KRISHNA GREENS RESIDENCY

UPRERARegistered

KRISHNA GREENS RESIDENCY is a RERA-registered residential project by Krishna Greens Developers in Mathura (RERA ID UPRERAPRJ645697). Registered with a completion deadline of 12 Jan 2028.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Apr–Jun 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q3'24
—Q4'24
—Q1'25
—Q2'25
60%Q3'25
65%Q4'25
50%Q1'26
57%Q2'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ645697
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryMathura-Vrindavan Development Authority
Proposed start13 Jan 2023
Project duration60 months
AddressMathura, Mathura
TehsilMathura
Applicant typePartnership Firm
Applicant addressKrishna Orchid Goverdhan Road Mathura
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated (2)

  2. 3 building permits sanctioned

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Permit revalidated

    MVDA/BP/23-24/0280

  5. Building permit sanctioned

    MVDA/BP/23-24/0280

  6. Registered with RERA

  7. Permit revalidated (5)

  8. 5 building permits sanctioned

  9. Permit revalidated

    MVDA/BP/23-24/0281

  10. Building permit sanctioned

    MVDA/BP/23-24/0281

  11. Permit revalidated (6)

  12. 6 building permits sanctioned

  13. Permit revalidated

    MVDA/BP/23-24/0441

  14. Building permit sanctioned

    MVDA/BP/23-24/0441

  15. Permit revalidated (2)

  16. 2 building permits sanctioned

  17. Permit revalidated (7)

  18. 7 building permits sanctioned

  19. Permit revalidated (2)

  20. 2 building permits sanctioned

  21. Permit revalidated (18)

  22. 18 building permits sanctioned

  23. Permit revalidated

    MVDA/BP/23-24/1406

  24. Building permit sanctioned

    MVDA/BP/23-24/1406

  25. Permit revalidated (5)

  26. 5 building permits sanctioned

  27. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  28. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered28 Mar 2023
Original completion12 Jan 2028
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹4,77,000
Sanctioning authorityMathura-Vrindavan Development Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
KANCHANA AGRAWAL
License CA/2016/78675
BBC COMPANY, OPP. BSA COLLAGE, MATHURA
Engineer
MUKUL SHARMA
104-F, PUNEET VRINDAVAN, SANJAY PLACE, AGRA.
Contractor
NA
NA
Sr.Development work declared to RERA
1Demarcation of Plots
By fixing of RCC muddi on all corners of the plots
2Boundary Wall
230 mm Wall in brick massonary with FPS bricks of class designation 75 in ratio of 1-6 cement mortar on RCC footing and colum structure.
3Road Work
Laying of roads with proper longitudinal and cross-sectional road slopes in Cobble Stoneover well compacted subgrade with 75mm and 50mm layers of send.
4Footpaths
Laying of designing Tiles of 40 mm over well compacted subgrade with GSB layers.
5Water Supply Including Drinking Water Facilities
Laying of 50, 65, 80 (OD) UPVC Fresh Water Supply Line from Undeground Tank to Individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outet Connection at undrground Tank, as per MEP drawings.
6Sewer System
Laying of SN-4 Pipes DWC pipes and making of circular manholes and rectangular manhole of size 900x800 MM with 600x600 MM Mainhole cover for main Line with proper finished formation level, Invert Level of Manhole and Connection to individual plots, as per MEP drawings.
7Drain
Laying of DWC/RCC NP-3 pipes for storm water drainage throughout the project with Circular Manholes and rectangular Catch Basins of size 700x700 on Main Line, rectangular Catch Basin of size 450x450 for individual Plots (In Plot Owner Schope), de-Silting Chamber of dia 1.5 M and Recharge Well Size 1.2 Dia. in coordination with Finished Formation Levels, Invert level of Manhole and flow rate, as per MEP drawings.
8Parks
Landscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini-basketball court, and walkways.
9Tree Planting
Tree plantaion of Turmal Elia, Ficus Panda and Palm trees throughout the project in parks and on roadside to provide shade, as per landscape drawings.
10Design For Electric Supply Including Street Lighting
Laying of overhead HT and LT cables from Main electricity board connection to transformers and upto plots for individual connections (which shall be directly obtained by the plot owners from the electricity board) along with fixing of 30 W 50 W street lights on 9m 11m Steel tubular Poles with provision of required capacity transformers as per UPPCL Guidelines
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Construction of STP collection tank along with modular treatment system and laying of DWC pipes from STP to individual plots and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the Government Drain.
13Solid Waste Management And Disposal System
Construction of Garbage Rooms in brick load bearing Structure with dustbins, collection room and loading area.
14Water Conservation System
Installation of Rain Water harvesting pits for percolation of rainwater to maintain the local ground water levels as per approved layout from MVDA and laying of Sewage treated Water Supply Line to plots and green areas for flushing and irrigation, as per MEP drawings.
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
NA
17Social Infrastructure And Other Public Amenities Including Public Health Services
Temple, Garbage Area
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

52 permits

An approval and the date it runs to - not proof the work matching it was done.

52 sanctioning permits are on record with UPRERA, the latest valid to 4 Apr 2029. 51 of them carry a revalidation, the latest valid to 17 Jul 2028.

Sanctioned by Mathura-Vrindavan Development Authority · 91,837 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
MVDA/LD/22-23/055013 Jan 202312 Jan 202812 Jan 203112 Jan 2028—
MVDA/LD/22-23/055013 Jan 202312 Jan 202812 Jan 203112 Jan 202813 Jan 2023
valid to 12 Jan 2028
MVDA/LD/22-23/055013 Jan 202312 Jan 202817 Jul 203112 Jan 202813 Jan 2023
valid to 17 Jul 2028
MVDA/BP/23-24/043222 Sept 202321 Sept 202820 Sept 203112 Jan 202822 Sept 2023
MVDA/BP/23-24/140015 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/140015 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/043718 Jul 202317 Jul 202816 Jul 203112 Jan 202818 Jul 2023
MVDA/BP/23-24/140115 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/026915 Jun 202314 Jun 202813 Jun 203112 Jan 202815 Jun 2023
MVDA/BP/23-24/026915 Jun 202314 Jun 202813 Jun 203112 Jan 202815 Jun 2023
MVDA/BP/23-24/140215 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/027015 Jun 202314 Jun 202813 Jun 203112 Jan 202815 Jun 2023
MVDA/BP/23-24/140415 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/140515 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/10788 Jan 20247 Jan 20296 Jan 203212 Jan 20288 Jan 2024
MVDA/BP/23-24/140630 Mar 202429 Mar 202928 Mar 203212 Jan 202830 Mar 2024
MVDA/BP/23-24/10798 Feb 20247 Feb 20296 Feb 203212 Jan 20288 Feb 2024
MVDA/BP/23-24/140815 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/10808 Feb 20247 Feb 20296 Feb 203212 Jan 20288 Feb 2024
MVDA/BP/23-24/140915 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/140915 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/10818 Jan 20247 Jan 20296 Jan 203212 Jan 20288 Jan 2024
MVDA/BP/23-24/142115 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/142215 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/142315 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/142415 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/026715 Jun 202314 Jun 202813 Jun 203112 Jan 202815 Jun 2023
MVDA/BP/23-24/026815 Jun 202314 Jun 202813 Jun 203112 Jan 202815 Jun 2023
MVDA/BP/23-24/043818 Jul 202317 Jul 202816 Jul 203112 Jan 202818 Jul 2023
MVDA/BP/23-24/043918 Jul 202317 Jul 202816 Jul 203112 Jan 202818 Jul 2023
MVDA/BP/23-24/044121 Jul 202320 Jul 202819 Jul 203112 Jan 202821 Jul 2023
MVDA/BP/23-24/044318 Jul 202317 Jul 202816 Jul 203112 Jan 202818 Jul 2023
MVDA/BP/23-24/044222 Sept 202321 Sept 202820 Sept 203112 Jan 202822 Sept 2023
MVDA/BP/23-24/10828 Jan 20247 Jan 20296 Jan 203212 Jan 20288 Jan 2024
MVDA/BP/23-24/10878 Jan 20247 Jan 20296 Jan 203212 Jan 20288 Jan 2024
MVDA/BP/23-24/10888 Jan 20247 Jan 20296 Jan 203212 Jan 20288 Jan 2024
MVDA/BP/23-24/141915 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/10898 Jan 20247 Jan 20296 Jan 203212 Jan 20288 Jan 2024
MVDA/BP/23-24/141615 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/10908 Jan 20247 Jan 20296 Jan 203212 Jan 20288 Jan 2024
MVDA/BP/23-24/141715 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/028026 Jan 202325 Jan 202824 Jan 203112 Jan 202826 Jan 2023
MVDA/BP/23-24/141815 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/043518 Jul 202317 Jul 202816 Jul 203112 Jan 202818 Jul 2023
MVDA/BP/23-24/142015 Mar 202414 Mar 202913 Mar 203212 Jan 202815 Mar 2024
MVDA/BP/23-24/043318 Jul 202317 Jul 202816 Jul 203112 Jan 202818 Jul 2023
MVDA/BP/23-24/028123 Jun 202322 Jun 202821 Jun 203112 Jan 202823 Jun 2023
MVDA/BP/23-24/15405 Apr 20244 Apr 20293 Apr 203212 Jan 20285 Apr 2024
MVDA/BP/23-24/15415 Apr 20244 Apr 20293 Apr 203212 Jan 20285 Apr 2024
MVDA/BP/23-24/15425 Apr 20244 Apr 20293 Apr 203212 Jan 20285 Apr 2024
MVDA/BP/23-24/15435 Apr 20244 Apr 20293 Apr 203212 Jan 20285 Apr 2024
MVDA/BP/23-24/15465 Apr 20244 Apr 20293 Apr 203212 Jan 20285 Apr 2024
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

27 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
9016700Khasra
9212640Khasra
9310660Khasra
9513820Khasra
963950Khasra
973940Khasra
983940Khasra
16619540.91Khasra
1672330Khasra
1682650Khasra
1716950Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 12201
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13982
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 15019
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 19695
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12200
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12199
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12198
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 12197
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13984
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1233
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 1232
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 24008
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 13983
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1428-1433
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Allotment letter from the authority · LAND TITLE AND NEC REPORT
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · Authorization letter
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Allotment letter from the authority · OBJECTION REPLY
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New20 Mar 2023 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New6 Mar 2023 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Mar 2023 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Mar 2023 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New6 Mar 2023 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Mar 2023 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Mar 2023 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Mar 2023 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Mar 2023 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Mar 2023 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Mar 2023 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New6 Mar 2023 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New6 Mar 2023 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New6 Mar 2023 ↗

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2022-Q4 to 2026-Q1.

QuarterConstructionCertificates
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q1—CA ↗ · Arch ↗ · Eng ↗
2025-Q260%CA ↗ · Arch ↗ · Eng ↗
2025-Q365%CA ↗ · Arch ↗ · Eng ↗
2025-Q450%CA ↗ · Arch ↗ · Eng ↗
2026-Q157%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameKrishna Greens Developers
RolePromoter · current
RERA IDUPRERAPRM224298
PANAAYFK5831H
CIN / TANAGRK12606G
Registered addressKrishna Orchid Goverdhan Road Mathura
RERA contact
Registered since2023
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Mathura

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
M/S. KRISHNA GREENS DEVELOPERS-COLLECTION ACCOUNT FOR KRISHNA GREENS RESIDENCYBankICICI BANK LTD.BranchICICI BANK HOLIGATEBranch address63/145, GROUND FLOOR, HOTEL BRIJ BIHAR, TILAK DWAR, AGRA ROAD-281001.Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001585
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
M/S. KRISHNA GREENS DEVELOPERS-SEPERATE BANK ACCOUNT FOR KRISHNA GREENS RESIDENCYBankICICI BANK LTD.BranchICICI BANK HOLIGATEBranch address63/145, GROUND FLOOR, HOTEL BRIJ BIHAR, TILAK DWAR, AGRA ROAD-281001Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001585
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
M/S. KRISHNA GREENS DEVELOPERS-RERA TRANSACTION ACCOUNT FOR KRISHNA GREENS RESIDENCYBankICICI BANK LTD.BranchICICI BANK HOLIGATEBranch address63/145, GROUND FLOOR, HOTEL BRIJ BIHAR, TILAK DWAR, AGRA ROAD-281001Branch districtMathura, Uttar PradeshA/C no.IFSCICIC0001585
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about KRISHNA GREENS RESIDENCY

Is KRISHNA GREENS RESIDENCY RERA registered?

Yes. KRISHNA GREENS RESIDENCY is registered with UPRERA under registration number UPRERAPRJ645697, registered on 28 Mar 2023. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for KRISHNA GREENS RESIDENCY?

The completion date filed with UPRERA is 12 Jan 2028. No completion certificate is on record yet.

Who is the builder of KRISHNA GREENS RESIDENCY?

Krishna Greens Developers is the promoter entity that filed KRISHNA GREENS RESIDENCY with UPRERA (promoter RERA ID UPRERAPRM224298). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does KRISHNA GREENS RESIDENCY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is KRISHNA GREENS RESIDENCY located?

KRISHNA GREENS RESIDENCY is registered in Mathura, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗