Konark Sun City P1 is a RERA-registered residential project by Konarkshine Industries Private Limited in Lucknow (RERA ID UPRERAPRJ562689). Registered with a completion deadline of 31 Dec 2026.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ562689 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Lucknow Development Authority |
| Proposed start | 1 Jan 2023 |
| Project duration | 48 months |
| Address | Mohanlalganj, Lucknow |
| Tehsil | Mohanlalganj |
| Applicant type | Company |
| Applicant address | 3/84, Vipul Khand Gomti Nagar, Lucknow-226020 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
Plotted Resi development / Plotted Housing/03510/LDA/LD/21-22/1649/11112021
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
- to
Extension granted
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 30 Jun 2023 |
| Original completion | 31 Dec 2025 |
| Revised completion | 31 Dec 2026 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹1,19,500 |
| Sanctioning authority | Lucknow Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots We have one plot of size 22900 sq. mtr.having 1 main entrance gate from the 18m wide front road. |
| 2 | Boundary Wall 2 m high and 115 mm thick Pre cost boundary wall & cloummn there would be a Logo of the project which give a beautiful iconic design to front boundary wall. |
| 3 | Road Work From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. |
| 4 | Footpaths We would not provide any footpath |
| 5 | Water Supply Including Drinking Water Facilities We will provide One nos. of pump for the requirement of blocks through underground pipelines. |
| 6 | Sewer System Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage |
| 7 | Drain Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line. |
| 8 | Parks We will provide green area with the different
activities and the green area will have gaming facilities for kids. |
| 9 | Tree Planting We will providemany type of trees all along the boundary wall & green area |
| 10 | Design For Electric Supply Including Street Lighting We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar . |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force. |
| 13 | Solid Waste Management And Disposal System There are a proper garbage collection area provided
for the solid waste management. |
| 14 | Water Conservation System We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level. |
| 15 | Energy Management System Including Use of Renewable Energy We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use. |
| 16 | Fire Protection And Fire Safety System We will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement. |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services All the exit roads are wide enough with main exit to facilitate an easy emergency exit. |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 10 Mar 2027.
Sanctioned by Lucknow Development Authority · 22,900 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| Plotted Resi development / Plotted Housing/03510/LDA/LD/21-22/1649/11112021 | 11 Mar 2022 | 10 Mar 2027 | 10 Mar 2030 | 31 Dec 2025 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 31 Dec 2026.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 31 Dec 2025 | 31 Dec 2026 | — |
Land & documents
21 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 213, 216, 218, 219, 220, 299,300, 214,215,217,301,223BA,297,298,231(P), 291, 295,296 | 22900 | Khasra |
| Sale deed · 19150 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10096 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10077 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6573 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 15628 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10717 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17599 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 10722 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · Land Area Chart An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 30 May 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 8 Jun 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 8 Jun 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 16 Jun 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 30 May 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 30 May 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 30 May 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 8 Jun 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 16 Jun 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 8 Jun 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 16 Jun 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 16 Jun 2023 ↗ |
Quarterly progress reports
14 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
14 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 55.67% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 59.46% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 75.12% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 87.74% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Konarkshine Industries Private Limited |
| Role | Promoter · current |
| RERA ID | UPRERAPRM239068 |
| PAN | AAFCK2565E |
| CIN / TAN | U70102UP2013PTC058450 |
| Name of chairman | Abhishek Srivastava |
| Registered address | 3/84, Vipul Khand Gomti Nagar, Lucknow-226020 |
| RERA contact | |
| Registered since | 2023 |
Nearby projects
Lucknow
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Konarkshine Industries Pvt Ltd Col AC Konark Sun City P1 R-1BankState Bank Of IndiaBranchCommercial BranchBranch address6A, Way Road, Gokhale Marg, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Konarkshine Industries Pvt Ltd Sep AC Konark Sun City P1 R-2BankState Bank Of IndiaBranchCommercial BranchBranch address6A, Way Road, Gokhale Marg, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Konarkshine Industries Pvt Ltd Txn AC Konark Sun City P1 R-3BankState Bank Of IndiaBranchCommercial BranchBranch address6A, Way Road, Gokhale Marg, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCSBIN0004166 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about Konark Sun City P1
Is Konark Sun City P1 RERA registered?
Yes. Konark Sun City P1 is registered with UPRERA under registration number UPRERAPRJ562689, registered on 30 Jun 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for Konark Sun City P1?
The completion date filed with UPRERA is 31 Dec 2026. No completion certificate is on record yet.
Who is the builder of Konark Sun City P1?
Konarkshine Industries Private Limited is the promoter entity that filed Konark Sun City P1 with UPRERA (promoter RERA ID UPRERAPRM239068). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted Konark Sun City P1 more time to complete?
UPRERA's record carries 1 completion extension for Konark Sun City P1, the latest running to 31 Dec 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does Konark Sun City P1 have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is Konark Sun City P1 located?
Konark Sun City P1 is registered in Lucknow, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗