OASIS GARDEN is a RERA-registered residential project by Mohd. Khalid in Naryawal, Bareilly (RERA ID UPRERAPRJ360646). Registered with a completion deadline of 31 Dec 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ360646 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Bareily Development Authority |
| Proposed start | 1 Jul 2025 |
| Project duration | 30 months |
| Address | Khasra Nos. 985(P), 986 & 987(P), Village Naryawal, tehsil & district , Bareilly (U.P.), Naryawal, Bareilly, Bareilly |
| Tehsil | Bareilly |
| Applicant type | Individual |
| Applicant address | H.No.-485, Siddiki Enclabe, Near Akashpuram, Bareilly UP 243005 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Building permit sanctioned
PRD/PH/02711/BDA/24-25/0108/25102024
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 8 Aug 2025 |
| Original completion | 31 Dec 2027 |
| Revised completion | — none granted |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | - not on record |
| Registration fee | ₹84,500 |
| Sanctioning authority | Bareily Development Authority |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots boundaries of 54 residential plots and 9 commercial plots will be established typically through TS survey and physical marking will be done with 2 feet brick wall |
| 2 | Boundary Wall Boundary wall upto 8 feet height with 1st class bricks and will have RCC column every 10 feet with foundation |
| 3 | Road Work main road 12 meter and 7,50 mtr road in front of plots.. bituminous road will be provided with 12 mm dia C/C 200 mm |
| 4 | Footpaths Footpath with paved tiles will be provided |
| 5 | Water Supply Including Drinking Water Facilities water supply to all the plots will be provided as per layout and 100000 ltr capacity RCC tank will be constructed. |
| 6 | Sewer System all the plots will be well connected with sewer lines ... sewer lines will be connected to the stp. |
| 7 | Drain covered drainage system will be there with brick work on both side of the road and chambers wherever required. |
| 8 | Parks parks will be well planted with green grass. benches , children play area and open gym will be made there in the park. |
| 9 | Tree Planting different variety of tall trees will be planted on both side of roads and around park . |
| 10 | Design For Electric Supply Including Street Lighting underground wiring system will bethere for electriciry connection to every plot, transformer will be installed by electrivity department. strret lights will be there on roads as well as in park. |
| 11 | Community Buildings NA |
| 12 | Treatment and Disposal System of Sewage and Sullage water 40 KLD Sewage treatment olant will be installed. treated water will be used for watering the plants. |
| 13 | Solid Waste Management And Disposal System garbage collection bins will be placed at different places |
| 14 | Water Conservation System rain water recharge pits will be there in the project. |
| 15 | Energy Management System Including Use of Renewable Energy NA |
| 16 | Fire Protection And Fire Safety System NA |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services NA |
| 18 | Emergency Evacuation Services Na |
| 19 | Other Miscellaneous Work NA |
Permits & extensions
1 permit
An approval and the date it runs to - not proof the work matching it was done.
1 sanctioning permit is on record with UPRERA, valid to 12 May 2030.
Sanctioned by Bareily Development Authority · 15,866 sqm of land. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total.
| Permit no. | Date | Valid upto | Extendable upto | Revised end | Documents filed |
|---|---|---|---|---|---|
| PRD/PH/02711/BDA/24-25/0108/25102024 | 13 May 2025 | 12 May 2030 | 11 May 2033 | 31 Dec 2027 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
Land & documents
27 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 985P | 2372 | Khasra |
| 985P | 2372 | Khasra |
| 985P | 2372 | Khasra |
| 985P | 2372 | Khasra |
| 986 | 1304 | Khasra |
| 986 | 1304 | Khasra |
| 986 | 1304 | Khasra |
| 986 | 1304 | Khasra |
| 986 | 1304 | Khasra |
| 987P | 89.82 | Khasra |
| 987P | 77.76 | Khasra |
| Sale deed · 3716 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 5257 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 9371 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12821 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 6741 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 7353 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12296 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 12416 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 16305 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 17767 The registered deed by which the promoter bought the land. | PDF ↗ |
| Sale deed · 16528 The registered deed by which the promoter bought the land. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Khatauni extract · 1426-1431 An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 215 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Khatauni extract · ----------- An extract of the village land record showing the khasra plots and who is recorded against them. | PDF ↗ |
| Registry document · 7132 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 335 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | not reported | — |
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 24 Jul 2025 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 1 Jul 2025 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 1 Jul 2025 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 1 Jul 2025 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 1 Jul 2025 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 1 Jul 2025 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 1 Jul 2025 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 1 Jul 2025 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 1 Jul 2025 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 1 Jul 2025 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 1 Jul 2025 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 1 Jul 2025 ↗ |
| Other A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is. | New | 1 Jul 2025 ↗ |
| Agreement for sale (proforma) The blank sale agreement filed with the authority. It is the document a buyer signs, so the clauses in it are the ones that bind. | New | 1 Jul 2025 ↗ |
Quarterly progress reports
5 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
5 quarterly progress reports are on file with UPRERA, covering 2025-Q2 to 2026-Q2.
| Quarter | Construction | Certificates |
|---|---|---|
| 2025-Q2 | 10% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 12% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 10% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 29% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | Mohd. Khalid |
| Role | Promoter · current |
| RERA ID | UPRERAPRM374027 |
| PAN | AMXPK6977B |
| Registered address | H.No.-485, Siddiki Enclabe, Near Akashpuram, Bareilly UP 243005 |
| RERA contact | |
| Registered since | 2025 |
| Legal name | MOHD. HAMID |
| Role | Co-promoter |
| Applicant type | Individual |
| Address | house no. 485, Siddiqui Enclave, Akashpuram , R.K.University Bareilly UP 243006 |
| RERA contact |
Nearby projects
Bareilly
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Mohd Khalid Collection Account for Oasis GardenBankICICI BANKBranchCIVIL LINESBranch address116, Civil lines BareillyBranch districtBareillyA/C no.IFSCICIC0000192Branch emailagarwal.shagun@icicibank.com |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Mohd Khalid Separate Account for Oasis GardenBankICICI BankBranchCivil LinesBranch address116 Civil Lines BareillyBranch districtBareilly, Uttar PradeshA/C no.IFSCICIC0000192 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Mohd Khalid Rera Transaction account for Oasis GardenBankICICI BankBranchCivil LinesBranch address116 civil lines bareillyBranch districtBareilly, Uttar PradeshA/C no.IFSCICIC0000192 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Quarterly progress report 2026-Q2 | QPR 2026-Q2 newly filed with RERA | 15 Oct 2026 |
What to verify and what to ask
2 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No approved unit plan is published for this project.Ask for the carpet area of the specific unit in writing, and for the approved floor plan it is measured from.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about OASIS GARDEN
Is OASIS GARDEN RERA registered?
Yes. OASIS GARDEN is registered with UPRERA under registration number UPRERAPRJ360646, registered on 8 Aug 2025. Estanzo reproduces that filing; it does not verify the work behind it.
When is possession due for OASIS GARDEN?
The completion date filed with UPRERA is 31 Dec 2027. No completion certificate is on record yet.
Who is the builder of OASIS GARDEN?
Mohd. Khalid is the promoter entity that filed OASIS GARDEN with UPRERA (promoter RERA ID UPRERAPRM374027). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Does OASIS GARDEN have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is OASIS GARDEN located?
OASIS GARDEN is registered in Naryawal, Bareilly, as filed with UPRERA.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗