RPS-02 ZETA-2

UPRERARegistered

RPS-02 ZETA-2 is a RERA-registered residential project by GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY in Gautam Budh Nagar (RERA ID UPRERAPRJ10826). Registered with a completion deadline of 31 Dec 2019. UP-RERA flags this project "Default on QPR": it has not filed its mandatory quarterly progress report(s).

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ10826
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start1 Jul 2018
Original start7 Jan 2011
Project duration18 months
AddressDadri, Gautam Budh Nagar
TehsilDadri
Applicant typeCompetent authority
Applicant addressPLOT NO-01, KNOWLEDGE PARK-04, GREATER NOIDA, G.B. NAGAR UP
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    DCEO/85BM/2010/357

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly reports are in default on this project’s record.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered14 Aug 2017
Original completion31 Dec 2019
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹7,19,500
Sanctioning authorityGreater Noida Authority

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
SUKHBIR SINGH W
License CA/97/21920
PLOT NO-01, KPIV, GREATER NOIDA
Engineer
PRAVEEN SALONIA
PLOT NO-01, KPIV, GREATER NOIDA
Sr.Development work declared to RERA
1Demarcation of Plots
Front Brick Wall Up to Plinth Level
2Boundary Wall
NA
3Road Work
12.00 M Wide Roads
4Footpaths
NA
5Water Supply Including Drinking Water Facilities
PVC and C.I. Pipeline
6Sewer System
R.C.C. Pipeline and Manholes
7Drain
Open Brick Drain
8Parks
45174 Sqm Approx.
9Tree Planting
Landscape
10Design For Electric Supply Including Street Lighting
Street Lighting
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
To be Integrated with existing GNIDA System
13Solid Waste Management And Disposal System
To be Integrated with existing GNIDA System
14Water Conservation System
Rain Water Harvesting
15Energy Management System Including Use of Renewable Energy
NA
16Fire Protection And Fire Safety System
Fire Hydrant
17Social Infrastructure And Other Public Amenities Including Public Health Services
Facility Area
18Emergency Evacuation Services
NA
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 31 Aug 2015.

Sanctioned by Greater Noida Authority · 1,42,880 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
DCEO/85BM/2010/3571 Sept 201031 Aug 201530 Aug 202031 Dec 2019
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

59 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
1975928—
2559227—
260227—
2585475—
261400—
2625918—
2948006—
293214—
293214—
293214—
20111132—
19521849—
2044629—
20510959—
2598472—
2564970—
291440—
2641451—
29921746—
1975928Khasra
2559227Khasra
260227Khasra
2585475Khasra
261400Khasra
2625918Khasra
2948006Khasra
293214Khasra
293214Khasra
293214Khasra
20111132Khasra
19521849Khasra
2044629Khasra
20510959Khasra
2598472Khasra
2564970Khasra
291440Khasra
2641451Khasra
29921746Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 1 Aug 2017.

Registry no.DateTypeArea
na1 Aug 2017self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Khatauni extract · 1421-1426
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New28 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New30 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New30 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New30 Jul 2018 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New30 Jul 2018 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New30 Jul 2018 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New30 Jul 2018 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New30 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old14 Aug 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old14 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old14 Aug 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old14 Aug 2017 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old14 Aug 2017 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
Old14 Aug 2017 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
Old14 Aug 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old14 Aug 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterYes
Fire safety (as filed with RERA)YES
Health serviceOperational hospital nealy 4 km ahead
Renewable energyNo
Other facilitiesPark

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameGREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY
RolePromoter · current
RERA IDUPRERAPRM14590
PANAAALG0129L
CIN / TANMRTG00443C
Registered addressPLOT NO-01, KNOWLEDGE PARK-04, GREATER NOIDA, G.B. NAGAR UP
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITYBankBANK OF BARODABranchGAMMA 2A/C no.IFSCBARB0GAMNOI
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

2 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)271 (Under Registration - 1 ) → 272 (Under Registration - 2 )
changed in Estanzo’s record
13 Oct 2026
Promoter’s complaints tally (all their projects)270 (Under Registration - 0 ) → 271 (Under Registration - 1 )
changed in Estanzo’s record
5 Oct 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 13 Oct 2026 · 2 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

2 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No quarterly progress report is published for this project.Ask the promoter for the latest quarterly report filed and the construction percentage certified in it.
  • No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.

Common questions about RPS-02 ZETA-2

Is RPS-02 ZETA-2 RERA registered?

Yes. RPS-02 ZETA-2 is registered with UPRERA under registration number UPRERAPRJ10826, registered on 14 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for RPS-02 ZETA-2?

The completion date filed with UPRERA is 31 Dec 2019. No completion certificate is on record yet.

Who is the builder of RPS-02 ZETA-2?

GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY is the promoter entity that filed RPS-02 ZETA-2 with UPRERA (promoter RERA ID UPRERAPRM14590). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Why does RPS-02 ZETA-2 show "default on QPR"?

UPRERA flags this project as in default on quarterly progress reporting - the promoter has not filed one or more mandatory quarterly progress reports. The flag is the authority's, not Estanzo's.

Does RPS-02 ZETA-2 have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RPS-02 ZETA-2 located?

RPS-02 ZETA-2 is registered in Gautam Budh Nagar, as filed with UPRERA.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗