GULSHAN DYNASTY MORADABAD

UPRERARegistered

GULSHAN DYNASTY MORADABAD is a RERA-registered residential project by GULSHAN HOMZ PRIVATE LIMITED in Moradabad (RERA ID UPRERAPRJ686395). Registered with a completion deadline of 31 Aug 2027.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
11.29%Q3'25
11.29%Q4'25
11.29%Q1'26
11.64%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ686395
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMoradabad Development Authority
Proposed start1 Jul 2023
Project duration50 months
AddressMoradabad, Moradabad
TehsilMoradabad
Applicant typeCompany
Applicant address121,Hargovind Enclave, Delhi 110092
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    Group Housing/01999/MBDA/22-23/0414/08052023

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered4 Nov 2023
Original completion31 Aug 2027
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹2,55,500
Sanctioning authorityMoradabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors103 · 46 · 1 (units from plan)
Homes · commercial units90 · 13 (shops and offices filed in the same plan)
  • OTHER90 87%
  • SHOP13 13%
ConfigurationUnitsCarpet area
SHOP1395-659
OTHER90545-555
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
BLOCK AB - 1 · OTHER12555
BLOCK AB - 10 · OTHER12555
BLOCK AB - 11 · OTHER12555
BLOCK AB - 12 · OTHER12555
BLOCK AB - 13 · OTHER12555
BLOCK AB - 14 · OTHER12555
BLOCK AB - 15 · OTHER12555
BLOCK AB - 16 · OTHER12555
BLOCK AB - 17 · OTHER12555
BLOCK AB - 18 · OTHER12555
BLOCK AB - 19 · OTHER12545
BLOCK AB - 2 · OTHER12555
BLOCK AB - 20 · OTHER12555
BLOCK AB - 21 · OTHER12555
BLOCK AB - 22 · OTHER12555
BLOCK AB - 23 · OTHER12555
BLOCK AB - 24 · OTHER12555
BLOCK AB - 25 · OTHER12555
BLOCK AB - 26 · OTHER12555
BLOCK AB - 27 · OTHER12555
BLOCK AB - 28 · OTHER12555
BLOCK AB - 29 · OTHER12555
BLOCK AB - 3 · OTHER12555
BLOCK AB - 30 · OTHER12555
BLOCK AB - 31 · OTHER12555
BLOCK AB - 32 · OTHER12555
BLOCK AB - 33 · OTHER12555
BLOCK AB - 34 · OTHER12555
BLOCK AB - 35 · OTHER12555
BLOCK AB - 36 · OTHER12555
BLOCK AB - 37 · OTHER12555
BLOCK AB - 38 · OTHER12555
BLOCK AB - 39 · OTHER12555
BLOCK AB - 4 · OTHER12555
BLOCK AB - 40 · OTHER12555
BLOCK AB - 41 · OTHER12555
BLOCK AB - 42 · OTHER12555
BLOCK AB - 43 · OTHER12555
BLOCK AB - 44 · OTHER12555
BLOCK AB - 45 · OTHER12555
BLOCK AB - 5 · OTHER12555
BLOCK AB - 6 · OTHER12555
BLOCK AB - 7 · OTHER12555
BLOCK AB - 8 · OTHER12555
BLOCK AB - 9 · OTHER12555
COMMERCIAL BLOCK · SHOP11395-659
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Vishal sharma
License CA/98/23261
B-421, New Friends Colony, New Delhi - 110065
Engineer
Dr. Gyan Singh
T17, Aditya city Centre, 3rd Floor, Vaibahv khand, Indirapuram Ghaziabad (UP) - 201014
Contractor
Gulshan Homz Private Limite
Plot No-2C, GC Grand, Vaibhav khand Indirapuram, Ghaziabad Uttar Pradesh, 201014
Sr.Development work declared to RERA
1Demarcation of Plots
As per lease plan.
2Boundary Wall
2.4m high boundary wall. Consists of brickwork with stone cladding up to 1.5m Form 1.5m to 2.4m , is constructed out of MS members.
3Road Work
7.5 m wide internal pathway finished in a combination of stone slabs and green scaping.
4Footpaths
stone paving as per landscape architect s intent.
5Water Supply Including Drinking Water Facilities
Municipal water supply is collected in an underground storage reservoir. Underground storage of water is also required and reserve for firefight purpose. It is proposed to provide static storage for firefighting as per the present requirement of NCB. To prevent the stagnation of the water in the static storage tank, water will overflow into the storage chamber for the domestic requirement. This system would ensure the availability of static storage for firefighting all the times. It is proposed to provide 01 day storage for total water requirement . Over head storage tanks are proposed to be placed on the terrace . It is proposed to have approximately half day requirement storage in the domestic and flushing water storage chamber. In addition, there would be static storage for firefighting purposes also, as per national Building Code.
6Sewer System
The soil and from toilets and kitchen will be collected in single network of sewer pipes running under the basement celling . It is proposed to install sewage treatment plant on the site for treatment of sewage.
7Drain
The terrace and balconies of the buildings are proposed to be drained by means of down take pipes while open areas and roads would be drained into drains. These drains are proposed to be aligned along the roads within the Complex as per the landscape design The down take pipes from terraces and balconies would discharge into or over an inlet to the surface drains of the Complex. The drains shall be finally discharged into the municipal drainage system after passing through rain water harvesting and ground water recharging structures.
8Parks
Landscaping of the parks with plantation including trees shrubs and ground covers and recreational benches and walkway proposed landscape area in the project is 4320 sqmt.
9Tree Planting
As per landscape drawing.
10Design For Electric Supply Including Street Lighting
The building shall be suppled power by the State Electricity Board. Since the source is unstable due to frequent brown out /black out , it is proposed that full DG power backup shall be provided to all the common services and apartments. .Some critical load such as a emergency lighting, headed equipment of ELV system etc., shall be additionally backed up using UPS (Battery backup) system. The electrical power requirement for the project has been estimated based on (at the rate) 50 watt/sq. mtr of FAR area of the apartment.(as per UP electricity authority). Lighting for streets car park area , landscape areas, walkways (both covered and uncovered) shall be controlled by static timer for energy saving. LED shall be used to in all common area and external lighting yo reduce power consumption.
11Community Buildings
Club house as per plan having Multi purpose Hall, Gym, Gaming zone, cafeteria, spa/salon, senior lounge etc,
12Treatment and Disposal System of Sewage and Sullage water
It is proposed to install sewage treatment plant on the site for treatment of sewage. The quantity of recycle water required in flushing, horticulture shall be treatment up to tertiary level and the balance waste shall be discharged into municipal drainage system after treatment. total capacity of sewage Treatment plant =100 KLD
13Solid Waste Management And Disposal System
Segregation of soild waste
14Water Conservation System
a. The operation of pumps will be based on level sensors to ensure that water is not wasted and to avoid unnecessary operation of the equipment. b. Pumps and equipment will be selected on "best" energy efficiency point. c. water Conservation will be provided using low flow fixtures / flow restrictors. d. Dual-flushing cisterns will reduce water consumption. The tower consumption in dual flush will be (at the rate)maximum 3 liters for low flush and (at the rate)6 liters for high flush. e. Sensor based urinals will be install to ensure flushing only when in use to reduce the water consumption. f. provision of sewage treatment plant is proposed to treat 100 percent waste water generated. g. Recycle of treated effluent will reduce the total net fresh water demand of the project. Thereby reducing the load and dependency on municipal supply. h. Irrigation system management will be provided by providing latest irrigation systems i.e. sprinkler system, time based controller , water metering etc. to reduce the water consumption in horticulture. i. rain water harvesting and ground water recharging for roof and non-roof areas is provided. The total volumetric capacity of recharge structures shall be as required by the regulations. j. Water metering will be provided for landscape water consumption, treated waste consumption , swimming pool and water fountain consumption and bot water consumption through system.
15Energy Management System Including Use of Renewable Energy
a. ALL lifts shall be provided with AC variable voltage, variable frequency drives (ACVVF). b. Power factor shall be maintained 0.90 to unity. c. timer shall be used switch on / off parking lights during non- peak hours for power conservation . d. LED shall be used to in all common area and external lighting to reduce power consumption. e. Controller based synchronization along with PLC based load management is proposed to reduce the oil consumption and effective utilization of DG Sets. f. All DG Sets will be CPCB certified for noise and emissions. g. The exhaust pipes of DG Sets will be taken up as per CPCB guide lines. h. lighting power density ( LPD) values of all common areas and external / street lighting will be maintained at or below ECBC value by providing energy efficient light fixtures and LED s. The lux levels will be provided as per NCB. I. Metering will be install on all sub feeders related to common services viz. Water supply Pumps, Firefighting pumps, Sewage treatment plant, Elevators, Ventilation, External area lighting etc. j. Pump should be BEE 4-star rated or minimum 7percent efficiency for pumps of capacity greater than 3 HP and ISI certified pumps for other and motor should be BEE4-star rated or minimum 85 percent efficiency for motors of capacity greater than 3HP and ISI certified motors for others. k. Low loss transformers will Provided as per latest Is 1180 (2014) Part-1 (latest ammendment with energy efficiency level -1 . I. The exit signage power consumption shall be less than 5 watt/face
16Fire Protection And Fire Safety System
The entire mix land use project has been divided in to tow zones depending upon its usages and category , Zone I- One or tow family private dwellings residential building less than 15m in height Zone-II - Club house Assembly building Above than 10m But not exceeding 15 m in height . the entire fire safety installation shall be compliant with the most stringent codes standard for the entire Township to ensure the highest safety standard and uniformity of system Refer NB C- 2016 attachement for reference. interanal and external fire hydrant system shall be provided with landing valve, hose reel with shut off nozzle, short branch pipe With nozzle and fire mans axe. Automatic Sprinkler system is provided The system shall be suitably zoned for its Optimum requiremests In oreder to detect the fire/smoke in incipient stages an intelligent/ Addressable automatic fire detection alarm system is proposed to be provided to cover all areas to provide timely waring to accupants to evacuate safely before the fire/ smoke spreads. The system shall be fully zoned addressable digital self diagnostic and cover all internal and external areas.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Club swimming pool etc.
18Emergency Evacuation Services
Fire starecase to be provided as per sanction plan
19Other Miscellaneous Work
Not Availble
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 22 Jun 2028.

Sanctioned by Moradabad Development Authority · 49,903 sqm of land · an approved plan of 46 blocks and 103 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
Group Housing/01999/MBDA/22-23/0414/0805202323 Jun 202322 Jun 202822 Jun 203131 Aug 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
GH-10, Sector 04, New Moradabad55085Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 9467
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Merger Order of Sunglow with Jainco
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · MDA Mutation Certificate in the name of JAINCO
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · 3630
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · PMAY UP New Policy 2018
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 449
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New3 Aug 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New3 Aug 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New3 Aug 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New18 Aug 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New3 Aug 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New18 Aug 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New3 Aug 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New3 Aug 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New3 Aug 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New3 Aug 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New3 Aug 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New3 Aug 2023 ↗

Quarterly progress reports

12 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

12 quarterly progress reports are on file with UPRERA, covering 2023-Q2 to 2026-Q1.

QuarterConstructionCertificates
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q211.29%CA ↗ · Arch ↗ · Eng ↗
2025-Q311.29%CA ↗ · Arch ↗ · Eng ↗
2025-Q411.29%CA ↗ · Arch ↗ · Eng ↗
2026-Q111.64%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGULSHAN HOMZ PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM11443
PANAABCG5922F
CIN / TANU70109DL1997PTC084494
Name of chairmanSh.Gulshan Nagpal , Sh.Deepak Kapoor, Smt.Ritu Nag
Registered address121,Hargovind Enclave, Delhi 110092
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameJAINCO DEVELOPERS PRIVATE LIMITED
RoleCo-promoter
Applicant typeCompany
AddressShop No. G-2 Ground Floor, Plot No 5, Sikka Complex, Community Center, Preet Vihar Delhi 110092
RERA contact

Nearby projects

Moradabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Gulshan Homz Private Limited Collection A/C Gulshan Dyanasty MoradabadBankICICI BANK LTDBranchMORADABADBranch addressICICI BANK LTD PLOT NO 409 MOHALLA CHAWANI NEAR MAHILA POLICE STATION, CIVIL LINE MORADABADBranch districtMoradabad, Uttar PradeshA/C no.IFSCICIC0000190
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Gulshan Homz Private Limited Separate A/C For Gulshan Dynasty MoradabadBankICICI BANK LTDBranchMoradabadBranch addressICICI BANK LTE PLOTE NO 409 MOHALLA CHAWANI NEAR MAHILA POLICE STATION, CIVIL LINES, MORADABADBranch districtMoradabad, Uttar PradeshA/C no.IFSCICIC0000190
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Gulshan Homz Private Limited Transaction A/C For Gulshan Dynasty MoradabadBankICICI BANK LTDBranchMORADABADBranch addressICICI BANK LTD PLOT NO 409 MOHALLA CHAWANI NEAR MAHILA POLICE STATION, CIVIL LINES, MORADABADBranch districtMoradabad, Uttar PradeshA/C no.IFSCICIC0000190
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)40 (Under Registration - 1 ) → 40 (Under Registration - 0 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)39 (Under Registration - 0 ) → 40 (Under Registration - 1 )
changed in Estanzo’s record
5 Sept 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about GULSHAN DYNASTY MORADABAD

Is GULSHAN DYNASTY MORADABAD RERA registered?

Yes. GULSHAN DYNASTY MORADABAD is registered with UPRERA under registration number UPRERAPRJ686395, registered on 4 Nov 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for GULSHAN DYNASTY MORADABAD?

The completion date filed with UPRERA is 31 Aug 2027. No completion certificate is on record yet.

Who is the builder of GULSHAN DYNASTY MORADABAD?

GULSHAN HOMZ PRIVATE LIMITED is the promoter entity that filed GULSHAN DYNASTY MORADABAD with UPRERA (promoter RERA ID UPRERAPRM11443). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does GULSHAN DYNASTY MORADABAD have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is GULSHAN DYNASTY MORADABAD located?

GULSHAN DYNASTY MORADABAD is registered in Moradabad, as filed with UPRERA.

What configurations are available in GULSHAN DYNASTY MORADABAD?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in GULSHAN DYNASTY MORADABAD?

The approved unit plan filed with UPRERA runs from 95 to 659 m² of carpet area (about 1,017 to 7,090 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in GULSHAN DYNASTY MORADABAD?

The approved unit plan describes 46 blocks and 103 units of which 90 are homes and 13 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is GULSHAN DYNASTY MORADABAD?

About 8 units per acre: 103 planned units across 12.33 acres (49,903 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗