OZONE CLASSIK is a RERA-registered residential project by ANTHEM YASH KIRTI INFRACITY PVT LTD in Ghaziabad (RERA ID UPRERAPRJ663959). Registered with a completion deadline of 29 May 2027.
RERA status as reported: Registered.Construction progress
Basic details
The promoter’s own descriptions, published as filed. UP-RERA does not certify them.
| RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossary | UPRERAPRJ663959 |
| Project category | Residential |
| Registration type | New |
| RERA status | Registered |
| Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossary | Ghaziabad Development Authority |
| Proposed start | 1 Dec 2019 |
| Project duration | 90 months |
| Address | Ghaziabad, Ghaziabad |
| Tehsil | Ghaziabad |
| Applicant type | Company |
| Applicant address | C -64 Second Floor RDC Raj Nagar Ghaziabad UP 201001 |
| Applicant contact |
Project timeline
Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.
Permit revalidated
207 Map No. 1/PMAY GDA/M.P./2019
2 building permits sanctioned
Construction start, as declared
A date on the record, not a filing — what was planned as of this entry.
Registered with RERA
Completion certificate filed
- to
Extension granted
“Six months extension in view of force majeure caused by covid-19 pandemic”
Completion promised at registration
A date on the record, not a filing — what was planned as of this entry.
Revised completion deadline
A date on the record, not a filing — what was planned as of this entry.
A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.
Registration & timeline
Dates on the registration itself, not on construction - the quarterly reports carry that.
| RERA registered | 24 Dec 2019 |
| Original completion | 30 Nov 2026 |
| Revised completion | 29 May 2027 |
| First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary | 13 Jan 2026 |
| Registration fee | ₹1,13,000 |
| Sanctioning authority | Ghaziabad Development Authority |
Inventory
derived from unit plan
The approved unit plan, not an availability list: nothing here says what is unsold.
- 1 BHK753 57%
- 3 BHK215 16%
- SHOP182 14%
- STUDIO92 7%
- 2 BHK48 4%
- OTHER20 2%
| Configuration | Units | Carpet area |
|---|---|---|
| 1 BHK | 753 | 23 |
| 3 BHK | 215 | 68-108 |
| 2 BHK | 48 | 48 |
| SHOP | 182 | 3-169 |
| OTHER | 20 | 4-156 |
| STUDIO | 92 | 20-26 |
| Tower | Floors | Units | Carpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary |
|---|---|---|---|
| BLOCK-A (KINGDOM MALL) · SHOP, OTHER, STUDIO | 10 | 276 | 3-169 |
| BLOCK-B (KINGDOM APARTMENTS) · 3 BHK | 23 | 115 | 82-108 |
| BLOCK-C (KINGDOM APARTMENTS) · 3 BHK, 2 BHK | 25 | 148 | 48-68 |
| BLOCK-D (KINGDOM HOMES) · 1 BHK | 9 | 753 | 23 |
| KIOSK · OTHER | 1 | 11 | 8 |
| PRIMARY SCHOOL · OTHER | 7 | 7 | 114-156 |
Project team & development works
Who was engaged and what was promised. No status is filed against any of it.
| Sr. | Development work declared to RERA |
|---|---|
| 1 | Demarcation of Plots As per approved layout excluding the zonal green, LMC land & Land for chak road and nali. |
| 2 | Boundary Wall Boundary wall in brick/ masonry/ RCC will be provided. |
| 3 | Road Work Trimix / Interlocking Tiles |
| 4 | Footpaths Side Pathways Designed along the internal roads |
| 5 | Water Supply Including Drinking Water Facilities To be provided by the GDA or Groundwater subject to approval from concerned authority & storage will be done in under ground water tank |
| 6 | Sewer System Underground sewer line as per approved drawings |
| 7 | Drain Under pipe drain with chamber |
| 8 | Parks Will be develop as per sanction drawing |
| 9 | Tree Planting Tree planting as per approved plan. |
| 10 | Design For Electric Supply Including Street Lighting The design has been done as per UP electricity board guidelines. |
| 11 | Community Buildings Community area in D block |
| 12 | Treatment and Disposal System of Sewage and Sullage water Sewage will be treated in the STP (Sewage Treatment Plant) and treated water will be reused and balance will be discharged in the municipal sewer. |
| 13 | Solid Waste Management And Disposal System Door to door collection and will be disposed up to garbage point of authority |
| 14 | Water Conservation System Rainwater harvesting system will be developed as per sanction drawing. |
| 15 | Energy Management System Including Use of Renewable Energy As per GDA norms. |
| 16 | Fire Protection And Fire Safety System System will be provided as per the provisional Fire NOC |
| 17 | Social Infrastructure And Other Public Amenities Including Public Health Services Primary school provision is there |
| 18 | Emergency Evacuation Services As per guidelines and building by-laws |
| 19 | Other Miscellaneous Work N.A. |
Permits & extensions
2 permits
An approval and the date it runs to - not proof the work matching it was done.
2 sanctioning permits are on record with UPRERA, the latest valid to 16 Sept 2024. 1 of them carries a revalidation.
Sanctioned by Ghaziabad Development Authority · 21,523 sqm of land · an approved plan of 6 blocks and 1310 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan
| Permit no. | Date | Valid upto | Extendable upto | Revised end | RevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossary | Documents filed |
|---|---|---|---|---|---|---|
| 207 Map No. 1/PMAY GDA/M.P./2019 | 17 Sept 2019 | 16 Sept 2024 | 16 Sept 2027 | 30 Nov 2026 | — | |
| 207 Map No. 1/PMAY GDA/M.P./2019 | 17 Sept 2019 | 16 Sept 2024 | 16 Sept 2027 | 29 May 2027 | 17 Sept 2019 |
| Document | File |
|---|---|
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | no file published |
| Commencement certificate The sanctioning authority’s permission to begin construction - the document that says work could lawfully start. | PDF ↗ |
| Other plan A plan the promoter filed that does not fall under the authority’s named headings. | PDF ↗ |
UPRERA’s record carries 1 completion extension for this project, running to 29 May 2027.
| # | Granted from | Extended upto | Note |
|---|---|---|---|
| 1 | 30 Nov 2026 | 29 May 2027 | Six months extension in view of force majeure caused by covid-19 pandemic |
Land & documents
29 filings
How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.
| KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossary | Area | Type |
|---|---|---|
| 823 | 2840 | Khasra |
| 826 | 3303 | Khasra |
| 839,843 | 3425 | Khasra |
| 839 | 400 | Khasra |
| 839 | 75 | Khasra |
| 839 | 400 | Khasra |
| 842 | 880 | Khasra |
| 842 | 1140 | Khasra |
| 841 | 1800 | Khasra |
| 840 | 317 | Khasra |
| 840 | 317 | Khasra |
| 840 | 633 | Khasra |
| 840 | 1012 | Khasra |
| 840 | 253 | Khasra |
| 834,835,838 | 6071 | Khasra |
| 841 | 600 | Khasra |
| Registry document · 6186 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6184 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1772 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8196 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 5661 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 8197 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 4207 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1385 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6658 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10763 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 10762 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 7106 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 725 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 3874 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 6920 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Registry document · 1690 The deed as registered with the sub-registrar, which is what proves the transfer took place. | PDF ↗ |
| Document | Status | Uploaded |
|---|---|---|
| Completion / occupancy certificate (proforma) The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued. | not reported | — |
| Encumbrance details What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer. | New | 5 Dec 2019 ↗ |
| Application form (proforma) The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking. | New | 15 Nov 2019 ↗ |
| Allotment letter (proforma) The blank allotment letter on record - what the promoter said it would issue on booking. | New | 15 Nov 2019 ↗ |
| Conveyance deed (proforma) The blank deed by which title would eventually transfer to the buyer or the association. | New | 16 Nov 2019 ↗ |
| Waste disposal plan How the project proposed to handle sewage and solid waste, as filed at registration. | New | 15 Nov 2019 ↗ |
| Water supply plan How the project proposed to supply water, as filed at registration. | New | 15 Nov 2019 ↗ |
| Electricity supply plan How the project proposed to supply power, as filed at registration. | New | 15 Nov 2019 ↗ |
| Development work plan The internal development the promoter undertook to build - roads, drainage and the rest of the site works. | New | 15 Nov 2019 ↗ |
| Affidavit (Form B) The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account. | New | 29 Nov 2019 ↗ |
| Chartered accountant’s certificate The CA’s certification of the money drawn from the project account against the stage of construction. | New | 15 Nov 2019 ↗ |
| Architect’s certificate The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage. | New | 15 Nov 2019 ↗ |
| Engineer’s certificate The engineer’s certification of the cost incurred on construction to date. | New | 29 Nov 2019 ↗ |
Quarterly progress reports
25 filed reports
The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.
25 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2026-Q1.
| Quarter | Construction | Certificates |
|---|---|---|
| 2020-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2020-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2021-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2022-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2023-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q2 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q3 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2024-Q4 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q1 | — | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q2 | 75.94% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q3 | 75.94% | CA ↗ · Arch ↗ · Eng ↗ |
| 2025-Q4 | 82.63% | CA ↗ · Arch ↗ · Eng ↗ |
| 2026-Q1 | 87.88% | CA ↗ · Arch ↗ · Eng ↗ |
Promoter (SPV) details
The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.
| Legal name | ANTHEM YASH KIRTI INFRACITY PVT LTD |
| Role | Promoter · current |
| RERA ID | UPRERAPRM97930 |
| PAN | AAACY5120G |
| CIN / TAN | U45400UP2011PTC047413 |
| Name of chairman | Jagdish Yadav |
| Registered address | C -64 Second Floor RDC Raj Nagar Ghaziabad UP 201001 |
| RERA contact | |
| Registered since | 2019 |
Nearby projects
Ghaziabad
Straight-line distance between filed coordinates. Not a comparison and not a travel time.
Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.
RERA bank accounts
verify before payment
Not confirmation that money is in these accounts, and details change - verify at the source before paying.
Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:
3 of the 3 account headings UPRERA publishes are filed for this project: collection, separate and transaction. What is filed is the account, not what is in it.
| Account | As filed with RERA |
|---|---|
| CollectionCollection accountOne of the three account types a UP-RERA project filing can carry, named “Collection” on the portal.Read the full entry in the glossary | Anthem Yash Kirti Infracity Private Limited Collection Account for Ozone ClassikBankHDFC BankBranchRDC Rajnagar, GhaziabadBranch addressD-44, RDC, Rajnagar, GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000153 |
| SeparateSeparate accountThe second of UP-RERA’s three filed account types, named “Separate” on the portal.Read the full entry in the glossary | Anthem Yash Kirti Infracity Private Limited - Separate Bank Account for Ozone ClassikBankHDFC BankBranchRDC, Rajnagar, GhaziabadBranch addressD-44, RDC, Rajnagar, GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000153 |
| TransactionTransaction accountThe third of UP-RERA’s three filed account types, named “Transaction” on the portal.Read the full entry in the glossary | Anthem Yash Kirti Infracity Private Limited RERA Transaction Account for Ozone ClassikBankHDFC BankBranchRDC Rajnagar, GhaziabadBranch addressD-44, RDC, Rajnagar, GhaziabadBranch districtGhaziabad, Uttar PradeshA/C no.IFSCHDFC0000153 |
What has changed on this record
1 movement
When Estanzo first saw a difference - not proof RERA’s record changed that day.
Estanzo began recording changes to this record on 10 Aug 2026.
| Field | What moved | Observed |
|---|---|---|
| Promoter’s complaints tally (all their projects) | 16 (Under Registration - 1 ) → 16 (Under Registration - 0 ) changed in Estanzo’s record | 9 Sept 2026 |
| Promoter’s complaints tally (all their projects) | changed in Estanzo’s record · 9 Sept 2026 |
What to verify and what to ask
1 not published
Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.
- No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.
Common questions about OZONE CLASSIK
Is OZONE CLASSIK RERA registered?
Yes. OZONE CLASSIK is registered with UPRERA under registration number UPRERAPRJ663959, registered on 24 Dec 2019. Estanzo reproduces that filing; it does not verify the work behind it.
Has OZONE CLASSIK been completed?
UPRERA still lists OZONE CLASSIK as Registered, so it is not shown as completed here. A completion certificate dated 13 Jan 2026 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.
Who is the builder of OZONE CLASSIK?
ANTHEM YASH KIRTI INFRACITY PVT LTD is the promoter entity that filed OZONE CLASSIK with UPRERA (promoter RERA ID UPRERAPRM97930). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.
Has UPRERA granted OZONE CLASSIK more time to complete?
UPRERA's record carries 1 completion extension for OZONE CLASSIK, the latest running to 29 May 2027. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.
Does OZONE CLASSIK have a RERA bank account?
Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.
Where is OZONE CLASSIK located?
OZONE CLASSIK is registered in Ghaziabad, as filed with UPRERA.
What configurations are available in OZONE CLASSIK?
The unit plan filed with UPRERA lists 1 BHK, 3 BHK, 2 BHK, SHOP, OTHER and STUDIO. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.
What is the carpet area of flats in OZONE CLASSIK?
The approved unit plan filed with UPRERA runs from 3 to 169 m² of carpet area (about 30 to 1,816 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.
How many towers and units are planned in OZONE CLASSIK?
The approved unit plan describes 6 blocks and 1,310 units of which 1,128 are homes and 182 are commercial units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.
How dense is OZONE CLASSIK?
About 246 units per acre: 1,310 planned units across 5.32 acres (21,523 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.
Data as reported by UPRERA, as of 21 Oct 2026. official source ↗