PRATEEK GRAND BEGONIA (PHASE II)

UPRERARegistered

PRATEEK GRAND BEGONIA (PHASE II) is a RERA-registered residential project by PRATEEK REALTORS INDIA PRIVATE LIMITED in Siddharth Vihar, NH-24, Ghaziabad, Ghaziabad (RERA ID UPRERAPRJ863272). Registered with a completion deadline of 10 Jun 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q4'24
—Q1'25
—Q2'25
100%Q3'25
3.9%Q4'25
20%Q1'26
8.86%Q2'26
—Q3'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ863272
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryU.P. Awas Evam Vikas Parishad
Proposed start11 Jun 2024
Project duration60 months
AddressPart of Plot No. 4/BS-01 and BS-05, Siddharth Vihar, NH-24, Ghaziabad, Ghaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressKK-12, KAVI NAGAR, GHAZIABAD, UTTAR PRADESH-201002
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    UPAVP/BP/22-23/1428

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Sept 2024
Original completion10 Jun 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹1,31,500
Sanctioning authorityU.P. Awas Evam Vikas Parishad

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors1,223 · 6 · 35 (units from plan)
  • 2 BHK739 60%
  • 3 BHK484 40%
ConfigurationUnitsCarpet area
2 BHK73958-73
3 BHK48485-122
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
B11 · OTHER, 2 BHK3525558-73
B12 · OTHER, 2 BHK, 3 BHK3122473-85
B5 · OTHER, 2 BHK3525658-73
B6 · OTHER, 2 BHK, 3 BHK3223273-85
BI 10 · OTHER, 3 BHK35128102-122
BI 9 · OTHER, 3 BHK35128102-122
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Anuj Agarwal Architects
License COA/96/1950
A-24 Kaushambi, Ghaziabad, UP
Engineer
VMS Consultant Pvt. Ltd.
83/84 Sakhar Bhawan, 230 Nariman Point, Mumbai-400021
Contractor
Prateek Infraprojects India Pvt. Ltd.
Basement C-177, Ramprastha, Ghaziabad, UP
Sr.Development work declared to RERA
1Demarcation of Plots
Part of Plot No. 4/ BS-01 and BS-05, Siddharth Vihar, NH-24, Ghaziabad
2Boundary Wall
Combination of RCC and MS Work upto 2.4 metre with peripheral tree plantation along boundary
3Road Work
Combination of Concrete pavers and stone work with design pattern
4Footpaths
Footpaths are made up of stone to connect the entire project with entrance lobbies, parks
5Water Supply Including Drinking Water Facilities
Water supply connection will be provided by UPAVP (Uttar Pradesh Avas Evam Vikas Parishad), Ghaziabad and will be connected to project under ground tank and then distributed to Over head tank and then to individual flats
6Sewer System
Sewer water will be treated in the proposed project Sewage Treatment Plant of capacity 1860 KLD.
7Drain
Storm water will be connected to Rain Harvesting System provided as per norms
8Parks
Parks/ Green areas will be developed as per Sanctioned plan
9Tree Planting
Different evergreen and ornamental trees, shrubs, groundcovers, creepers will be provided with peripheral boundary plantation as proposed.
10Design For Electric Supply Including Street Lighting
Electric supply will be provided by UPPVVNL
11Community Buildings
Community building is provided with facilities like Swimming Pool, Gymnasium, Reading room, Well equipped play areas for kids, Yoga
12Treatment and Disposal System of Sewage and Sullage water
Sewage and sullage water will be treated in the proposed project sewage treatment plant of capacity 1860 KLD.
13Solid Waste Management And Disposal System
Solid waste management area will be provided as per norms in Basement with all required equipments
14Water Conservation System
All water from Hardscape, Terraces, Internal roads will be connected to Rain Water Harvesting pit to recharge groundwater.
15Energy Management System Including Use of Renewable Energy
Solar energy system/photovoltaic will be placed at terrace level to cater the energy needs of common areas and landscape.
16Fire Protection And Fire Safety System
Fire fighting systems will be provided as per fire norms with fire hose reels, proper placement of Fire sprinklers and smoke detectors and Fire Alarm system
17Social Infrastructure And Other Public Amenities Including Public Health Services
Multipurpose hall, GYM, TT Room, Swimming pool, Kids Play Area, Parks etc
18Emergency Evacuation Services
Building premises are equipped with fire staircases, fire shafts, and fire hose reels and other necessary equipments, fire tender route is provided in entire site as per norms.
19Other Miscellaneous Work
N/A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1PROPSHOPUPRERAAGT10129
2Samresh Kumar Jha/The PRIDE DeveloperUPRERAAGT24317
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 10 Jun 2029.

Sanctioned by U.P. Awas Evam Vikas Parishad · 25,295 sqm of land · an approved plan of 6 blocks and 1223 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
UPAVP/BP/22-23/14289 May 202410 Jun 202910 Jun 203210 Jun 2029
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

19 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Plot No. BS-4/BS-01, Siddharth Vihar, Ghaziabad97565.68Plot
Plot No.4/ BS-05, Siddharth Vihar, Ghaziabad57350.828Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · Registry No. 4118, Book No. 1 ZILD No. 4390, Page No. 367 to 396
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Lease deed · Registry No. 1423, Book No. 1, ZILD No. 4191, Page No. 15 to 54
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New27 Jul 2024 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New20 Jun 2024 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New12 Sept 2024 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New20 Jun 2024 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New20 Jun 2024 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New20 Jun 2024 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New20 Jun 2024 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New20 Jun 2024 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New29 Jul 2024 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New26 Aug 2024 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New20 Jun 2024 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New20 Jun 2024 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New7 Sept 2024 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New20 Jun 2024 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2024-Q1 to 2026-Q2.

QuarterConstructionCertificates
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q2100%CA ↗ · Arch ↗ · Eng ↗
2025-Q33.9%CA ↗ · Arch ↗ · Eng ↗
2025-Q420%CA ↗ · Arch ↗ · Eng ↗
2026-Q18.86%CA ↗ · Arch ↗ · Eng ↗
2026-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePRATEEK REALTORS INDIA PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM970
PANAAFCP2689G
CIN / TANU70101DL2009PTC197028
Name of chairmanPRASHANT KUMAR TIWARI
Registered addressKK-12, KAVI NAGAR, GHAZIABAD, UTTAR PRADESH-201002
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
PRIPL PRATEEK GRAND BEGONIA PH2 COLL ACBankHDFC BANK LTD.BranchINDIRAPURAM, GHAZIABADBranch addressG2 and G3 WINDSOR PARK, 5 VAIBHAV KHAND, INDIRAPURAM, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000590Branch emailRAGHWENDRA.MISHRA@HDFCBANK.COM
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
PRIPL PG BEGONIA PH2 SEPRATE RERA A/CBankHDFC BANK LTD.BranchINDIRAPURAM, GHAZIABADBranch addressG2 and G3 WINDSOR PARK, 5 VAIBHAV KHAND, INDIRAPURAM, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000590
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
PRIPL PG BEGONIA PH2 TR ACBankHDFC BANK LTD.BranchINDIRAPURAM, GHAZIABADBranch addressG2 and G3 WINDSOR PARK, 5 VAIBHAV KHAND INDIRAPURAM, GHAZIABADBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000590
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

7 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Quarterly progress report
2026-Q2
QPR 2026-Q2
newly filed with RERA
15 Oct 2026
Promoter’s complaints tally (all their projects)490 (Under Registration - 3 ) → 491 (Under Registration - 4 )
changed in Estanzo’s record
11 Oct 2026
Promoter’s complaints tally (all their projects)490 (Under Registration - 4 ) → 490 (Under Registration - 3 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)490 (Under Registration - 5 ) → 490 (Under Registration - 4 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 4 ) → 490 (Under Registration - 5 )
changed in Estanzo’s record
1 Sept 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 5 ) → 489 (Under Registration - 4 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)489 (Under Registration - 6 ) → 489 (Under Registration - 5 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 11 Oct 2026 · 6 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about PRATEEK GRAND BEGONIA (PHASE II)

Is PRATEEK GRAND BEGONIA (PHASE II) RERA registered?

Yes. PRATEEK GRAND BEGONIA (PHASE II) is registered with UPRERA under registration number UPRERAPRJ863272, registered on 14 Sept 2024. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for PRATEEK GRAND BEGONIA (PHASE II)?

The completion date filed with UPRERA is 10 Jun 2029. No completion certificate is on record yet.

Who is the builder of PRATEEK GRAND BEGONIA (PHASE II)?

PRATEEK REALTORS INDIA PRIVATE LIMITED is the promoter entity that filed PRATEEK GRAND BEGONIA (PHASE II) with UPRERA (promoter RERA ID UPRERAPRM970). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does PRATEEK GRAND BEGONIA (PHASE II) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PRATEEK GRAND BEGONIA (PHASE II) located?

PRATEEK GRAND BEGONIA (PHASE II) is registered in Siddharth Vihar, NH-24, Ghaziabad, Ghaziabad, as filed with UPRERA.

What configurations are available in PRATEEK GRAND BEGONIA (PHASE II)?

The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in PRATEEK GRAND BEGONIA (PHASE II)?

The approved unit plan filed with UPRERA runs from 58 to 122 m² of carpet area (about 627 to 1,312 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in PRATEEK GRAND BEGONIA (PHASE II)?

The approved unit plan describes 6 blocks and 1,223 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is PRATEEK GRAND BEGONIA (PHASE II)?

About 196 units per acre: 1,223 planned units across 6.25 acres (25,295 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗