KRISHNA GREENS RESIDENCY is a RERA-registered residential project by Krishna Greens Developers in Mathura (RERA ID UPRERAPRJ645697). Registered with a completion deadline of 12 Jan 2028.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ645697 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Mathura-Vrindavan Development Authority |
| Proposed start | 13 Jan 2023 |
| Project duration | 60 months |
| Address | Mathura, Mathura |
| Tehsil | Mathura |
| Applicant type | Partnership Firm |
| Applicant address | Krishna Orchid Goverdhan Road Mathura |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated (2)
3 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Permit revalidated
MVDA/BP/23-24/0280
Building permit sanctioned
MVDA/BP/23-24/0280
Registered with RERA
Permit revalidated (5)
5 building permits sanctioned
Permit revalidated
MVDA/BP/23-24/0281
Building permit sanctioned
MVDA/BP/23-24/0281
Permit revalidated (6)
6 building permits sanctioned
Permit revalidated
MVDA/BP/23-24/0441
Building permit sanctioned
MVDA/BP/23-24/0441
Permit revalidated (2)
2 building permits sanctioned
Permit revalidated (7)
7 building permits sanctioned
Permit revalidated (2)
2 building permits sanctioned
Permit revalidated (18)
18 building permits sanctioned
Permit revalidated
MVDA/BP/23-24/1406
Building permit sanctioned
MVDA/BP/23-24/1406
Permit revalidated (5)
5 building permits sanctioned
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 28 Mar 2023 |
| Original completion | 12 Jan 2028 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹4,77,000 |
| Sanctioning authority | Mathura-Vrindavan Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots By fixing of RCC muddi on all corners of the plots |
| 2 | Boundary Wall 230 mm Wall in brick massonary with FPS bricks of class designation 75 in ratio of 1-6 cement mortar on RCC footing and colum structure. |
| 3 | Road Work Laying of roads with proper longitudinal and cross-sectional road slopes in Cobble Stoneover well compacted subgrade with 75mm and 50mm layers of send. |
| 4 | Footpaths Laying of designing Tiles of 40 mm over well compacted subgrade with GSB layers. |
| 5 | Water Supply Including Drinking Water Facilities Laying of 50, 65, 80 (OD) UPVC Fresh Water Supply Line from Undeground Tank to Individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outet Connection at undrground Tank, as per MEP drawings. |
| 6 | Sewer System Laying of SN-4 Pipes DWC pipes and making of circular manholes and rectangular manhole of size 900x800 MM with 600x600 MM Mainhole cover for main Line with proper finished formation level, Invert Level of Manhole and Connection to individual plots, as per MEP drawings. |
| 7 | Drain Laying of DWC/RCC NP-3 pipes for storm water drainage throughout the project with Circular Manholes and rectangular Catch Basins of size 700x700 on Main Line, rectangular Catch Basin of size 450x450 for individual Plots (In Plot Owner Schope), de-Silting Chamber of dia 1.5 M and Recharge Well Size 1.2 Dia. in coordination with Finished Formation Levels, Invert level of Manhole and flow rate, as per MEP drawings. |
| 8 | Parks Landscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini-basketball court, and walkways. |
| 9 | Tree Planting Tree plantaion of Turmal Elia, Ficus Panda and Palm trees throughout the project in parks and on roadside to provide shade, as per landscape drawings. |
| 10 | Design For Electric Supply Including Street Lighting Laying of overhead HT and LT cables from Main electricity board connection to transformers and upto plots for individual connections (which shall be directly obtained by the plot owners from the electricity board) along with fixing of 30 W 50 W street lights on 9m 11m Steel tubular Poles with provision of required capacity transformers as per UPPCL Guidelines |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water Construction of STP collection tank along with modular treatment system and laying of DWC pipes from STP to individual plots and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the Government Drain. |
| 13 | Solid Waste Management And Disposal System Construction of Garbage Rooms in brick load bearing Structure with dustbins, collection room and loading area. |
| 14 | Water Conservation System Installation of Rain Water harvesting pits for percolation of rainwater to maintain the local ground water levels as per approved layout from MVDA and laying of Sewage treated Water Supply Line to plots and green areas for flushing and irrigation, as per MEP drawings. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Temple, Garbage Area |
| 18 | Emergency Evacuation Services NA |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
52 permits
An approval and the date it runs to - not proof the work matching it was done.
52 sanctioning permits are on record with UPRERA, the latest valid to 4 Apr 2029. 51 of them carry a revalidation, the latest valid to 17 Jul 2028.
Sanctioned by Mathura-Vrindavan Development Authority · 91,837 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| MVDA/LD/22-23/0550 | 13 Jan 2023 | 12 Jan 2028 | 12 Jan 2031 | 12 Jan 2028 | — | |
| MVDA/LD/22-23/0550 | 13 Jan 2023 | 12 Jan 2028 | 12 Jan 2031 | 12 Jan 2028 | 13 Jan 2023 valid to 12 Jan 2028 | |
| MVDA/LD/22-23/0550 | 13 Jan 2023 | 12 Jan 2028 | 17 Jul 2031 | 12 Jan 2028 | 13 Jan 2023 valid to 17 Jul 2028 | |
| MVDA/BP/23-24/0432 | 22 Sept 2023 | 21 Sept 2028 | 20 Sept 2031 | 12 Jan 2028 | 22 Sept 2023 | |
| MVDA/BP/23-24/1400 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1400 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/0437 | 18 Jul 2023 | 17 Jul 2028 | 16 Jul 2031 | 12 Jan 2028 | 18 Jul 2023 | |
| MVDA/BP/23-24/1401 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/0269 | 15 Jun 2023 | 14 Jun 2028 | 13 Jun 2031 | 12 Jan 2028 | 15 Jun 2023 | |
| MVDA/BP/23-24/0269 | 15 Jun 2023 | 14 Jun 2028 | 13 Jun 2031 | 12 Jan 2028 | 15 Jun 2023 | |
| MVDA/BP/23-24/1402 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/0270 | 15 Jun 2023 | 14 Jun 2028 | 13 Jun 2031 | 12 Jan 2028 | 15 Jun 2023 | |
| MVDA/BP/23-24/1404 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1405 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1078 | 8 Jan 2024 | 7 Jan 2029 | 6 Jan 2032 | 12 Jan 2028 | 8 Jan 2024 | |
| MVDA/BP/23-24/1406 | 30 Mar 2024 | 29 Mar 2029 | 28 Mar 2032 | 12 Jan 2028 | 30 Mar 2024 | |
| MVDA/BP/23-24/1079 | 8 Feb 2024 | 7 Feb 2029 | 6 Feb 2032 | 12 Jan 2028 | 8 Feb 2024 | |
| MVDA/BP/23-24/1408 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1080 | 8 Feb 2024 | 7 Feb 2029 | 6 Feb 2032 | 12 Jan 2028 | 8 Feb 2024 | |
| MVDA/BP/23-24/1409 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1409 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1081 | 8 Jan 2024 | 7 Jan 2029 | 6 Jan 2032 | 12 Jan 2028 | 8 Jan 2024 | |
| MVDA/BP/23-24/1421 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1422 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1423 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1424 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/0267 | 15 Jun 2023 | 14 Jun 2028 | 13 Jun 2031 | 12 Jan 2028 | 15 Jun 2023 | |
| MVDA/BP/23-24/0268 | 15 Jun 2023 | 14 Jun 2028 | 13 Jun 2031 | 12 Jan 2028 | 15 Jun 2023 | |
| MVDA/BP/23-24/0438 | 18 Jul 2023 | 17 Jul 2028 | 16 Jul 2031 | 12 Jan 2028 | 18 Jul 2023 | |
| MVDA/BP/23-24/0439 | 18 Jul 2023 | 17 Jul 2028 | 16 Jul 2031 | 12 Jan 2028 | 18 Jul 2023 | |
| MVDA/BP/23-24/0441 | 21 Jul 2023 | 20 Jul 2028 | 19 Jul 2031 | 12 Jan 2028 | 21 Jul 2023 | |
| MVDA/BP/23-24/0443 | 18 Jul 2023 | 17 Jul 2028 | 16 Jul 2031 | 12 Jan 2028 | 18 Jul 2023 | |
| MVDA/BP/23-24/0442 | 22 Sept 2023 | 21 Sept 2028 | 20 Sept 2031 | 12 Jan 2028 | 22 Sept 2023 | |
| MVDA/BP/23-24/1082 | 8 Jan 2024 | 7 Jan 2029 | 6 Jan 2032 | 12 Jan 2028 | 8 Jan 2024 | |
| MVDA/BP/23-24/1087 | 8 Jan 2024 | 7 Jan 2029 | 6 Jan 2032 | 12 Jan 2028 | 8 Jan 2024 | |
| MVDA/BP/23-24/1088 | 8 Jan 2024 | 7 Jan 2029 | 6 Jan 2032 | 12 Jan 2028 | 8 Jan 2024 | |
| MVDA/BP/23-24/1419 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1089 | 8 Jan 2024 | 7 Jan 2029 | 6 Jan 2032 | 12 Jan 2028 | 8 Jan 2024 | |
| MVDA/BP/23-24/1416 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/1090 | 8 Jan 2024 | 7 Jan 2029 | 6 Jan 2032 | 12 Jan 2028 | 8 Jan 2024 | |
| MVDA/BP/23-24/1417 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/0280 | 26 Jan 2023 | 25 Jan 2028 | 24 Jan 2031 | 12 Jan 2028 | 26 Jan 2023 | |
| MVDA/BP/23-24/1418 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/0435 | 18 Jul 2023 | 17 Jul 2028 | 16 Jul 2031 | 12 Jan 2028 | 18 Jul 2023 | |
| MVDA/BP/23-24/1420 | 15 Mar 2024 | 14 Mar 2029 | 13 Mar 2032 | 12 Jan 2028 | 15 Mar 2024 | |
| MVDA/BP/23-24/0433 | 18 Jul 2023 | 17 Jul 2028 | 16 Jul 2031 | 12 Jan 2028 | 18 Jul 2023 | |
| MVDA/BP/23-24/0281 | 23 Jun 2023 | 22 Jun 2028 | 21 Jun 2031 | 12 Jan 2028 | 23 Jun 2023 | |
| MVDA/BP/23-24/1540 | 5 Apr 2024 | 4 Apr 2029 | 3 Apr 2032 | 12 Jan 2028 | 5 Apr 2024 | |
| MVDA/BP/23-24/1541 | 5 Apr 2024 | 4 Apr 2029 | 3 Apr 2032 | 12 Jan 2028 | 5 Apr 2024 | |
| MVDA/BP/23-24/1542 | 5 Apr 2024 | 4 Apr 2029 | 3 Apr 2032 | 12 Jan 2028 | 5 Apr 2024 | |
| MVDA/BP/23-24/1543 | 5 Apr 2024 | 4 Apr 2029 | 3 Apr 2032 | 12 Jan 2028 | 5 Apr 2024 | |
| MVDA/BP/23-24/1546 | 5 Apr 2024 | 4 Apr 2029 | 3 Apr 2032 | 12 Jan 2028 | 5 Apr 2024 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
27 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 90 | 16700 | Khasra |
| 92 | 12640 | Khasra |
| 93 | 10660 | Khasra |
| 95 | 13820 | Khasra |
| 96 | 3950 | Khasra |
| 97 | 3940 | Khasra |
| 98 | 3940 | Khasra |
| 166 | 19540.91 | Khasra |
| 167 | 2330 | Khasra |
| 168 | 2650 | Khasra |
| 171 | 6950 | Khasra |
| Registry document · 12201 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13982 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 15019 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 19695 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12200 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12199 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12198 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 12197 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13984 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1233 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1232 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 24008 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 13983 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1428-1433 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Allotment letter from the authority · LAND TITLE AND NEC REPORT The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · Authorization letter The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Allotment letter from the authority · OBJECTION REPLY The development authority’s letter allotting the plot - usually the step before a lease deed is executed. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 20 Mar 2023 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 6 Mar 2023 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 6 Mar 2023 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 6 Mar 2023 ↗ |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | New | 6 Mar 2023 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 6 Mar 2023 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 6 Mar 2023 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 6 Mar 2023 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 6 Mar 2023 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 6 Mar 2023 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 6 Mar 2023 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 6 Mar 2023 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 6 Mar 2023 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 6 Mar 2023 ↗ |
Quarterly progress reports
14 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
14 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 60% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 65% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 50% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 57% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Krishna Greens Developers |
| Role | Promoter · current |
| RERA ID | UPRERAPRM224298 |
| PAN | AAYFK5831H |
| CIN / TAN | AGRK12606G |
| Registered address | Krishna Orchid Goverdhan Road Mathura |
| RERA contact | |
| Registered since | 2023 |
Nearby projects
Mathura
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | M/S. KRISHNA GREENS DEVELOPERS-COLLECTION ACCOUNT FOR KRISHNA GREENS RESIDENCYBankICICI BANK LTD.BranchICICI BANK HOLIGATEBranch address63/145, GROUND FLOOR, HOTEL BRIJ BIHAR, TILAK DWAR, AGRA ROAD-281001.Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001585 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | M/S. KRISHNA GREENS DEVELOPERS-SEPERATE BANK ACCOUNT FOR KRISHNA GREENS RESIDENCYBankICICI BANK LTD.BranchICICI BANK HOLIGATEBranch address63/145, GROUND FLOOR, HOTEL BRIJ BIHAR, TILAK DWAR, AGRA ROAD-281001Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001585 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | M/S. KRISHNA GREENS DEVELOPERS-RERA TRANSACTION ACCOUNT FOR KRISHNA GREENS RESIDENCYBankICICI BANK LTD.BranchICICI BANK HOLIGATEBranch address63/145, GROUND FLOOR, HOTEL BRIJ BIHAR, TILAK DWAR, AGRA ROAD-281001Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001585 |
What has changed on this record
nothing recorded yet
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about KRISHNA GREENS RESIDENCY
Is KRISHNA GREENS RESIDENCY RERA registered?
Yes. KRISHNA GREENS RESIDENCY is registered with UPRERA under registration number UPRERAPRJ645697, registered on 28 Mar 2023. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for KRISHNA GREENS RESIDENCY?
The completion date filed with UPRERA is 12 Jan 2028. No completion certificate is on record yet.
Who is the builder of KRISHNA GREENS RESIDENCY?
Krishna Greens Developers is the promoter entity that filed KRISHNA GREENS RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM224298). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does KRISHNA GREENS RESIDENCY have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is KRISHNA GREENS RESIDENCY located?
KRISHNA GREENS RESIDENCY is registered in Mathura, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗