Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ14980
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Sept 2017
Project duration94 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address101, Kalpataru Synergy, Opp Grand Hyatt, Santacruz (E), Mumbai 400055
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (4)

  2. 5 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Registered with RERA

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. Completion certificate filed

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  10. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered22 Jan 2018
Original completion30 Dec 2023
Revised completion28 Jun 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary10 Apr 2025
Registration fee₹60,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors252 · 2 · 34 (units from plan)
  • 4 BHK127 50%
  • 3 BHK120 48%
  • OTHER4 2%
  • 5 BHK1 <1%
ConfigurationUnitsCarpet area
3 BHK120149-196
4 BHK127149-198
5 BHK1197
OTHER4286-286
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower A · 3 BHK, 4 BHK, 5 BHK, OTHER30118149-286
Tower B · 3 BHK, 4 BHK, OTHER34134149-286
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Liaison Architect - Rajiv Goel ( R N Gupta & Associates) & Design Architect – Rajinder Kumar (Rajinder Kumar & Associates)
License CA/76/2361 & CA/75/2490
Design Architect - B-6/17, Shopping Centre, Safdarjung Enclave, Delhi 110029,  Liaison Architect - R. N. Gupta & Assosiates, E1, Sector 55, Nodia
Engineer
Optimal Consultancy Services Pvt Ltd
216 A/13 Gautam Nagar, New Delhi -110049
Contractor
JMC Projects India Limited
Okaya Centre, Tower 3, 3-4 Floors, Sector 62, Noida-201301, Uttar Pradesh
Sr.Development work declared to RERA
1Demarcation of Plots
As per approved plan
2Boundary Wall
As per approved plan
3Road Work
As per approved plan
4Footpaths
Not Applicable
5Water Supply Including Drinking Water Facilities
Supply from Local Authority
6Sewer System
Refer attached waste disposal plan
7Drain
Storm water drain planned and shall be connected to system of Wishtown project
8Parks
Not Applicable
9Tree Planting
As per approved plan/Landscape Design
10Design For Electric Supply Including Street Lighting
Refer attached electrical layout
11Community Buildings
Community area/centre and recreational facilities as per AFS
12Treatment and Disposal System of Sewage and Sullage water
Shall be treated at central STP located within the Wishtown project
13Solid Waste Management And Disposal System
Project shall have waste segregaton area and OWC for treatment of organic waste
14Water Conservation System
Shall be done as per statuary requirment
15Energy Management System Including Use of Renewable Energy
LED lights and timmer control panels shall be used for efficient energy management
16Fire Protection And Fire Safety System
Fire Fighting Facility as per CFO approvals
17Social Infrastructure And Other Public Amenities Including Public Health Services
Not Applicable
18Emergency Evacuation Services
Emergency Evacuation Service as per CFO approval(s)
19Other Miscellaneous Work
Not Applicable
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

19 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3BUNIYAD REALTY LIMITED (Formerly BUNIYAD RETAIL INDIA PRIVATE LIMITED)UPRERAAGT11569
4GATEWAY PROPMART PVT LTDUPRERAAGT10384
5Gharondha Estates & financial consultantsUPRERAAGT13048
6IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
7Innovance Realty Private LimitedUPRERAAGT13354
8KAPUR ESTATESUPRERAAGT11301
9LINK PROPERTIESUPRERAAGT10081
10MUKUL ARORAUPRERAAGT14461
11PRIME ESTATESUPRERAAGT11881
12PROPCASA CONSULTANCY PVT. LTD.UPRERAAGT10038
13SAMS GROUPUPRERAAGT10084
14SANJAY KUMAR SIROHI C/O SIROHI ESTATESUPRERAAGT12885
15SMC Real Estate Advisors Private LimitedUPRERAAGT10113
16Stalwart Realty LLPUPRERAAGT12657
17SUNIL JULKAUPRERAAGT11642
18Tarun JainUPRERAAGT11119
19URBAN AVENUES LLPUPRERAAGT10834
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

5 permits

An approval and the date it runs to - not proof the work matching it was done.

5 sanctioning permits are on record with UPRERA, the latest valid to 27 Jul 2022. 4 of them carry a revalidation, the latest valid to 31 Dec 2025.

Sanctioned by Noida Authority · 10,920 sqm of land · an approved plan of 2 blocks and 252 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
Noida/CAP/2017/III-297/98728 Jul 201727 Jul 202230 Dec 202330 Dec 2023—
Noida/CAP/2017/III-297/98728 Jul 201727 Jul 202231 Dec 202529 Jun 202428 Jul 2017
valid to 31 Dec 2025
Noida/CAP/2017/III-297/98728 Jul 201727 Jul 202231 Dec 202529 Jun 202428 Jul 2017
valid to 31 Dec 2025
Noida/CAP/2017/III-297/98728 Jul 201727 Jul 202231 Dec 202528 Jun 202528 Jul 2017
valid to 31 Dec 2025
Noida/CAP/2017/III-297/98728 Jul 201727 Jul 202231 Dec 202528 Jun 202528 Jul 2017
valid to 31 Dec 2025
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 28 Jun 2025.

#Granted fromExtended uptoNote
130 Dec 202329 Jun 2024Six months extension in view of force majeure caused by covid-19 pandemic
229 Jun 202428 Jun 2025—

Land & documents

18 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
B 24C Wishtown, Sector 128, Noida10920—
B 24C, Whistown, Sector 12810920Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 31 Jul 2017.

Registry no.DateTypeArea
Reg No.1, Bk no.7444,Page No.87-190 & Sr.No.530731 Jul 2017other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · Reg No.1, Bk no.7444, Page No.87-190 & Sr. No.5307
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New6 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Jul 2018 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Jul 2018 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New25 Aug 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old22 Jan 2018 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old22 Jan 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterSupply from local authority
Fire safety (as filed with RERA)Fire Fighting Facility as per approvals
Renewable energyAs per the requirement of Authority(s)
Other facilitiesCommunity area/centre and recreational facilities as per AFS

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

21 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

21 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q1.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameKalpataru Urbanscape LLP
RolePromoter · current
RERA IDUPRERAPRM31572
PANAARFK5877C
Name of chairmanNarendra Lodha (Designated Partner Nominee of Body
Registered address101, Kalpataru Synergy, Opp Grand Hyatt, Santacruz (E), Mumbai 400055
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Kalpataru Urbanscape LLP Collection Account for Kalpataru VistaBankIndusInd BankBranchNoidaBranch addressN 10-11, Sector 18, UP, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036Branch emailChirag.raheja indusInd.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Kalpataru Urbanscape LLP Separate Bank Account for Kalpataru VistaBankIndusInd BankBranchNoidaBranch addressN 10-11, Sector 18, UP, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036Branch emailChirag.raheja indusInd.com
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Kalpataru Urbanscape LLP RERA Transaction Account for Kalpataru VistaBankIndusInd BankBranchNoidaBranch addressN 10-11, Sector 18, UP, 201301Branch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0000036
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about Kalpataru Vista

Is Kalpataru Vista RERA registered?

Yes. Kalpataru Vista is registered with UPRERA under registration number UPRERAPRJ14980, registered on 22 Jan 2018. Estanzo reproduces that filing; it does not verify the work behind it.

Has Kalpataru Vista been completed?

UPRERA still lists Kalpataru Vista as Registered, so it is not shown as completed here. A completion certificate dated 10 Apr 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of Kalpataru Vista?

Kalpataru Urbanscape LLP is the promoter entity that filed Kalpataru Vista with UPRERA (promoter RERA ID UPRERAPRM31572). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Kalpataru Vista more time to complete?

UPRERA's record carries 2 completion extensions for Kalpataru Vista, the latest running to 28 Jun 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Kalpataru Vista have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Kalpataru Vista located?

Kalpataru Vista is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Kalpataru Vista?

The unit plan filed with UPRERA lists 3 BHK, 4 BHK, 5 BHK and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Kalpataru Vista?

The approved unit plan filed with UPRERA runs from 149 to 286 m² of carpet area (about 1,608 to 3,080 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Kalpataru Vista?

The approved unit plan describes 2 blocks and 252 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Kalpataru Vista?

About 93 units per acre: 252 planned units across 2.70 acres (10,920 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗