MIGSUN JANPATH

UPRERARegistered

MIGSUN JANPATH is a RERA-registered commercial project in Lucknow (RERA ID UPRERAPRJ986676). Registered with a completion deadline of 10 Dec 2024.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ986676
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Aug 2021
Project duration41 months
AddressSarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeCompany
Applicant addressC-2, RDC, RAJNAGAR, GHAZIABAD.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    MAP20190715201831787

  2. valid to

    Permit revalidated

    MAP-20190715201831787

  3. Building permit sanctioned

    MAP-20190715201831787

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. Registered with RERA

  6. valid to

    Permit revalidated

    LDA/BP/21-22/2837

  7. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  8. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered23 Sept 2021
Original completion10 Dec 2024
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹84,000
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors847 · 1 · 19 (units from plan)
Homes · commercial units404 · 443 (shops and offices filed in the same plan)
  • SHOP443 52%
  • OTHER297 35%
  • STUDIO107 13%
ConfigurationUnitsCarpet area
OTHER2978-67
SHOP4436-27
STUDIO10717-34
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
T-5 · OTHER, SHOP, STUDIO198476-67
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 1,900 m² for a OTHER, far outside the rest of that type, so the ranges above leave it out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
VISHAL MITTAL
License CA98/23185
B-3 SECTOR 67 NOIDA
Engineer
NNC DESIGN INTERNATIONAL
G-70 2nd FLOOR JASWANT PLAZA KALINDI KUNJ ROAD SHAHEEN BAGH JAMIA NAGAR NEW DELHI
Contractor
J B INFRATECH
319/5, VIJAY NAGAR, GHAZIABAD
Sr.Development work declared to RERA
1Demarcation of Plots
AS PER THE SANCTIONED MAP APPROVED BY THE LDA
2Boundary Wall
Boundary wall shall be commenced as soon as the construction work shall be started.
3Road Work
Internal road designed for different ROW as per the requirement.
4Footpaths
Footpath shall be provided as per the layout.
5Water Supply Including Drinking Water Facilities
MUNICIPAL DRINKING WATER SUPPLY PLAN SHALL BE USED FOR DRINKING WATER PURPOSES
6Sewer System
Sewerage system shall be used with STP as per the design calculation.
7Drain
Separate drainage line shall be used as per the design calculations.
8Parks
landscape area shall be provided as per the local building byelaws.
9Tree Planting
As per the layout.
10Design For Electric Supply Including Street Lighting
PROVISIONS SHALL BE MADE OF ROOF SOLAR PANELS AND LIGHT. Street Light shall be as per the layout.
11Community Buildings
AS PER APPROVED LAYOUT
12Treatment and Disposal System of Sewage and Sullage water
Disposal system of the sewage and sullage water shall be used through STP for the purpose of landscaping and flushing.
13Solid Waste Management And Disposal System
All the solid waste managed as per the biodegradable waste converted into compost and non biodegradable delivered to waste management as per the design.
14Water Conservation System
Low flow water fixtures shall be used for water conservation and STP water is used for landscaping and flushing purpose.
15Energy Management System Including Use of Renewable Energy
AS PER LAYOUT.
16Fire Protection And Fire Safety System
shall be provided as per Fire drawings and National Building Code.
17Social Infrastructure And Other Public Amenities Including Public Health Services
Social infrastructures and other public amenities including public health services shall be provided as per local building byelaws.
18Emergency Evacuation Services
shall be as per the environment management plan and disaster management plan. All provisions are made including assembly point.
19Other Miscellaneous Work
shall be made as per the approved layout.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1PROPSHOPUPRERAAGT10129
2WEALTH CLINIC PRIVATE LIMITEDUPRERAAGT10521
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 20 Oct 2025. 2 of them carry a revalidation, the latest valid to 21 Jun 2027.

Sanctioned by Lucknow Development Authority · 7,373 sqm of land · an approved plan of 1 block and 847 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
MAP2019071520183178711 Dec 201910 Dec 202410 Dec 202710 Dec 2024—
—10 Dec 202419 Jun 202810 Dec 202429 Apr 2022
valid to 19 Apr 2027
as LDA/BP/21-22/2837
MAP-2019071520183178719 Dec 202020 Oct 202521 Jun 202710 Dec 202419 Dec 2020
valid to 21 Jun 2027
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
no file published
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗

Land & documents

35 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
T-57373.56Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 9023
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · FIRE NOC
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Highlighted Map
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Form RA-1 Notrized
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Layout Plan
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
not reported—
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
not reported—
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
not reported—
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New6 Sept 2021 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New7 Aug 2021 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New4 Sept 2021 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New4 Sept 2021 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New6 Aug 2021 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New6 Aug 2021 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New6 Aug 2021 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New6 Aug 2021 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New6 Sept 2021 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New6 Aug 2021 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New7 Aug 2021 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New7 Aug 2021 ↗

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2021-Q2 to 2024-Q3.

QuarterConstructionCertificates
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SJPHRPL - COLLECTION ACCOUNT FOR MIGSUN JANPATHBankKOTAK MAHINDRA BANKBranchLUCKNOW - ALIGANJBranch addressALIGANJ BRANCH GROUND FLOOR, 40, CHANDRALOK, ALIGANJ, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCKKBK0005190Branch email05190_kucknowaliganj_referralatkotak.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SJPHRPL- SEPARATE BANK ACCOUNT FOR MIGSUN JANPATHBankKOTAK MAHINDRA BANKBranchAliganjBranch addressAliganj, LucknowBranch districtLucknow, Uttar PradeshA/C no.IFSCKKBK0005190
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SJPHRPL - RERA TRANSACTION ACCOUNT FOR MIGSUN JANPATHBankKOTAK MAHINDRA BANKBranchLUCKNOW - ALIGANJBranch addressALIGANJ BRANCH GROUND FLOOR, 40, CHANDRALOK, ALIGANJ, LUCKNOW, UTTAR PRADESHBranch districtLucknow, Uttar PradeshA/C no.IFSCKKBK0005190Branch email05190_lucknowaliganj_referralatkotak.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

4 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)219 (Under Registration - 5 ) → 219 (Under Registration - 4 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)219 (Under Registration - 6 ) → 219 (Under Registration - 5 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)219 (Under Registration - 7 ) → 219 (Under Registration - 6 )
changed in Estanzo’s record
15 Sept 2026
Promoter’s complaints tally (all their projects)218 (Under Registration - 7 ) → 219 (Under Registration - 7 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026 · 4 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about MIGSUN JANPATH

Is MIGSUN JANPATH RERA registered?

Yes. MIGSUN JANPATH is registered with UPRERA under registration number UPRERAPRJ986676, registered on 23 Sept 2021. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for MIGSUN JANPATH?

The completion date filed with UPRERA is 10 Dec 2024. No completion certificate is on record yet.

Does MIGSUN JANPATH have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is MIGSUN JANPATH located?

MIGSUN JANPATH is registered in Lucknow, as filed with UPRERA.

What configurations are available in MIGSUN JANPATH?

The unit plan filed with UPRERA lists OTHER, SHOP and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in MIGSUN JANPATH?

The approved unit plan filed with UPRERA runs from 6 to 67 m² of carpet area (about 63 to 725 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in MIGSUN JANPATH?

The approved unit plan describes 1 block and 847 units of which 404 are homes and 443 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is MIGSUN JANPATH?

About 465 units per acre: 847 planned units across 1.82 acres (7,373 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗