PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4)

UPRERARegistered

PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4) is a RERA-registered residential project by Panchsheel Buildtech Pvt. Ltd. in Gautam Budh Nagar (RERA ID UPRERAPRJ8595). Registered with a completion deadline of 30 Nov 2026.

Summarize this record with:ChatGPTPerplexityClaudeGrok
RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ8595
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGreater Noida Authority
Proposed start30 Nov 2017
Original start30 Nov 2017
Project duration109 months
AddressGautam Buddha Nagar, Gautam Budh Nagar
TehsilGautam Buddha Nagar
Applicant typeCompany
Applicant addressH-169 Sector 63 Noida, Gautam Buddha Nagar, U.P.
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. valid to

    Permit revalidated

    BP-3089/GH/FTS-8857

  2. 2 building permits sanctioned

  3. Registered with RERA

  4. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  5. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  6. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  7. to

    Extension granted

  8. to

    Extension granted

  9. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4
FY 2025-26
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered12 Aug 2017
Original completion30 Nov 2022
Revised completion30 Nov 2026
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary- not on record
Registration fee₹74,500
Sanctioning authorityGreater Noida Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors666 · 4 · 29 (units from plan)
  • 2 BHK550 83%
  • 3 BHK116 17%
ConfigurationUnitsCarpet area
2 BHK55057-65
3 BHK11684
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
D3 · OTHER, 2 BHK2915065
D4 · OTHER, 3 BHK2011684
E6 · OTHER, 2 BHK2620057
E7 · OTHER, 2 BHK2620057
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
Oasis Design Incorporated
License CA/92/15430
3172,Sec-A,Pkt-B Vasant Kunj New Delhi
Engineer
Optimum Design Pvt. Ltd.
B-24,Sector 67,Noida
Contractor
Vishal Associate
1901-D-37 Sctor 65, Noida 201301
Sr.Development work declared to RERA
1Demarcation of Plots
Plot demarcated already
2Boundary Wall
Completed
3Road Work
Under Construction
4Footpaths
Under Construction
5Water Supply Including Drinking Water Facilities
will be done as per sanctioned plans
6Sewer System
will be done as per sanctioned plans
7Drain
will be done as per sanctioned plans
8Parks
will be done as per sanctioned plans
9Tree Planting
will be done as per sanctioned plans
10Design For Electric Supply Including Street Lighting
will be done as per sanctioned plans
11Community Buildings
will be done as per sanctioned plans
12Treatment and Disposal System of Sewage and Sullage water
Yes, Stp is under construction
13Solid Waste Management And Disposal System
Yes, will be done
14Water Conservation System
Rainwater harvesting pits will be done as per sanction plans
15Energy Management System Including Use of Renewable Energy
CFL
16Fire Protection And Fire Safety System
will be done as per Fire Norms
17Social Infrastructure And Other Public Amenities Including Public Health Services
NA
18Emergency Evacuation Services
As per sanctioned plans
19Other Miscellaneous Work
If found will be workout accordingly
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

109 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1360 DEGREE VENTURES PRIVATE LIMITEDUPRERAAGT18728
2Abhilash KumarUPRERAAGT25844
3Aditya KumarUPRERAAGT24617
4ADITYA KUMARUPRERAAGT24925
5Ajay KumarUPRERAAGT25743
6Ajeet SinghUPRERAAGT16544
7Alok KumarUPRERAAGT24588
8AMIT KUMARUPRERAAGT24558
9ANAADI DEVELOPERS PVT. LTD.UPRERAAGT26094
10Anil kumar patelUPRERAAGT19500
11Anuj Kumar AwasthiUPRERAAGT24787
12ANURAG PRATAP SINGHUPRERAAGT24212
13AOUN AHMAD SIDDIQUIUPRERAAGT21719
14ARUN KUMAR SHARMAUPRERAAGT26374
15ARUN PRAKASHUPRERAAGT26169
16ARVIND KUMAR MISHRAUPRERAAGT10861
17ARVIND KUMAR SHARMAUPRERAAGT14986
18ASHISH CHOUDHARYUPRERAAGT24989
19Atul PandeyUPRERAAGT23012
20AVINASH KUMARUPRERAAGT18232
21Avinash sagarUPRERAAGT18125
22BALJEET SINGHUPRERAAGT24850
23BLUE SAPPHIRE INFRASTRUCTURE LLPUPRERAAGT23418
24BRICKSNWALL INNOVATIONS PRIVATE LIMITEDUPRERAAGT21089
25BRIJESH SINGHUPRERAAGT24937
26City Associates C/o Dharmender ChaudharyUPRERAAGT12292
27Devdutt SharmaUPRERAAGT21584
28DIMENSIONS REALTYUPRERAAGT25635
29Expert InvestorsUPRERAAGT17411
30FINDMYPROPERTY PRIVATE LIMITEDUPRERAAGT11867
31GAURAV BATRAUPRERAAGT24341
32gaurav sharmaUPRERAAGT15477
33Geetam singhUPRERAAGT23433
34GOLDHOMZ DEVELOPERS PVT LTDUPRERAAGT23371
35Hemant TakkarUPRERAAGT19312
36Himanshu AroraUPRERAAGT23269
37HOMES AND DESIRE CONSULTING PRIVATE LIMITEDUPRERAAGT22961
38Homesfy Realty LimitedUPRERAAGT25373
39INDARJEET KUMARUPRERAAGT21162
40INVESTOR HOMEZUPRERAAGT15046
41INVESTORS CLINIC INFRATECH PRIVATE LIMITEDUPRERAAGT10052
42INVESTORS HOUSE INFRA INDIAUPRERAAGT14576
43Investors-LabUPRERAAGT11593
44INVESTOXPERT ADVISORS PVT LTDUPRERAAGT21108
45JITENDRA KUMARUPRERAAGT23285
46Kamal KantUPRERAAGT12236
47Kamal kishorUPRERAAGT25486
48KAMLESH BATRAUPRERAAGT24951
49KARTIK INFRATOWN PRIVATE LIMITEDUPRERAAGT10413
50KAWAL DUAUPRERAAGT19677
51Kishor kunalUPRERAAGT20650
52KULDEEP SANGWANUPRERAAGT11397
53LALIT KUMAR VERMAUPRERAAGT19111
54Lokesh UpadhyayUPRERAAGT22203
55Manav SharmaUPRERAAGT11086
56Maztro Consulting LLPUPRERAAGT12053
57Mohan singhUPRERAAGT13958
58MOHD MUSTUFAUPRERAAGT24984
59Mohit GoelUPRERAAGT23121
60Mukesh Kumar GuptaUPRERAAGT25543
61muskan realtorsUPRERAAGT10510
62NANCY KANSALUPRERAAGT24042
63NISHA KUMARIUPRERAAGT15480
64Nishant BatraUPRERAAGT10859
65Nobroker Technologies Solutions Private LimitedUPRERAAGT21390
66PAPPU KUMAR RAYUPRERAAGT25491
67PC MANTRA INFOSYSTEM PVT. LTD.UPRERAAGT10580
68Priyanka JainUPRERAAGT23440
69PROP- KEYS CONSULTING PRIVATE LIMITEDUPRERAAGT23188
70PROPERTY EXPERT REALTORS PRIVATE LIMITEDUPRERAAGT23257
71PROPSHOPUPRERAAGT10129
72PROPZONE INFRATECHUPRERAAGT10285
73Rahul Kumar SinghUPRERAAGT12319
74raj kumar prajapatiUPRERAAGT22715
75RAJEEV KUMARUPRERAAGT10524
76Rajesh BhandariUPRERAAGT23434
77RAJESH KUMARUPRERAAGT20519
78RAVI SHANKAR PATELUPRERAAGT22147
79RAVINDRA SINGHUPRERAAGT24803
80REAL HOMEZUPRERAAGT11572
81Reeta SharmaUPRERAAGT26159
82Rekha SrivastavaUPRERAAGT24194
83Robin GuptaUPRERAAGT24026
84Rohit JainUPRERAAGT13465
85Sandeep Kumar MandalUPRERAAGT25065
86SANG INFRATECH PVT. LTD.UPRERAAGT10024
87Sanju KumariUPRERAAGT21074
88Satendra KumarUPRERAAGT13575
89Satyam KaushikUPRERAAGT20535
90SHREE SAI ASSOCIATESUPRERAAGT11846
91SONIA HIRAUPRERAAGT24546
92SOURAV CHAUDHARYUPRERAAGT26386
93SQUARE YARDS CONSULTING PRIVATE LIMITEDUPRERAAGT10119
94Subhash ChandraUPRERAAGT25045
95SUDEEP SRIVASTAVUPRERAAGT25290
96Sumit SahaniUPRERAAGT16151
97Tarun KumarUPRERAAGT20174
98Tehseen KhanUPRERAAGT23481
99Trisol RED Infraventures Pvt LtdUPRERAAGT11579
100TRUHOMES REALTYUPRERAAGT10997
101VEENU SHARMAUPRERAAGT16128
102Vinay PandeyUPRERAAGT23821
103Vinod kumar bhatnagarUPRERAAGT15345
104Vipul AgarwalUPRERAAGT23210
105VISHAL KUMAR PALUPRERAAGT19171
106VIVEK TYAGIUPRERAAGT11988
107VIVEK TYAGIUPRERAAGT19637
108Vivekanand ShuklaUPRERAAGT21638
109Yogendra KumarUPRERAAGT26097
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

2 permits

An approval and the date it runs to - not proof the work matching it was done.

2 sanctioning permits are on record with UPRERA, the latest valid to 24 Nov 2019. 1 of them carries a revalidation, valid to 7 Dec 2026.

Sanctioned by Greater Noida Authority · 13,890 sqm of land · an approved plan of 4 blocks and 666 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
BP-3089/GH/FTS-885725 Nov 20143 Jun 20183 Jun 202330 Nov 2022—
BP-3089/GH/FTS-885725 Nov 201424 Nov 20197 Dec 202629 May 202325 Nov 2014
valid to 7 Dec 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
no file published
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 3 completion extensions for this project, the latest running to 30 Nov 2026.

#Granted fromExtended uptoNote
130 Nov 202229 May 2023Six months extension in view of force majeure caused by covid-19 pandemic
229 May 202328 Feb 2025—
328 Feb 202530 Nov 2026—

Land & documents

16 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
--—
GH01A121231.41Plot
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 19 Oct 2012.

Registry no.DateTypeArea
2012719 Oct 2012self—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Allotment letter from the authority · BRS-04/2010
The development authority’s letter allotting the plot - usually the step before a lease deed is executed.
PDF ↗
Lease deed · 20127
The deed by which a development authority leased the land to the promoter, with the term and the conditions on it.
PDF ↗
Document checklist
DocumentStatusUploaded
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
not reported—
Completion / occupancy certificate (proforma)
The blank form filed at registration. A proforma is a template on the record, not a certificate that has been issued.
not reported—
Waste disposal plan
How the project proposed to handle sewage and solid waste, as filed at registration.
not reported—
Water supply plan
How the project proposed to supply water, as filed at registration.
not reported—
Electricity supply plan
How the project proposed to supply power, as filed at registration.
not reported—
Development work plan
The internal development the promoter undertook to build - roads, drainage and the rest of the site works.
not reported—
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
not reported—
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
New31 Jul 2018 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
New31 Jul 2018 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
New31 Jul 2018 ↗
Chartered accountant’s certificate
The CA’s certification of the money drawn from the project account against the stage of construction.
New31 Jul 2018 ↗
Architect’s certificate
The architect’s certification of the stage of construction reached - the professional basis for a quarterly percentage.
New31 Jul 2018 ↗
Engineer’s certificate
The engineer’s certification of the cost incurred on construction to date.
New31 Jul 2018 ↗
Registry document (own land)
The registered deed for land the promoter holds itself, rather than under an agreement with a landowner.
Old8 Aug 2017 ↗

Quarterly progress reports

22 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

22 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2025-Q2.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
2025-Q149.08%CA ↗ · Arch ↗ · Eng ↗
2025-Q249.08%CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only; the most recent is 2025-Q2. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal namePanchsheel Buildtech Pvt. Ltd.
RolePromoter · current
RERA IDUPRERAPRM6558
PANAAECP3492N
CIN / TANU45200DL2006PTC156772
Name of chairmanMr. Ashok Chaudhary
Registered addressH-169 Sector 63 Noida, Gautam Buddha Nagar, U.P.
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Gautam Budh Nagar

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
PANCHSHEEL BUILDTECH PRIVATE LIMITED PHASE-V RERA ESCROW ACCOUNTBankHDFC BANKBranchSECTOR-62 NOIDAA/C no.IFSCHDFC0000394
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

8 movements

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026.

FieldWhat movedObserved
Promoter’s complaints tally (all their projects)286 (Under Registration - 4 ) → 286 (Under Registration - 3 )
changed in Estanzo’s record
3 Oct 2026
Promoter’s complaints tally (all their projects)285 (Under Registration - 4 ) → 286 (Under Registration - 4 )
changed in Estanzo’s record
29 Sept 2026
Promoter’s complaints tally (all their projects)285 (Under Registration - 5 ) → 285 (Under Registration - 4 )
changed in Estanzo’s record
23 Sept 2026
Promoter’s complaints tally (all their projects)284 (Under Registration - 4 ) → 285 (Under Registration - 5 )
changed in Estanzo’s record
19 Sept 2026
Promoter’s complaints tally (all their projects)283 (Under Registration - 3 ) → 284 (Under Registration - 4 )
changed in Estanzo’s record
13 Sept 2026
Promoter’s complaints tally (all their projects)281 (Under Registration - 1 ) → 283 (Under Registration - 3 )
changed in Estanzo’s record
31 Aug 2026
Promoter’s complaints tally (all their projects)281 (Under Registration - 2 ) → 281 (Under Registration - 1 )
changed in Estanzo’s record
23 Aug 2026
Promoter’s complaints tally (all their projects)281 (Under Registration - 3 ) → 281 (Under Registration - 2 )
changed in Estanzo’s record
16 Aug 2026
When these facts last moved
Promoter’s complaints tally (all their projects)changed in Estanzo’s record · 3 Oct 2026 · 8 movements on record
These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

What to verify and what to ask

1 not published

Fields UP-RERA has not published for this project. Coverage is uneven, so an absence is not evidence anything is wrong - only something this page cannot answer.

  • No fire-safety provision is published against this project’s registration.Ask which fire-safety approval the project holds or has applied for, and which authority issues it.

Common questions about PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4)

Is PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4) RERA registered?

Yes. PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4) is registered with UPRERA under registration number UPRERAPRJ8595, registered on 12 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

When is possession due for PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4)?

The completion date filed with UPRERA is 30 Nov 2026. No completion certificate is on record yet.

Who is the builder of PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4)?

Panchsheel Buildtech Pvt. Ltd. is the promoter entity that filed PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4) with UPRERA (promoter RERA ID UPRERAPRM6558). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4) more time to complete?

UPRERA's record carries 3 completion extensions for PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4), the latest running to 30 Nov 2026. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4) located?

PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4) is registered in Gautam Budh Nagar, as filed with UPRERA.

What configurations are available in PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4)?

The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4)?

The approved unit plan filed with UPRERA runs from 57 to 84 m² of carpet area (about 609 to 900 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4)?

The approved unit plan describes 4 blocks and 666 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is PANCHSHEEL GREENS - II (TOWER - E6,E7,D3 &D4)?

About 194 units per acre: 666 planned units across 3.43 acres (13,890 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗