NARAYANA ESTATE

UPRERARegistered

NARAYANA ESTATE is a RERA-registered residential project by SANJEEVA CONSTRUCTIONS in KANOSI, Lucknow (RERA ID UPRERAPRJ646433). Registered with a completion deadline of 25 Jul 2029.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ646433
Project categoryResidential
Registration typeNew
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryLucknow Development Authority
Proposed start1 Feb 2026
Project duration42 months
AddressGATA NO-2137/2 AND 2146 AT PARGANA, KANOSI, Sarojini Nagar, Lucknow
TehsilSarojini Nagar
Applicant typeProprietorship Firm
Applicant addressFlat No. 101-A 1 Wala Qadar Road, Qaiserbagh Lucknow
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    GROUP HOUSING/12296/LDA/BP/21-22/0997/05062024

  2. Registered with RERA

  3. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  4. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  5. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2025-26
Q1Q2Q3Q4
FY 2026-27
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered19 Jan 2026
Original completion25 Jul 2029
Revised completion— none granted
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹19,500
Sanctioning authorityLucknow Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors56 · 1 · 6 (units from plan)
  • 2 BHK46 82%
  • 4 BHK10 18%
ConfigurationUnitsCarpet area
2 BHK4653-90
4 BHK10131-170
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
NARAYANA ESTATE · 2 BHK, 4 BHK65653-170
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
AJAY SRIVASTAVA
License CA/92/14850
5/962, GOMTI NAGAR EXT, LUCKNOW
Engineer
ER. OMKAR VERMA
8/14, INDIRA NAGAR, LUCKNOW
Contractor
SANJEEVA CONSTRUCTION
312, 3RD FLOOR, SKYLINE PLAZA 1- SHUSHANT GOLF CITY, LUCKNOW
Sr.Development work declared to RERA
1Demarcation of Plots
THE PROJECT LAND WILL BE DEMARCATED BY ITS BOUNDARY WALL TO THE EXACT SHAPE, SIZE AND ORIENTATION AS PER SANCTIONED MAP BY LDA.
2Boundary Wall
A 2.4M HIGH BOUNDARY WALL OF BRICK AND PLASTIC WILL BE CONSTRUCTED WITH DEEP FOUNDATION TO BE EARTHQUAKE RESISTANT. THE WALL WILL THEN BE PLASTERED AND PAINTED AS PER ESTHETICS.
3Road Work
A PAVEMENT QUALITY CONCRETE WILL BE LAID IN THICKNESS 200MM ON TOP OF COMPACTED DRY LEAN CONCRETE/COARSE GRAINED SUB BASE.
4Footpaths
AN M-15 GRADE OF PAVERS BLOCK/INTERLOCKING TILE WILL BE LAID IN THE PROJECT FOR WALKING AREAS. TILES WILL BE 3 TO 4 INCH THICK AND THE COLOR PATTERS WILL BE LASTING AND VISIBLE AT ALL HOURS.
5Water Supply Including Drinking Water Facilities
WE WILL FILL THE 2 UNDERGROUND DOMESTIC WATER TANK EACH CAPACITY OF 100KL THROUGH THE BOREWELL , AND FROM THERE THE 2 OVERHEAD WATER TANKS ON TERRACE HAVING CAPACITY OF 100KL EACH WILL BE FILLED USING PUMPS. WATER SUPPLY TO THE FLATS WILL BE PROVIDED THROUGH TESE TANKS. SEPARATE SUPPLY INES WILL BE LAID FOR THE TOP 2 FLOORS, ANOTHER DEDICATED LINE FOR OTHER FLOORS, AND SEPARATE LINE FOR THE REMAINING FLOORS. THE ARRANGEMENT WILL ENSURE THAT NO ONT E FACES ANY WATER PRESSURE ISSUED. WE ALSO HAVE 2 FIRE UNDERGROUND TANKS EACH WITH CAPACITY OF 100KL.
6Sewer System
SINCE THIS IS AN LDA LAND AND FALLS UNDER THE MUNICIPAL CORPORATION, THESE FACILITIES HAVE BEEN PROVIDED BY MUNICIPAL CORPORATION. WE WILL CONNECT OUR SEWER LINE MEASURING 250MM DIAMETER TOT EH MUNICIPAL CORPORATION MAIN SEWER LINE .
7Drain
A WELL DESINED SYSTEM OF COVERED AND UNDERGROUND DRAIN MEASURING 200MM DIAMENTER SHALL BE IN PLACE, STORM WATER AND ROOF RAINWATER WILL BE DIVERTED TO RAINWATER HARVESTING ARRANGEMENTAS PER NORMS.
8Parks
AS PER THE SANCTIONED PLAN, THE BUILDING LAYOUT INCLUDES DESIGNATED GRENAREAS ON THREESIDES. WE WILL DEVELOP THE SITE EXACTLY AS PER SANCTIONED LAYOUT ENSURING ALL GREEN ZONES. THER EIS 1 GREEN PARK.
9Tree Planting
2-3 METER HIGHT TREE WILL BE PLANTED ALONG THE BOUNDARY WALL AND FRONT SIDE GREEN BELT PROVIDED BY LDA WILL ALSO BE.
10Design For Electric Supply Including Street Lighting
WE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDERSENTRALIZED TRANSFORMER, HT PANEL, LT PANEL, FEEDER PILLERAND DG BACK FOR COMMON SERVICE LIKE EXTERNAL LLIGHTING, PUMP ROOM ETC AND LIGHT BACKUP TO FLATS.
11Community Buildings
NA
12Treatment and Disposal System of Sewage and Sullage water
MODULAR SEWERAGE SYSTEM SHALL BE PROVIDED . ALL SEWERAGE WATER SHALL GO THE STP AND OVERFLOW FROM THE STP SHALL BE CONNECTED TO THE MUNICIPAL SEWERAGE SYSTEM.
13Solid Waste Management And Disposal System
THE COLLECTION AND DISPOSAL OF SOLID WASTE WILL BE MANAGED IN COORDINATION WITH LOCAL MUNICIPAL CORPORATION TO ENSURE PROPER HANDLING AS PER MUNICIPAL NORMS. ALL WASTE MANAGEMENT ACTIVITIES WILL FOLLOW THE PROCEDURES AND SCHEDULES PRESCRIBED BY THE LOCAL AUTHORITY.
14Water Conservation System
RECHARGEBLE WELLS AND PITS WILL BE PROVIDED TO FACILITIES EFFICIENT GROUNDWATER RECHARGE AND STORMWATER MANAGEMENT. THESE STRUCTURES WILL BE DEVELOPEDAS PER THE APPROVED DESIGN TO ENSURE SUSTAINABLE AND COMPLIANT WATER RECHARGE PRACTICES.
15Energy Management System Including Use of Renewable Energy
WE SHALL BE PROVIDING SOLAR PANELS FOT THE STREET LIGHTINGAND WATER HEATERS.
16Fire Protection And Fire Safety System
A COMPLETE FIRE SAFETY SYSTEM WITH A -GRADE MATERIALS WILL BE INSTALLED AS SPECIFIED IN THE UPFES GYUIDELINES. SPRINKLERS WILL BE INSTALLED IN THE FLATS AS WELL AS IN THE COMMON AREAS, FIRE EXTINGUISHERS, THE FIRE SHAFT (WHICH INCLUDES VALVES FOR HOSEREEL TO SPRINKLE WATER AT THETIME OF EMERGENCY ) , THE FIRE ALARM SYSTEM WILL ALSO BE INSTALLED IN ALL COMMON AREAS.
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
ALL EMERGENCY EVACUATION SERVICES HAVE BEENARRANGED AS PER THE REQUIRED NORMS, FIRE STAIRS CASES PROVIDED AS PER GUDELINES OF (UPFES) AND ALL GUIDELINESWILL BE STRICTLY FOLLOWED.
19Other Miscellaneous Work
NA
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Permits & extensions

1 permit

An approval and the date it runs to - not proof the work matching it was done.

1 sanctioning permit is on record with UPRERA, valid to 25 Jul 2029.

Sanctioned by Lucknow Development Authority · 2,812 sqm of land · an approved plan of 1 block and 56 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endDocuments filed
GROUP HOUSING/12296/LDA/BP/21-22/0997/0506202426 Jul 202425 Jul 202924 Jul 203125 Jul 2029
Plans and approvals filed with RERA
DocumentFile
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
2137/2 AND 21462812Khasra
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · REGISTRY
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Lease deed · BUILDER AGREEMENT
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Khatauni extract · KHATAUNI
An extract of the village land record showing the khasra plots and who is recorded against them.
PDF ↗
Document checklist
DocumentStatusUploaded
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New9 Dec 2025 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New9 Dec 2025 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New9 Dec 2025 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
New9 Dec 2025 ↗
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
New9 Dec 2025 ↗
Water supply plan
How the project proposed to supply water, as filed at registration.
New9 Dec 2025 ↗
Electricity supply plan
How the project proposed to supply power, as filed at registration.
New9 Dec 2025 ↗
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
New9 Dec 2025 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
New9 Dec 2025 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New7 Jan 2026 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New9 Dec 2025 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New1 Jan 2026 ↗
Agreement for sale (proforma)
The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind.
New7 Jan 2026 ↗

Quarterly progress reports

2 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

2 quarterly progress reports are on file with UPRERA, covering 2025-Q4 to 2026-Q1.

QuarterConstructionCertificates
2025-Q40%CA ↗ · Arch ↗ · Eng ↗
2026-Q10%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2026-Q1. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameSANJEEVA CONSTRUCTIONS
RolePromoter · current
RERA IDUPRERAPRM392930
PANAGBPK3338K
CIN / TANLKNA19172G
Registered addressFlat No. 101-A 1 Wala Qadar Road, Qaiserbagh Lucknow
RERA contact
Registered since2025
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.
Legal nameDR. SHANTI KUMAR KAMLESH
RoleCo-promoter
Applicant typeIndividual
AddressS/O LATE BADLURAM RASIK, 279, SUBHASH MARG DUGAWAN, LUCKNOW-226001
RERA contact

Nearby projects

Lucknow

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.

AccountAs filed with RERA
CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary
SANJEEVA CONSTRUCTIONS COLLECTION ACCOUNT FOR NARAYANA ESTATEBankPUNJAB NATIONAL BANKBranch94, M.G , BRANCHBranch addressPWD LUCKNOW, 94 M.G.MARG, LUCKNOW, UPBranch districtLucknow, Uttar PradeshA/C no.IFSCPUNB0667100Branch emailbo6671@pnb.co.in
SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary
SANJEEVA CONSTRUCTIONS SEPARATE ACCOUNT FOR NARAYANA ESTATEBankPUNJAB NATIONAL BANKBranch94, M.G.MARG, BRANCHBranch addressPWD LUCKNOW 94 M.G.MARG, LUCKNOW, UPBranch districtLucknow, Uttar PradeshA/C no.IFSCPUNB0667100
TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary
SANJEEVA CONSTRUCTIONS TRANSACTION ACCOUNT FOR NARAYANA ESTATEBankPUNJAB NATIONAL BANKBranch94, M.G.MARG, BRANCHBranch addressPWD LUKCNOW, 94 M.G.MARG, LUCKNOWBranch districtLucknow, Uttar PradeshA/C no.IFSCPUNB0667100
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about NARAYANA ESTATE

Is NARAYANA ESTATE RERA registered?

Yes. NARAYANA ESTATE is registered with UPRERA under registration number UPRERAPRJ646433, registered on 19 Jan 2026. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for NARAYANA ESTATE?

The completion date filed with UPRERA is 25 Jul 2029. No completion certificate is on record yet.

Who is the builder of NARAYANA ESTATE?

SANJEEVA CONSTRUCTIONS is the promoter entity that filed NARAYANA ESTATE with UPRERA (promoter RERA ID UPRERAPRM392930). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Does NARAYANA ESTATE have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is NARAYANA ESTATE located?

NARAYANA ESTATE is registered in KANOSI, Lucknow, as filed with UPRERA.

What configurations are available in NARAYANA ESTATE?

The unit plan filed with UPRERA lists 2 BHK and 4 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in NARAYANA ESTATE?

The approved unit plan filed with UPRERA runs from 53 to 170 m² of carpet area (about 570 to 1,830 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in NARAYANA ESTATE?

The approved unit plan describes 1 block and 56 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is NARAYANA ESTATE?

About 81 units per acre: 56 planned units across 0.69 acres (2,812 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗