RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ961945
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGorakhpur Development Authority
Proposed start1 Jan 2022
Project duration36 months
AddressGorakhpur, Gorakhpur
TehsilGorakhpur
Applicant typeCompetent authority
Applicant addressTaramandal, Deoria Byepass Road, Gorakhpur
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    1/GORAKSH ENCLAVE/26.10.2021

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  6. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered6 Dec 2021
Original completion31 Dec 2024
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary8 Apr 2025
Registration fee₹27,000
Sanctioning authorityGorakhpur Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors87 · 2 · 8 (units from plan)
Homes · commercial units86 · 1 (shops and offices filed in the same plan)
  • 3 BHK42 48%
  • 2 BHK40 46%
  • 4 BHK4 5%
  • SHOP1 1%
ConfigurationUnitsCarpet area
2 BHK4060-66
3 BHK4287-99
4 BHK4108-120
SHOP152
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
A · 2 BHK, 3 BHK, 4 BHK76560-120
B · 3 BHK, SHOP82252-89
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Manish Kumar Mishra
License CA/2010/50215
DIALOGIC ARCHITECTS, Shop no. 07, First Floor, Jalkal Building, Golghar, Gorakhpur, U.P.-273001
Engineer
Akhilesh Kumar Singh
ATS Structural Consultants, D-27, Indira Nagar, Lucknow-226016
Contractor
NA WORK NOT AWARDED
NA WORK NOT AWARDED
Sr.Development work declared to RERA
1Demarcation of Plots
The area has been demarcated.
2Boundary Wall
There is a provision for boundary wall in the project.
3Road Work
Bituminous/Cement concrete roads have been provisioned.
4Footpaths
The footpath is proposed alongside the roads with services Manholes at intervals.
5Water Supply Including Drinking Water Facilities
Boreholes will be provided for the water supply.
6Sewer System
Sewerage network as per design will be set up.
7Drain
Drain as per design shall be constructed.
8Parks
Parks shall be developed in the scheme.
9Tree Planting
Trees shall be planted within open spaces and parks.
10Design For Electric Supply Including Street Lighting
Electrical load as per sanctioned UPPCL drawing shall be implemented.
11Community Buildings
Clubhouse, Gym, Grocery store and society office is provided in the group housing.
12Treatment and Disposal System of Sewage and Sullage water
An STP is proposed on the campus for the treatment of sewage.
13Solid Waste Management And Disposal System
Bins with the demarcation of organic and inorganic waste will be provided on the campus.
14Water Conservation System
NA
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
Taken as necessary.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
N/A
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 25 Oct 2026.

Sanctioned by Gorakhpur Development Authority · 4,314 sqm of land · an approved plan of 2 blocks and 87 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
1/GORAKSH ENCLAVE/26.10.202126 Oct 202125 Oct 202625 Oct 202931 Dec 2024
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
Bilandpur 249 MI1092.96Khasra
Rasoolpur 791943.04Khasra
Rasoolpur 80 MI637.68Khasra
Rasoolpur 128 MI202.40Khasra
Rasoolpur 129 MI445.28Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New29 Oct 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New29 Oct 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New29 Oct 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New29 Oct 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New29 Oct 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New29 Oct 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New29 Oct 2021 ↗

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGorakhpur Development Authority
RolePromoter · current
RERA IDUPRERAPRM14553
PANAAATG7071M
CIN / TANALDG00312E
Registered addressTaramandal, Deoria Byepass Road, Gorakhpur
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gorakhpur

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
GORAKHPUR DEVELOPMENT AUTHORITYBankSTATE BANK OF INDIABranchMAIN BRANCHBranch addressTaramandal GorakhpurBranch districtGorakhpurA/C no.IFSCSBIN0000086
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
GORAKHPUR DEVELOPMENT AUTHORITYBankSTATE BANK OF INDIABranchMAIN BRANCHBranch addressTARAMANDAL GORAKHPPURBranch districtGorakhpurA/C no.IFSCSBIN0000086
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
GORAKHPUR DEVELOPMENT AUTHORITYBankSTATE BANK OF INDIABranchMAIN BRANCHBranch addressTARAMANDAL ROADBranch districtGorakhpurA/C no.IFSCSBIN0000086
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE)

Is GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE) RERA registered?

Yes. GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE) is registered with UPRERA under registration number UPRERAPRJ961945, registered on 6 Dec 2021. Estanzo reproduces that filing; it does not verify the work behind it.

Has GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE) been completed?

UPRERA still lists GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE) as Registered, so it is not shown as completed here. A completion certificate dated 8 Apr 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE)?

Gorakhpur Development Authority is the promoter entity that filed GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE) with UPRERA (promoter RERA ID UPRERAPRM14553). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE) located?

GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE) is registered in Gorakhpur, as filed with UPRERA.

What configurations are available in GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE)?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK, 4 BHK and SHOP. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE)?

The approved unit plan filed with UPRERA runs from 52 to 120 m² of carpet area (about 555 to 1,296 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE)?

The approved unit plan describes 2 blocks and 87 units of which 86 are homes and 1 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GROUP HOUSING SCHEME AT RAMGARHTAL (GORAKSH ENCLAVE)?

About 82 units per acre: 87 planned units across 1.07 acres (4,314 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.