Noida Cyber Hub

UPRERARegistered

Noida Cyber Hub is a RERA-registered commercial project by Noida Cyber Park Pvt. Ltd. in Gautam Budh Nagar (RERA ID UPRERAPRJ335841). Registered with a completion deadline of 31 May 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Construction progress

As filed in quarterly progress reports · % complete · latest filed Jan–Mar 2026
Quarters shown are calendar quarters. UP-RERA files them by financial year.
—Q2'24
—Q3'24
—Q4'24
—Q1'25
61.86%Q2'25
16.72%Q3'25
66.44%Q4'25
66.76%Q1'26

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ335841
Project categoryCommercial
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryNoida Authority
Proposed start1 Dec 2022
Project duration42 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressPlot No. C-28 AND 29, Block No.C Sector 62 Noida-201301
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    2022/03/07/6461

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. to

    Extension granted

  5. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  6. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered5 Dec 2022
Original completion31 May 2025
Revised completion31 May 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹32,000
Sanctioning authorityNoida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors105 · 1 · 9 (units from plan)
Homes · commercial units18 · 87 (shops and offices filed in the same plan)
  • SHOP87 83%
  • OTHER18 17%
ConfigurationUnitsCarpet area
SHOP8729-149
OTHER1885-134
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
Block E · SHOP, OTHER910529-149
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.The plan also files 369.01 m² for a SHOP, 414.81 m² for a SHOP, 411.09 m² for a SHOP and 1 other unit like them, far outside the rest of that type, so the ranges above leave them out.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Kapil Razdan
License CA/2019/110796
342, Near CRC-2, Sultanpur, New Delhi-110030
Engineer
Shyam Sundar Roy
Flat No. 103, Shivalik B-Wing, MIR Road East Thane, Maharashtra-401107
Contractor
UPPAL Engineer
Delhi
Sr.Development work declared to RERA
1Demarcation of Plots
The project land will be demarcated by its boundary wall to the exact shape, size and orientation as per sanction map by Noida Development Authority.
2Boundary Wall
A 2.4 high boundary wall of brick and plaster will be construction with deep foundation to be earthquake resistant. The wall will be plastered and painted as per easthics.
3Road Work
A Pavement quality concrete will be laid in thickness of 150 mm on top of compacted dry lean concrete/ coarse grained sub base.
4Footpaths
An M-15 Grade of paver will be thick 3-4 inch. the color patters will be lasting and visible at all hours.
5Water Supply Including Drinking Water Facilities
Water supply form Noida Authority.
6Sewer System
A sewage will be collected through a soil pipe arrangement, U- bends and inspection chambers leading to the septic tank of the project, from where the sewage will be disposed to the STP System.
7Drain
A surface drain with specs of 150 mm CC Sub-base over compacted earth topped with 20 mm of cement mortar to the size of 150X75 laid in slope of 1 to 300 leading to G.T.
8Parks
N.A.
9Tree Planting
N.A.
10Design For Electric Supply Including Street Lighting
Electrical layout and capacity will be installed to suffice the domestic use of the project. the load sanction will be taken form the electricity Department.
11Community Buildings
N.A.
12Treatment and Disposal System of Sewage and Sullage water
Centralised STP to treat the Seweage.
13Solid Waste Management And Disposal System
Project shall have be waste segregation area and OWC for Treatment.
14Water Conservation System
Rain water harvesting system Duel flush system.
15Energy Management System Including Use of Renewable Energy
LED Light and timer control panels shall be used for efficient energy Management.
16Fire Protection And Fire Safety System
Fire Alarm system provided.
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A.
18Emergency Evacuation Services
As per approved building Plan.
19Other Miscellaneous Work
As per approved Building plan.
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

9 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 REALTORS LLPUPRERAAGT10868
2ANAROCK Property Consultants Private LimitedUPRERAAGT10265
3BOP REALTY PRIVATE LIMITEDUPRERAAGT10206
4Expert InvestorsUPRERAAGT17411
5IA Wealth Private Limited(Formaly Investadvise Wealth Management Private Limited)UPRERAAGT10048
6INVEST MANGOUPRERAAGT12212
7INVESTOXPERT ADVISORS PVT LTDUPRERAAGT21108
8SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
9The Akurath FinmartUPRERAAGT18924
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 31 Mar 2027.

Sanctioned by Noida Authority · 2,142 sqm of land · an approved plan of 1 block and 105 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
2022/03/07/64611 Apr 202231 Mar 202731 Mar 203031 May 2025
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 1 completion extension for this project, running to 31 May 2026.

#Granted fromExtended uptoNote
131 May 202531 May 2026—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
C 28AND 29 SECTOR 62 NOIDA44099.25Plot
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Lease deed · 4767/4768
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Sale deed · Transfer Deed
The registered deed by which the promoter bought the land.
PDF ↗
Registry document · Possession Certificate
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Allotement Letter
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · Name change ROC
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · 4767/4768
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Registry document · Title Search Report
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New11 Nov 2022 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New11 Nov 2022 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New11 Nov 2022 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New23 Nov 2022 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New11 Nov 2022 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New11 Nov 2022 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New11 Nov 2022 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New11 Nov 2022 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New11 Nov 2022 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New11 Nov 2022 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New11 Nov 2022 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New11 Nov 2022 ↗

Quarterly progress reports

14 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

14 quarterly progress reports are on file with UPRERA, covering 2022-Q3 to 2025-Q4.

QuarterConstructionCertificates
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q161.86%CA ↗ · Arch ↗ · Eng ↗
2025-Q216.72%CA ↗ · Arch ↗ · Eng ↗
2025-Q366.44%CA ↗ · Arch ↗ · Eng ↗
2025-Q466.76%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q4. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameNoida Cyber Park Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM196259
PANAAACF5292Q
CIN / TANAAACF5292Q
Name of chairmanAmit Kumar Agarwal
Registered addressPlot No. C-28 AND 29, Block No.C Sector 62 Noida-201301
RERA contact
Registered since2022
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
Noida Cyber Hub Pvt. Ltd. Collection for Noida Cyber HubBankIndusland BankBranchSECTOR-137, NOIDABranch addressAJNARA DAFFODIL SECTOR-137, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0001953Branch emailharsh.karanwal@indusind.com
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
Noida Cyber Park Pvt. Ltd. -Separate Bank Account for Noida Cyber HubBankInduslnd BankBranchSECTOR-137, NOIDABranch addressAJNARA DAFFODIL SECTOR-137, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0001953Branch emailharsh.karanwal@indusind.com
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
Noida Cyber Park Pvt. Ltd. Transaction Account for Noida Cyber HubBankInduslnd BankBranchSECTOR-137, NOIDABranch addressAJNARA DAFFODIL SECTOR-137, NOIDABranch districtGautam Buddha Nagar, Uttar PradeshA/C no.IFSCINDB0001953Branch emailharsh.karanwal@indusind.com
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

7 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)18 (Under Registration - 2 ) → 18 (Under Registration - 0 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)18 (Under Registration - 4 ) → 18 (Under Registration - 2 )
changed in Estanzo’s record
25 Sept 2026
Promoter’s complaints tally (all their projects)18 (Under Registration - 5 ) → 18 (Under Registration - 4 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)18 (Under Registration - 7 ) → 18 (Under Registration - 5 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)17 (Under Registration - 7 ) → 18 (Under Registration - 7 )
changed in Estanzo’s record
9 Sept 2026
Promoter’s complaints tally (all their projects)16 (Under Registration - 6 ) → 17 (Under Registration - 7 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)16 (Under Registration - 7 ) → 16 (Under Registration - 6 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 29 Sept 2026 · 7 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about Noida Cyber Hub

Is Noida Cyber Hub RERA registered?

Yes. Noida Cyber Hub is registered with UPRERA under registration number UPRERAPRJ335841, registered on 5 Dec 2022. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for Noida Cyber Hub?

The completion date filed with UPRERA is 31 May 2026. No completion certificate is on record yet.

Who is the builder of Noida Cyber Hub?

Noida Cyber Park Pvt. Ltd. is the promoter entity that filed Noida Cyber Hub with UPRERA (promoter RERA ID UPRERAPRM196259). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted Noida Cyber Hub more time to complete?

UPRERA's record carries 1 completion extension for Noida Cyber Hub, the latest running to 31 May 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does Noida Cyber Hub have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is Noida Cyber Hub located?

Noida Cyber Hub is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in Noida Cyber Hub?

The unit plan filed with UPRERA lists SHOP and OTHER. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in Noida Cyber Hub?

The approved unit plan filed with UPRERA runs from 29 to 149 m² of carpet area (about 307 to 1,600 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in Noida Cyber Hub?

The approved unit plan describes 1 block and 105 units of which 18 are homes and 87 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is Noida Cyber Hub?

About 198 units per acre: 105 planned units across 0.53 acres (2,142 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗