATION SERVICES LIKE FIRE STAIRCASE, FIRE ALARM WILL BE PROVIDED AS PER THE BUILDING BYE LAWS
19Other Miscellaneous Work
OTHER MISCLLANEOUS WORK IS PROVIDED AS PER THE THE APPROVED DRAWINGS FROM THE AUTHORITY.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

6 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
3Nishant TyagiUPRERAAGT26209
4PROPSHOPUPRERAAGT10129
5SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
6subodh kumarUPRERAAGT16327
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Nov 2030.

Sanctioned by U.P. Awas Evam Vikas Parishad · 5,558 sqm of land · an approved plan of 1 block and 71 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
UPAVP/BP/25-26/064311 Nov 202510 Nov 203010 Nov 203310 Nov 2030
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
CP-01 PART OF PLOT NO. 04/BS - 01 AND BS-055558Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 4118
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · 1423
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New10 Apr 2026 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Apr 2026 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Apr 2026 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New10 Apr 2026 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New30 Apr 2026 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New30 Apr 2026 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New30 Apr 2026 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New10 Apr 2026 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Apr 2026 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New10 Apr 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New30 Apr 2026 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New30 Apr 2026 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New13 May 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New25 May 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2026-Q1 to 2026-Q2.

QuarterConstructionCertificates
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePRATEEK REALTORS INDIA PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM970
PANAAFCP2689G
CIN / TANU70101DL2009PTC197028
Name of chairmanPRASHANT KUMAR TIWARI
Registered addressKK-12, KAVI NAGAR, GHAZIABAD, UTTAR PRADESH-201002
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
PRIPL PRATEEK GRAND CITY MALL COLL ACBankHDFC BANK LTD.BranchGhaziabad-IndrapuramBranch addressG-2 & 3,Windsor Park, 5 Vaibhav Khand, Indrapuram, GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000590Branch emailRAGHWENDRA.MISHRA@HDFCBANK.COM
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
PRIPL PRATEEK GRAND CITY MALL SEP ACBankHDFC Bank Ltd.BranchGhaziabad-IndrapuramBranch addressG 2 and 3,Windsor Park,5 Vaibhav Khand, Indrapuram, GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000590
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
PRIPL PRATEEK GRAND CITY MALL TR ACBankHDFC Bank Ltd.BranchGhaziabad-IndrapuramBranch addressG 2 and 3, Windsor Park, 5 Vaibhav Khand, Indrapuram ,GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000590
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

7 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
15 Oct 2026
Promoter’s complaints tally (all their projects)490 (Under Registration - 3 ) → 491 (Under Registration - 4 )
changed in Estanzo’s record
11 Oct 2026
Promoter’s complaints tally (all their projects)490 (Under Registration - 4 ) → 490 (Under Registration - 3 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)490 (Under Registration - 5 ) → 490 (Under Registration - 4 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 4 ) → 490 (Under Registration - 5 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 5 ) → 489 (Under Registration - 4 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 6 ) → 489 (Under Registration - 5 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 11 Oct 2026 · 6 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Prateek Grand City Mall

Is Prateek Grand City Mall RERA registered?

Yes. Prateek Grand City Mall is registered with UPRERA under registration number UPRERAPRJ123381, registered on 25 May 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Prateek Grand City Mall?

The completion date filed with UPRERA is 10 Nov 2030. No completion certificate is on record yet.

Who is the builder of Prateek Grand City Mall?

PRATEEK REALTORS INDIA PRIVATE LIMITED is the promoter entity that filed Prateek Grand City Mall with UPRERA (promoter RERA ID UPRERAPRM970). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does Prateek Grand City Mall have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Prateek Grand City Mall located?

Prateek Grand City Mall is registered in SIDDARTH VIHAR, Ghaziabad, as filed with UPRERA.

What configurations are available in Prateek Grand City Mall?

The unit plan filed with UPRERA lists OTHER and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Prateek Grand City Mall?

The approved unit plan filed with UPRERA runs from 7 to 322 m² of carpet area (about 74 to 3,463 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Prateek Grand City Mall?

The approved unit plan describes 1 block and 71 units of which 7 are homes and 64 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Prateek Grand City Mall?

About 52 units per acre: 71 planned units across 1.37 acres (5,558 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.