RERA status as reported: Registered.

Basic details

The promoter’s own descriptions, published as filed. UP-RERA does not certify them.

RERA IDRERA registration numberThe unique number the authority assigns to a registration - UPRERAPRJ… for a project, UPRERAPRM… for a promoter.Read the full entry in the glossaryUPRERAPRJ5589
Project categoryResidential
Registration typeOngoing
RERA statusRegistered
Sanctioning authoritySanctioning authorityThe local body that approved the building and layout plans - not RERA.Read the full entry in the glossaryGhaziabad Development Authority
Proposed start19 Aug 2015
Original start19 Aug 2015
Project duration114 months
AddressGhaziabad, Ghaziabad
TehsilGhaziabad
Applicant typeCompany
Applicant addressREGD.OFF-90/3A,MALVIYA NAGAR,NEW DELHI-110017 CORP.OFF-D-205,SHYAM PARK EXTN.SAHIBABAD,GHAZIABAD,
Applicant contact

Project timeline

Every dated filing on this project’s record, oldest first. A diamond is a date that was a plan, not something that happened.

  1. Building permit sanctioned

    504/ZONE-1/14-15

  2. Construction start, as declared

    A date on the record, not a filing — what was planned as of this entry.

  3. Registered with RERA

  4. valid to

    Permit revalidated

    MAP20180322144708127

  5. Permit revalidated (2)

  6. 2 building permits sanctioned

  7. to

    Extension granted

    “Six months extension in view of force majeure caused by covid-19 pandemic”

  8. Completion promised at registration

    A date on the record, not a filing — what was planned as of this entry.

  9. to

    Extension granted

  10. Completion certificate filed

  11. Revised completion deadline

    A date on the record, not a filing — what was planned as of this entry.

Published without a date
UPRERA lists this project as Registered. A completion certificate on the record does not change that — RERA accepts them tower by tower, and only this status says a project is complete.
Quarterly report cadence
FY 2020-21
Q1Q2Q3Q4
FY 2021-22
Q1Q2Q3Q4
FY 2022-23
Q1Q2Q3Q4
FY 2023-24
Q1Q2Q3Q4
FY 2024-25
Q1Q2Q3Q4

A filled quarter means a report reached the record. An empty one is a quarter with nothing filed — not a quarter of no work.

Registration & timeline

Dates on the registration itself, not on construction - the quarterly reports carry that.

RERA registered5 Aug 2017
Original completion18 Aug 2023
Revised completion17 Feb 2025
First completion certificate filedCompletion certificate (CC)The certificate saying a project has been built as sanctioned - not the same as permission to move in.Read the full entry in the glossary14 Feb 2025
Registration fee₹64,000
Sanctioning authorityGhaziabad Development Authority

Inventory

derived from unit plan

The approved unit plan, not an availability list: nothing here says what is unsold.

Total units · towers · floors361 · 2 · 17 (units from plan)
  • 2 BHK211 58%
  • 3 BHK150 42%
ConfigurationUnitsCarpet area
2 BHK21148-53
3 BHK15064-65
Tower by tower, as filed
TowerFloorsUnitsCarpet area m²Carpet areaThe net usable floor area inside a flat - the area you could lay a carpet on.Read the full entry in the glossary
B · OTHER, 3 BHK, 2 BHK1728548-65
C · OTHER, 2 BHK107653
Areas are carpet area. For built-upBuilt-up areaCarpet area plus the walls and usually the balcony - a larger number, and one RERA does not define.Read the full entry in the glossary or super areaSuper areaBuilt-up area plus a share of the common space - the largest of the three numbers.Read the full entry in the glossary, check with the builder.

Project team & development works

Who was engaged and what was promised. No status is filed against any of it.

Architect
PREM CHAND TURAI
License CA/75/157
53,SRESTHA VIHAR,DELHI-110092
Engineer
SANJAY JAYASWAL
11/165,VASUNDHARA,GHAZIABAD-
Contractor
A SQUARE-TECH
B 1-2/8,SECTOR-2,RAJINDER NAGAR,SAHIBABAD.GZB-201005
Sr.Development work declared to RERA
1Demarcation of Plots
EAST- OTHER LAND,WEST-ROAD 12 MTR & 24 MTR WIDE,NORTH-A BLOCK,SOUTH-OTHER LAND/OTHER PROJECT
2Boundary Wall
NOT YET STARTED
3Road Work
NOT YET STARTED
4Footpaths
NOT YET STARTED
5Water Supply Including Drinking Water Facilities
NOT YET STARTED
6Sewer System
NOT YET STARTED
7Drain
NOT YET STARTED
8Parks
NOT YET STARTED
9Tree Planting
NOT YET STARTED
10Design For Electric Supply Including Street Lighting
NOT YET STARTED
11Community Buildings
N.A
12Treatment and Disposal System of Sewage and Sullage water
NOT YET STARTED
13Solid Waste Management And Disposal System
NOT YET STARTED
14Water Conservation System
NOT YET STARTED
15Energy Management System Including Use of Renewable Energy
N.A
16Fire Protection And Fire Safety System
NOT YET STARTED
17Social Infrastructure And Other Public Amenities Including Public Health Services
N.A
18Emergency Evacuation Services
NOT YET STARTED
19Other Miscellaneous Work
NOT YET STARTED
Works and their descriptions as declared to RERA. The filing carries no status or percentage per work, so none is shown

Registered agents

2 agents

Agents the promoter filed against this project. A filing, not a recommendation, and not a statement that the registration is still valid.

Sr.AgentRERA registration
1MOHIT MASSONUPRERAAGT20276
2RISHABH JAINUPRERAAGT14347
Agents as filed against this project. The grid does not say whether a registration is still valid, so no validity is shown

Permits & extensions

3 permits

An approval and the date it runs to - not proof the work matching it was done.

3 sanctioning permits are on record with UPRERA, the latest valid to 23 Aug 2023. All 3 carry a revalidation, the latest valid to 23 Aug 2026.

Sanctioned by Ghaziabad Development Authority · 11,774 sqm of land · an approved plan of 2 blocks and 361 units. The plan totals are counted from what the promoter filed with RERA, not a figure the authority published as a total. See the approved unit plan

Permit no.DateValid uptoExtendable uptoRevised endRevalidatedRevalidationThe sanctioning authority renewing a building permit that has expired or is close to expiring.Read the full entry in the glossaryDocuments filed
504/ZONE-1/14-1519 Aug 201518 Aug 202018 Aug 202318 Aug 202323 Oct 2018
valid to 18 Aug 2023
as MAP20180322144708127
504/ZONE-1/14-1518 Aug 202018 Aug 202323 Aug 202617 Feb 202418 Aug 2020
valid to 23 Aug 2026
504/ZONE-1/14-1518 Aug 202023 Aug 202323 Aug 202617 Feb 202418 Aug 2020
valid to 23 Aug 2026
Plans and approvals filed with RERA
DocumentFile
Other plan
A plan the promoter filed that does not fall under the authority’s named headings.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Project approval
The approval the promoter filed as the basis for registering the project.
PDF ↗
Sanctioned layout plan
The approved layout of the whole site: where the towers, roads and open areas sit on the plot.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Sanctioned building plan
The plan the sanctioning authority approved for each building - what was permitted to be built, and at what height and footprint.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Commencement certificate
The sanctioning authority’s permission to begin construction - the document that says work could lawfully start.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Floor plans of all unit types
The approved plan of each unit type, which is what a carpet-area figure is measured from.
PDF ↗
Completion extensions grantedExtensionMore time granted against a project’s registered completion date, on the promoter’s application.Read the full entry in the glossary

UPRERA’s record carries 2 completion extensions for this project, the latest running to 17 Feb 2025.

#Granted fromExtended uptoNote
118 Aug 202317 Feb 2024Six months extension in view of force majeure caused by covid-19 pandemic
217 Feb 202417 Feb 2025—

Land & documents

15 filings

How the promoter says it holds the land. Not a title search - nothing here confirms it is unencumbered.

KhasraKhasra numberThe number a piece of land carries in the state’s own revenue records.Read the full entry in the glossaryAreaType
14621020 SQUARE METER—
1991254.15 SQUARE METER—
14621020Khasra
1991254.15Khasra
Registry & lease deedsRegistry / lease deedThe deed by which the land changed hands, recorded with the sub-registrar and stamped.Read the full entry in the glossary

1 registry or lease-deed filing is on this project’s record with UPRERA, dated 3 Dec 2012.

Registry no.DateTypeArea
3893 Dec 2012other—
Land-title documentsLand-title documentThe paperwork showing how the promoter holds the land - a lease deed, a sale deed, an allotment letter, a khatauni extract.Read the full entry in the glossary
Registry document · 4079
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Registry document · 3803
The deed as registered with the sub-registrar, which is what proves the transfer took place.
PDF ↗
Document checklist
DocumentStatusUploaded
Other
A document the promoter filed under the authority’s catch-all heading; only the file itself says what it is.
New12 Dec 2022 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old24 Oct 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old24 Oct 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old24 Oct 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old24 Oct 2017 ↗
Agreement for other land
The agreement under which the promoter is developing land it does not own - worth reading for who actually holds the title.
Old24 Oct 2017 ↗
Encumbrance details
What the promoter declared is charged against the land - mortgages and other claims that would sit ahead of a buyer.
Old24 Oct 2017 ↗
Application form (proforma)
The blank booking form the promoter filed - the terms a buyer would be asked to sign at booking.
Old24 Oct 2017 ↗
Allotment letter (proforma)
The blank allotment letter on record - what the promoter said it would issue on booking.
Old24 Oct 2017 ↗
Conveyance deed (proforma)
The blank deed by which title would eventually transfer to the buyer or the association.
Old24 Oct 2017 ↗
Affidavit (Form B)
The promoter’s sworn declaration to the authority at registration, including the undertaking about the project account.
Old24 Oct 2017 ↗

Facilities

as declared to RERA

Mostly reference numbers for filings made elsewhere, such as a fire NOC. Not live certifications, and verified by neither RERA nor Estanzo.

Drinking waterBY G.D.A
Fire safety (as filed with RERA)AS PER FIRE N.O.C
Renewable energyAS PER NORMS
Other facilitiesAS PER DRAWINGS

The fire-safety value above is the filing reference UPRERA published for this project, not a live safety certification.

Quarterly progress reports

20 filed reports

The promoter’s own statement, not an inspection. A blank quarter was not reported, not reported as nil.

20 quarterly progress reports are on file with UPRERA, covering 2020-Q1 to 2024-Q4.

QuarterConstructionCertificates
2020-Q1—CA ↗ · Arch ↗ · Eng ↗
2020-Q2—CA ↗ · Arch ↗ · Eng ↗
2020-Q3—CA ↗ · Arch ↗ · Eng ↗
2020-Q4—CA ↗ · Arch ↗ · Eng ↗
2021-Q1—CA ↗ · Arch ↗ · Eng ↗
2021-Q2—CA ↗ · Arch ↗ · Eng ↗
2021-Q3—CA ↗ · Arch ↗ · Eng ↗
2021-Q4—CA ↗ · Arch ↗ · Eng ↗
2022-Q1—CA ↗ · Arch ↗ · Eng ↗
2022-Q2—CA ↗ · Arch ↗ · Eng ↗
2022-Q3—CA ↗ · Arch ↗ · Eng ↗
2022-Q4—CA ↗ · Arch ↗ · Eng ↗
2023-Q1—CA ↗ · Arch ↗ · Eng ↗
2023-Q2—CA ↗ · Arch ↗ · Eng ↗
2023-Q3—CA ↗ · Arch ↗ · Eng ↗
2023-Q4—CA ↗ · Arch ↗ · Eng ↗
2024-Q1—CA ↗ · Arch ↗ · Eng ↗
2024-Q2—CA ↗ · Arch ↗ · Eng ↗
2024-Q3—CA ↗ · Arch ↗ · Eng ↗
2024-Q4—CA ↗ · Arch ↗ · Eng ↗
This project’s record on the UPRERA portal ↗Each row is one quarterly progress reportQuarterly progress report (QPR)The return a promoter files with the authority each quarter, reporting how far the project has got.Read the full entry in the glossary as the promoter filed it. “-” means the quarter was not reported, not 0%. Construction percentages exist for filed quarters only. A certificate opens the document filed for that quarter - the only part of a filing UPRERA publishes at an address of its own; the portal keeps the filing history itself behind the project record, under its QPR page.

Promoter (SPV) details

The legal entity carrying this project’s obligations. It may not be the brand it is marketed under.

Legal nameJAVIN CONSTRUCTION PRIVATE LIMITED
RolePromoter · current
RERA IDUPRERAPRM5902
PANAABCJ4780C
CIN / TANU45201DL2004PTC129831
Name of chairmanSH.SUDHIR KUMAR RAWAT
Registered addressREGD.OFF-90/3A,MALVIYA NAGAR,NEW DELHI-110017 CORP.OFF-D-205,SHYAM PARK EXTN.SAHIBABAD,GHAZIABAD,
RERA contact
Registered since2017
The SPVSPV (special purpose vehicle)A company set up to hold and build one project, and nothing else.Read the full entry in the glossary's RERA-registered details. This is the promoterPromoterThe legal entity that registered the project with RERA and carries its obligations under the Act.Read the full entry in the glossary that filed the project, which may not be the brand it is marketed under.

Nearby projects

Ghaziabad

Straight-line distance between filed coordinates. Not a comparison and not a travel time.

Registered projects within 25 km, by straight-line distance from the coordinates each filed with RERA.

RERA bank accounts

verify before payment

Not confirmation that money is in these accounts, and details change - verify at the source before paying.

Under the Act’s 70% ruleThe 70% ruleThe RERA Act requires 70% of the money collected from a project’s buyers to sit in a separate bank account for that project’s land and construction cost alone.Read the full entry in the glossary, money collected from buyers is to be held in an account reserved for the project. UPRERA publishes what this promoter filed:

One bank account is filed for this project; UPRERA publishes no three-account breakdown for it. What is filed is the account, not what is in it.

AccountAs filed with RERA
Bank account as filed
JAVIN CONSTRUCTION PRIVATE LIMITEDBankDENA BANKBranchCONNAUGHT CIRCUS,NEW DELHI-110001A/C no.IFSCBKDN0710065
⚠ Verify against the official UPRERA source before any payment. Account details can change, never wire funds on this page alone.
Official RERA account page ↗

What has changed on this record

nothing recorded yet

When Estanzo first saw a difference - not proof RERA’s record changed that day.

Estanzo began recording changes to this record on 10 Aug 2026. Nothing has moved since. Anything that changed before that date is not on this list.

These dates are Estanzo’s, not UPRERA’s. They say when Estanzo last saw a field move - not when the authority last checked it, and not when the underlying fact changed. UPRERA does not re-serve every field on every run, so a field with no movement here has not necessarily been re-confirmed.

Common questions about RAJ EMPIRE ( PHASE-II BLOCK B & C )

Is RAJ EMPIRE ( PHASE-II BLOCK B & C ) RERA registered?

Yes. RAJ EMPIRE ( PHASE-II BLOCK B & C ) is registered with UPRERA under registration number UPRERAPRJ5589, registered on 5 Aug 2017. Estanzo reproduces that filing; it does not verify the work behind it.

Has RAJ EMPIRE ( PHASE-II BLOCK B & C ) been completed?

UPRERA still lists RAJ EMPIRE ( PHASE-II BLOCK B & C ) as Registered, so it is not shown as completed here. A completion certificate dated 14 Feb 2025 is on the record - RERA accepts these tower-wise, so one on file does not mean the whole project is complete.

Who is the builder of RAJ EMPIRE ( PHASE-II BLOCK B & C )?

JAVIN CONSTRUCTION PRIVATE LIMITED is the promoter entity that filed RAJ EMPIRE ( PHASE-II BLOCK B & C ) with UPRERA (promoter RERA ID UPRERAPRM5902). RERA registers the legal entity behind a project, which may differ from the brand it is marketed under.

Has UPRERA granted RAJ EMPIRE ( PHASE-II BLOCK B & C ) more time to complete?

UPRERA's record carries 2 completion extensions for RAJ EMPIRE ( PHASE-II BLOCK B & C ), the latest running to 17 Feb 2025. Applying for an extension is a step the RERA Act provides for; the filing records the dates and whatever note accompanied it, and nothing more.

Does RAJ EMPIRE ( PHASE-II BLOCK B & C ) have a RERA bank account?

Yes. The bank accounts filed with UPRERA for this project are listed on this page. Account details can change, so verify them against the official UPRERA source before making any payment.

Where is RAJ EMPIRE ( PHASE-II BLOCK B & C ) located?

RAJ EMPIRE ( PHASE-II BLOCK B & C ) is registered in Ghaziabad, as filed with UPRERA.

What configurations are available in RAJ EMPIRE ( PHASE-II BLOCK B & C )?

The unit plan filed with UPRERA lists OTHER, 2 BHK and 3 BHK. That is the approved plan, not a live availability list - RERA does not publish what is still unsold.

What is the carpet area of flats in RAJ EMPIRE ( PHASE-II BLOCK B & C )?

The approved unit plan filed with UPRERA runs from 48 to 65 m² of carpet area (about 519 to 695 ft²). Carpet area is the net usable floor area the RERA Act defines and the only area the authority holds - a built-up or super-area figure quoted elsewhere is a larger number measured a different way.

How many towers and units are planned in RAJ EMPIRE ( PHASE-II BLOCK B & C )?

The approved unit plan describes 2 blocks and 361 units. UPRERA publishes no separate tower or unit count, so both are counted from that plan.

How dense is RAJ EMPIRE ( PHASE-II BLOCK B & C )?

About 124 units per acre: 361 planned units across 2.91 acres (11,774 m²) as filed with UPRERA. Both figures are the authority's; the division is ours.

Data as reported by UPRERA, as of 21 Oct 2026. official source ↗