Meghdutam Encore

UPRERANCLT

Meghdutam Encore is a RERA-registered residential project by PALM DEVELOPERS PRIVATE LIMITED in Gautam Budh Nagar (RERA ID UPRERAPRJ8057). RERA status: NCLT (since 13 Jul 2021). UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: NCLT.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ8057
Project categoryResidential
Registration typeOngoing
RERA statusNCLTNCLTThe tribunal that hears company insolvency cases. UP-RERA lists projects whose promoter is before it.Read the full entry in the glossary
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start26 Jul 2016
Original start10 Jul 2016
Project duration60 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant address304, SITA RAM MANSION, 718/21, JOSHI ROAD, KAROL BAGH, NEW DELHI - 110005
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    PLG/BP BO3490/FB3773

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

  7. NCLT order

Published without a date
UPRERA lists this project as NCLT. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered11 Aug 2017
Original completion31 Dec 2020
Revised completion30 Jun 2021
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹55,000
Sanctioning authorityGreater Noida Authority
NCLT order date13 Jul 2021

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors318 · 4 · 16 (units from plan)
  • 3 BHK250 79%
  • 2 BHK68 21%
ConfigurationUnitsCarpet area
3 BHK25011-129
2 BHK6884-97
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
TOWER A · 2 BHK, 3 BHK169584-128
TOWER B · 3 BHK166411-113
TOWER C · 3 BHK1664110-113
TOWER D · 2 BHK, 3 BHK169584-129
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
MR. RAJIV GOYAL
License CA/76/2361
M/S R.N GUPTA & ASSOCIATES, E-1, SECTOR-55, NOIDA
Engineer
MR. KAMAL SABHARWAL
M/S CECON ENGG., HS-25, 2nd FLOOR (Level 3), Kailash Colony Market, New Delhi - 110048
Contractor
IN-HOUSE
Sr.Development work declared to RERA
1Demarcation of Plots
AS PER SANCTION LETTER/MAP
2Boundary Wall
AS PER SANCTION LETTER/MAP
3Road Work
AS PER SANCTION LETTER/MAP
4Footpaths
AS PER SANCTION LETTER/MAP
5Water Supply Including Drinking Water Facilities
AS PER SANCTION LETTER/MAP
6Sewer System
AS PER SANCTION LETTER/MAP
7Drain
AS PER SANCTION LETTER/MAP
8Parks
AS PER SANCTION LETTER/MAP
9Tree Planting
AS PER SANCTION LETTER/MAP
10Design For Electric Supply Including Street Lighting
AS PER SANCTION LETTER/MAP
11Community Buildings
AS PER SANCTION LETTER/MAP
12Treatment and Disposal System of Sewage and Sullage water
AS PER SANCTION LETTER/MAP
13Solid Waste Management And Disposal System
AS PER SANCTION LETTER/MAP
14Water Conservation System
AS PER SANCTION LETTER/MAP
15Energy Management System Including Use of Renewable Energy
AS PER SANCTION LETTER/MAP
16Fire Protection And Fire Safety System
AS PER SANCTION LETTER/MAP
17Social Infrastructure And Other Public Amenities Including Public Health Services
AS PER SANCTION LETTER/MAP
18Emergency Evacuation Services
AS PER SANCTION LETTER/MAP
19Other Miscellaneous Work
AS PER SANCTION LETTER/MAP
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

1 agent

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 1 Jul 2020.

Sanctioned by Greater Noida Authority · 10,000 sqm of land · an approved plan of 4 blocks and 318 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
PLG/BP BO3490/FB37732 Jul 20151 Jul 20201 Jul 202331 Dec 2020
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 30 Jun 2021.

#Granted fromExtended uptoNote
131 Dec 202030 Jun 2021Six months extension in view of force majeure caused by covid-19 pandemic

Land & documents

12 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
010000—
GH-0510000Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 29 May 2014.

Registry no.DateTypeArea
1706629 May 2014self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 17066/14
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Jan 2019 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Jan 2019 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jan 2019 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New31 Jan 2019 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New31 Jan 2019 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New31 Jan 2019 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New31 Jan 2019 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old20 Jan 2018 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterAs per attachment
Fire safety (as filed with RERA)As per attachment
Health serviceAs per attachment
Renewable energyAs per attachment
Other facilitiesgym and club

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePALM DEVELOPERS PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM5337
PANAAHCP3177D
CIN / TANU45300DL2013PTC256843
Name of chairmanNEETA SAHA
Registered address304, SITA RAM MANSION, 718/21, JOSHI ROAD, KAROL BAGH, NEW DELHI - 110005
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PALM DEVELOPERS PVT LTDBankAXIS BANK LTDBranchAXIS BANK LTDA/C no.IFSCUTIB0001149
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.

Common questions about Meghdutam Encore

Is Meghdutam Encore RERA registered?

Yes. Meghdutam Encore is registered with UPRERA under registration number UPRERAPRJ8057, registered on 11 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Meghdutam Encore?

The completion date filed with UPRERA is 30 Jun 2021. No completion certificate is on record yet.

Who is the builder of Meghdutam Encore?

PALM DEVELOPERS PRIVATE LIMITED is the promoter entity that filed Meghdutam Encore with UPRERA (promoter RERA ID UPRERAPRM5337). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does Meghdutam Encore show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Has UPRERA granted Meghdutam Encore more time to complete?

UPRERA's record carries 1 completion extension for Meghdutam Encore, the latest running to 30 Jun 2021. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Meghdutam Encore have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Meghdutam Encore located?

Meghdutam Encore is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Meghdutam Encore?

The unit plan filed with UPRERA lists 3 BHK and 2 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Meghdutam Encore?

The approved unit plan filed with UPRERA runs from 11 to 129 m² of carpet area (about 122 to 1,387 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Meghdutam Encore?

The approved unit plan describes 4 blocks and 318 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Meghdutam Encore?

About 129 units per acre: 318 planned units across 2.47 acres (10,000 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗