LOTUS COURT (PHASE 3), BBD GREEN CITY

UPRERARegistered

LOTUS COURT (PHASE 3), BBD GREEN CITY is a RERA-registered residential project by VIRAJ CONSTRUCTIONS PVT. LTD. in Lucknow (RERA ID UPRERAPRJ5029). Registered with a completion deadline of 28 Aug 2022. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5029
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Dec 2017
Original start1 Dec 2017
Project duration57 months
AddressLucknow, Lucknow
TehsilLucknow
Applicant typeCompany
Applicant address55, Babu Banarsi Das Nagar, Purana Quila, Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Permit revalidated

    36777

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered8 Aug 2017
Original completion1 Mar 2022
Revised completion28 Aug 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹25,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors168 · 2 · 12 (units from plan)
  • 3 BHK96 57%
  • 2 BHK72 43%
ConfigurationUnitsCarpet area
3 BHK9671
2 BHK7254
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Tower- 8 · 3 BHK, 2 BHK127254-71
Tower- 9 · 3 BHK, 2 BHK129654-71
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
DESIGN GROUP
License CA/76/3111
LUCKNOW
Engineer
WASCON
LUCKNOW
Sr.Development work declared to RERA
1Demarcation of Plots
NA
2Boundary Wall
Yes. As per design
3Road Work
Yes. Internal driveway as per design
4Footpaths
Yes. As per design
5Water Supply Including Drinking Water Facilities
Yes
6Sewer System
Yes
7Drain
Yes
8Parks
Yes. Green area as per norms and design
9Tree Planting
Yes. As per norms
10Design For Electric Supply Including Street Lighting
Yes. Internal street lighting as per requirement
11Community Buildings
Club House with Multipurpose Hall, Gym and Swimming Pool
12Treatment and Disposal System of Sewage and Sullage water
Yes. As per requirement
13Solid Waste Management And Disposal System
Yes. As per requirement
14Water Conservation System
Yes. Rain water harvesting as per requirement
15Energy Management System Including Use of Renewable Energy
Yes. As per norms
16Fire Protection And Fire Safety System
Yes. As per norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
Yes. As per norms
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

12 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1Aman ChawlaUPRERAAGT11258
2ASA FINCAP ADVISORS LLPUPRERAAGT10926
3CITYMAX PROPMART PRIVATE LIMITEDUPRERAAGT13792
4GOLDEN STAR REAL ESTATESUPRERAAGT10303
5GOVINDA SRIVASTAVAUPRERAAGT14123
6Hitesh KesarwaniUPRERAAGT11538
7INVESTORS CARE INFRATECH PVT LTDUPRERAAGT13542
8INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
9Rajni DawraUPRERAAGT13519
10REALTYSTRUCTURE INFRATECH PRIVATE LIMITEDUPRERAAGT10144
11SANJEEV KUMAR BANKAUPRERAAGT10894
12SHREE SAI ASSOCIATESUPRERAAGT11846
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 15 Aug 2019. 1 of them carries a revalidation.

Sanctioned by Lucknow Development Authority · 3,952 sqm of land · an approved plan of 2 blocks and 168 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
3677716 Aug 201415 Aug 201915 Aug 20221 Mar 2022—
3677716 Aug 201415 Aug 201915 Aug 20221 Mar 202216 Aug 2014
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 28 Aug 2022.

#Granted fromExtended uptoNote
11 Mar 202228 Aug 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

17 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
182482—
SEMRA 1833472—
SEMRA 182482Khasra
SEMRA 1833472Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 2 Dec 2011.

Registry no.DateTypeArea
169112 Dec 2011self—
1075414 Jul 2015self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Sale deed · 16911
The registered deed by which the promoter bought the land.
PDF ↗
Sale deed · 10754
The registered deed by which the promoter bought the land.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New5 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New5 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New5 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New5 Jul 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYES
Fire safety (as filed with RERA)YES
Health serviceYES
Renewable energyYES

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

8 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

8 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2021-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameVIRAJ CONSTRUCTIONS PVT. LTD.
RolePromoter · current
RERA IDUPRERAPRM1196
PANAACCV2888C
CIN / TANU45201UP2005PTC030895
Name of chairmanMR. RAVINDRA KUMAR AGARWAL
Registered address55, Babu Banarsi Das Nagar, Purana Quila, Lucknow
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
VIRAJ CONSTRUCTIONS PVT. LTDBankPUNJAB NATIONAL BANKBranchASHOK MARGA/C no.IFSCPUNB0717700
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

5 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)210 (Under Registration - 2 ) → 210 (Under Registration - 1 )
changed in Estanzo’s record
18 Oct 2026
Promoter’s complaints tally (all their projects)209 (Under Registration - 2 ) → 210 (Under Registration - 2 )
changed in Estanzo’s record
15 Sept 2026
Promoter’s complaints tally (all their projects)208 (Under Registration - 1 ) → 209 (Under Registration - 2 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)207 (Under Registration - 3 ) → 208 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)207 (Under Registration - 4 ) → 207 (Under Registration - 3 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 18 Oct 2026 · 5 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about LOTUS COURT (PHASE 3), BBD GREEN CITY

Is LOTUS COURT (PHASE 3), BBD GREEN CITY RERA registered?

Yes. LOTUS COURT (PHASE 3), BBD GREEN CITY is registered with UPRERA under registration number UPRERAPRJ5029, registered on 8 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for LOTUS COURT (PHASE 3), BBD GREEN CITY?

The completion date filed with UPRERA is 28 Aug 2022. No completion certificate is on record yet.

Who is the builder of LOTUS COURT (PHASE 3), BBD GREEN CITY?

VIRAJ CONSTRUCTIONS PVT. LTD. is the promoter entity that filed LOTUS COURT (PHASE 3), BBD GREEN CITY with UPRERA (promoter RERA ID UPRERAPRM1196). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does LOTUS COURT (PHASE 3), BBD GREEN CITY show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted LOTUS COURT (PHASE 3), BBD GREEN CITY more time to complete?

UPRERA's record carries 1 completion extension for LOTUS COURT (PHASE 3), BBD GREEN CITY, the latest running to 28 Aug 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does LOTUS COURT (PHASE 3), BBD GREEN CITY have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is LOTUS COURT (PHASE 3), BBD GREEN CITY located?

LOTUS COURT (PHASE 3), BBD GREEN CITY is registered in Lucknow, as filed with UPRERA.

What configurations are available in LOTUS COURT (PHASE 3), BBD GREEN CITY?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in LOTUS COURT (PHASE 3), BBD GREEN CITY?

The approved unit plan filed with UPRERA runs from 54 to 71 m² of carpet area (about 585 to 761 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in LOTUS COURT (PHASE 3), BBD GREEN CITY?

The approved unit plan describes 2 blocks and 168 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is LOTUS COURT (PHASE 3), BBD GREEN CITY?

About 172 units per acre: 168 planned units across 0.98 acres (3,952 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗