MCC Signature Heights - Phase I

UPRERARegistered

MCC Signature Heights - Phase I is a RERA-registered residential project by ANNIKA PROMOTERS PRIVATE LIMITED in Ghaziabad (RERA ID UPRERAPRJ3133). Registered with a completion deadline of 24 Aug 2022.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ3133
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start25 Aug 2014
Original start25 Aug 2014
Project duration96 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressMr. Nirmal Jain - Flat no. 3, 2nd Floor, W-130, Greater Kailash - II, New Delhi - 110048 Mr. Manish
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  2. Building permit sanctioned

    89/GH/ZONE-1/15-16

  3. Registered with RERA

  4. Completion certificate filed

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  8. Completion certificate filed

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered31 Jul 2017
Original completion25 Feb 2022
Revised completion24 Aug 2022
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary22 May 2019
Registration fee₹65,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors318 · 4 · 19 (units from plan)
Homes · commercial units303 · 15 (shops and offices filed in the same plan)
  • 2 BHK230 72%
  • 3 BHK68 21%
  • SHOP15 5%
  • 1 BHK4 1%
  • OTHER1 <1%
ConfigurationUnitsCarpet area
2 BHK23051-87
3 BHK6887
1 BHK432
SHOP15108-143
OTHER1740
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T1 · 2 BHK, 3 BHK, SHOP1911861-133
T2 · 2 BHK, SHOP, OTHER198251-143
T3 · 2 BHK, 3 BHK1911461-87
T7 · 1 BHK1432
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Sr.Development work declared to RERA
1Demarcation of Plots
Completed
2Boundary Wall
Brickwork with RCC Column
3Road Work
Internal roads to be of concrete paver blocks
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
Yes
6Sewer System
Internal sewerage lines shall be done by us which sall be connected to External Sewerage system to be developed GDA
7Drain
Internal drains to be developed by us as per the sanctioned plans and external drainage system shall be done by GDA
8Parks
Yes, shall be developed as per the sanctioned plans that includes kids play area, walking/jogging pathway and a badminton court.
9Tree Planting
Yes, Shall be developed as per the sanctioned plans
10Design For Electric Supply Including Street Lighting
Yes, Shall be developed as per the sanctioned plans
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
Disposal shall be in the sewerage system developed by GDA
13Solid Waste Management And Disposal System
Shall be done as per approved norms
14Water Conservation System
Yes, Rain water harvesting system shall be developed
15Energy Management System Including Use of Renewable Energy
Shall be done as per approved norms
16Fire Protection And Fire Safety System
Yes, developed as per approved norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
Yes, Multi purpose hall, nurserey school, gym, kids room for the residents e.t.c
18Emergency Evacuation Services
Yes, As per plans
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 5 May 2022.

Sanctioned by Ghaziabad Development Authority · 11,993 sqm of land · an approved plan of 4 blocks and 318 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
89/GH/ZONE-1/15-166 May 20175 May 20225 May 202225 Feb 2022
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 24 Aug 2022.

#Granted fromExtended uptoNote
125 Feb 202224 Aug 2022Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

21 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
9762150 sq. mtr—
977806.84 sq. mtr—
98111222.1342 sq. mtr—
9762150Khasra
977806.84Khasra
98111222.1342Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

2 registry or lease-deed filings are on this project’s record with UPRERA, the earliest dated 26 Feb 2013.

Registry no.DateTypeArea
310326 Feb 2013self—
34291 Mar 2013self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 3429
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3103
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New6 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New6 Jul 2018 ↗
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
New11 Mar 2019 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New21 Mar 2020 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New21 Mar 2020 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New21 Mar 2020 ↗
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New2 Sept 2022 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old28 Jul 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old28 Jul 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old28 Jul 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old28 Jul 2017 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old28 Jul 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old28 Jul 2017 ↗

Quarterly progress reports

10 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

10 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2022-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameANNIKA PROMOTERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM4429
PANAAKCA8796J
CIN / TANU70100DL2012PTC240783
Name of chairmanMr. Nirmal Jain - Managing DirectorMr. Manish Ja
Registered addressMr. Nirmal Jain - Flat no. 3, 2nd Floor, W-130, Greater Kailash - II, New Delhi - 110048 Mr. Manish
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
ANNIKA PROMOTERS PRIVATE LIMITED Project Name: MCC Signature Heights - Phase IBankHDFC BANKBranch209-214, KAILASH BUILDING,26 KG MARG ,NEW DELHI-110001A/C no.IFSCHDFC0000003
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
  • No architect, engineer or contractor is published for this project.Ask who the architect and engineer of record are - they are the professionals who certify each quarterly filing.

Common questions about MCC Signature Heights - Phase I

Is MCC Signature Heights - Phase I RERA registered?

Yes. MCC Signature Heights - Phase I is registered with UPRERA under registration number UPRERAPRJ3133, registered on 31 Jul 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has MCC Signature Heights - Phase I been completed?

UPRERA still lists MCC Signature Heights - Phase I as Registered, so it is not shown as completed here. A completion certificate dated 22 May 2019 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of MCC Signature Heights - Phase I?

ANNIKA PROMOTERS PRIVATE LIMITED is the promoter entity that filed MCC Signature Heights - Phase I with UPRERA (promoter RERA ID UPRERAPRM4429). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted MCC Signature Heights - Phase I more time to complete?

UPRERA's record carries 1 completion extension for MCC Signature Heights - Phase I, the latest running to 24 Aug 2022. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does MCC Signature Heights - Phase I have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MCC Signature Heights - Phase I located?

MCC Signature Heights - Phase I is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in MCC Signature Heights - Phase I?

The unit plan filed with UPRERA lists 2 BHK, 3 BHK, 1 BHK, SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MCC Signature Heights - Phase I?

The approved unit plan filed with UPRERA runs from 32 to 740 m² of carpet area (about 341 to 7,961 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MCC Signature Heights - Phase I?

The approved unit plan describes 4 blocks and 318 units of which 303 are homes and 15 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MCC Signature Heights - Phase I?

About 107 units per acre: 318 planned units across 2.96 acres (11,993 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗